One footing. Conflicting sizes and reinforcement.

Foundation plans and schedules disagree on footing geometry, column reinforcement and tie spacing.

  • Footing marks
  • Column reinforcement
  • Tie spacing
12 pagesProject drawing set
Code check enabledCoordination and code-reference checks
15 findingsPotential issues surfaced for verification
6 examplesConcise review details below

Page and finding counts are generalized for anonymity, not exact project figures.

Reinforced-concrete foundations

Concrete foundation plans, column schedules and reinforcement details.

What the review covered

Concrete foundation plans, column schedules and reinforcement details.

What to verify

Check the conflicting or missing information with the responsible designer.

6 selected examples from the review

Concise summaries; identifying details omitted.

01High priority

Footing details conflict

The plan and schedule give different footing sizes and reinforcement.

Why it matters: Excavation and reinforcement requirements are unclear.

What to check: Issue one coordinated footing detail.

Structural
02Medium priority

Column corner bars are unspecified

The column schedule omits the corner-bar quantity and diameter.

Why it matters: The reinforcement cannot be fully detailed.

What to check: Specify the missing bars.

Structural
03Medium priority

Column-end ties exceed the cited limit

The scheduled tie spacing exceeds the limit calculated from the longitudinal bars.

Why it matters: The reinforcement needs verification against the cited requirement.

What to check: Check the spacing and revise the schedule.

Structural
04Medium priority

Mid-column ties exceed the cited limit

Mid-column tie spacing exceeds the cited limit for the scheduled column widths.

Why it matters: The spacing needs verification against the cited requirement.

What to check: Check the limit and revise the schedule.

Structural
05Medium priority

Foundation bearing assumption is missing

The footing drawings omit the soil bearing capacity and supporting geotechnical report.

Why it matters: The basis for footing sizing is unclear.

What to check: State the bearing capacity and cite its supporting report.

Structural
06Medium priority

Mixed-bar lap rule is inconsistent

The lap note uses the smaller bar where the cited requirement uses the larger bar.

Why it matters: The specified lap may be insufficient.

What to check: Clarify the governing diameter and coordinate lap lengths.

Structural

Review scope and priorities

The review organized the questions by severity, discipline, and source context so the responsible designers could investigate them.

01 · Disciplines

Structural

Check the findings with the responsible discipline designers.

02 · Priorities

High, Medium, and Low priorities

Selected examples retain their assigned priority; count breakdowns are omitted for anonymity.

03 · Review scope

Drawing coordination and code checking

Code checking was enabled alongside the review of plans, schedules, details, and notes.

04 · Evidence

Findings connected to their source context

Groundbook links each finding to the sheets it came from so the responsible designer can confirm or dismiss it.

Potential impacts describe the issue type. They are not verified outcomes from this project.

Follow the information across the complete set

Groundbook reads the documents you upload and reports where they disagree, where a reference does not resolve, and where a required value is absent.

See how a full set is reviewed or how interfaces are coordinated.

  1. 1
    Map the complete set

    Identify sheets, disciplines, details, schedules, and notes.

  2. 2
    Connect repeated information

    Follow tags, references, and requirements wherever they reappear.

  3. 3
    Check drawings and code references

    Read the detected code references alongside the drawing evidence.

  4. 4
    Return findings for verification

    Organize potential issues by severity, discipline, and supporting context.

Questions for professional verification

The output supports the responsible designers as they review the source documents and decide what needs to change.

What this result means

  • Groundbook surfaced potential issues for professional review.
  • Severity helps prioritize which questions to investigate.
  • The findings describe coordination, completeness, and code-reference questions in the uploaded set.
  • Each finding includes source context for verification.

What it does not mean

  • Every potential finding is a confirmed error or violation.
  • The project was unsafe, unbuildable, or ultimately noncompliant.
  • Groundbook replaced the responsible professionals or authority.
  • A correction was made, or any cost or delay was avoided.

About this review

Is this a real review?

Based on a Groundbook review completed in September 2026. Findings are summarized and identifying details omitted. Page and finding counts are generalized for anonymity, not exact project figures.

Are these findings confirmed defects?

No. Each one is a potential issue for the responsible designer to verify against the source documents. Groundbook reports what the documents say and where they disagree. It does not make design decisions, certify compliance, or replace the authority having jurisdiction.

How long did the review take?

Turnaround runs from 20 minutes to 24 hours depending on project size.

Which codes were checked?

Code checking was enabled for this review. Groundbook detects the codes a set references, reads the codes and amendments that governments publish online, and uses licensed codes only where a license allows it.

Can I see a full report?

Yes. The sample plan review report shows all 79 findings from one review of a drawing set and its specifications, with the cited excerpts.

Give the next drawing set a connected first pass

Upload the project, choose the checks that matter, and receive structured potential findings with source context.