Add the previous and current sets
Identify milestone, permit, bid, addendum, bulletin, or construction-document versions and align related sheets.
Compare a previous and current PDF drawing set, organize the changes, and focus review on constructability. Contractors can investigate what changed before pricing or building; architects and engineers can prepare a traceable milestone change narrative.
Separate “something moved on the page” from “this change may affect how the project is coordinated or built.”
Identify milestone, permit, bid, addendum, bulletin, or construction-document versions and align related sheets.
Group added, removed, and revised information by sheet, location, discipline, system, and possible constructability impact.
Review every cited change, then prepare a contractor-facing comparison or a design-team change narrative.
The same verified change can be framed differently for the team receiving it. A contractor may need to understand access, sequence, procurement, or trade coordination. An architect or engineer may need to explain what changed from DD to CD and point to the affected sheets.
Available in request-based betaA drawing difference is not automatically a construction problem or a cost change. The beta workflow helps teams find and organize possible implications; contractors, estimators, architects, and engineers verify the sources and make the project decisions.
Comparing two drawings of the same place in one set, such as stacked floors or an architectural plan against the structural plan, is a different job; see drawing overlay.
Yes. Drawing version comparison is available to beta users upon request for constructability review and source-linked milestone change narratives. Book a demo to discuss your workflow and beta access.
No. The focus is constructability and document change. The workflow may organize changes that deserve an estimator’s attention, but pricing, procurement, and cost validation remain with the contractor and estimating team.
The beta workflow can support comparisons such as Schematic Design to Design Development, DD to Construction Documents, permit resubmissions, bid addenda, bulletins, ASIs, and other issued PDF drawing sets.
If possible, bring a redacted example of two drawing versions, the change narrative or comparison you create today, and the decisions that take the most manual effort. A sample is helpful but not required.
Book 30 minutes to discuss your current revision workflow and the drawing sets you want to compare.