They hide in plain sight
Each sheet looks right on its own. The error only shows when you put two sheets side by side.
References · Tags · Schedules · Spelling
Drawing readability review is the drafting part of drawing QA/QC: checking that sheet references, equipment tags, schedules, and notes agree across the set. Groundbook flags potential mismatches and links them to the drawings so your team can verify and correct them.
Why hand this to AI
Use AI to compare repeated references, tags, and schedule entries across the set. Your reviewer confirms each mismatch and routes the correction, leaving senior engineers more time for design and code decisions.
Each sheet looks right on its own. The error only shows when you put two sheets side by side.
Tags, schedules, and sheet numbers are typed by hand. On a live project, they drift apart as the design changes.
A swapped tag can connect pipe to the wrong unit. A wrong callout sends the contractor to the wrong detail.
Matching one tag across dozens of sheets is slow for a person and quick for AI. We read every sheet and check each reference against the rest of the set.
What we check
Add or remove checks in your review instructions. These table examples are illustrative; the published findings follow below.
| Check | What we compare | Example |
|---|---|---|
| Sheet references | Callouts, section marks, and the drawing index against the sheets in the set. | A section mark points to E-605, but the detail is on E-604. |
| Equipment tags | The same unit across plans, enlarged plans, and diagrams. Duplicate and missing tags. | An exhaust fan is EF-2 on the roof plan and EF-3 on the enlarged plan. |
| Schedules and plans | Tags on the plans against schedule rows, including counts and values. | The schedule lists 20 VAV boxes; the plans show 30. |
| Notes and keynotes | Each note against the item it points to. | A smoke exhaust fan points to the note for a normal exhaust fan. |
| Terms and abbreviations | System names and abbreviations across sheets and against the legend. Account for defined aliases. | The legend defines CHWS as chilled-water supply, but a return line is labeled CHWS. |
| Spelling | Notes, schedule headers, and detail titles. | A detail labels the secondary condensate drain “SECONDARY DRAWING.” |
| Your QA/QC checklist | Your firm’s drafting and title-block rules, one item at a time. | Paste the checklist into the review instructions or upload it as a PDF. |
Free editable checklist
The free CSV contains the same seven checks above, with fields for the review milestone, source issue, sheet references, owner, decision, and closure evidence. Open it in your spreadsheet application and use it with or without Groundbook.
Download the seven-check worksheet (CSV)
Record the drawing issue and your firm’s checklist. Identify intentional placeholders, accepted abbreviations, and work that is still provisional at this milestone.
For a mismatched tag, name the plan and schedule or diagram that disagree. For a broken callout, record its source sheet and the intended detail. Assign the question to the responsible designer.
Record the response and revised sheets. Check the tag or callout everywhere it is repeated before marking the item verified; a response saying “updated” alone does not close it.
Drafting rules depend on the project. For an example of owner-issued standards and drawing QA/QC checklists, see Manitoba’s CADD standards for highway drawings. Apply the standards that govern your own package.
For checks across architectural, structural, MEP, and civil requirements, use the broader 39-item construction document review checklist. If the source PDF is hard to read, start with PDF preparation.
From published reviews
These findings come from two published mechanical reviews. Each one is a potential issue for the design team to confirm.
Hydronic plant review · Medium
Two plans tag nine VAV units numbered VAV-39 and up. The schedule ends at VAV-38, so none of them has an inlet size or airflow.
Read the case studyMulti-level MEP coordination · Medium
The ductwork and pipework drawings put the same two tags on opposite units. Following both could connect refrigerant piping to the wrong system.
Read the case studyMulti-level MEP coordination · Low
Section markers on four sheets still point to template drawing numbers, so readers cannot find the sections they refer to.
Read the case studyInside Groundbook
Each finding opens on the sheet, with a box around the exact spot and links to the other sheets involved. Step through findings one at a time, or filter by discipline, file, or label.
How it works
Upload the drawing PDFs. Add your QA/QC checklist if you have one. No code books are needed for these checks.
Name the design phase and what to skip. For example: “50% DD. Blank schedule values are placeholders; do not flag them.” Your instructions are saved for the next project.
Open each finding on the drawing. Dismiss what does not matter and assign the rest to the person who will fix it.
A readability review checks that the set is consistent and easy to follow. It does not check the engineering design or approve the drawings. Your team decides what to fix. For design questions, add a building code review or cross-discipline coordination to the same project.
Questions, answered
It checks that a drawing set says the same thing everywhere and is easy to follow. References lead to the right sheet, tags match, schedules match the plans, and notes are spelled correctly. It covers the drafting part of QA/QC, before engineering judgment.
No. Spelling is one check. The more useful checks compare sheets with each other: a tag on a plan against its schedule row, or a callout against the sheet it points to.
Yes. Download the seven-check CSV worksheet on this page for sheet references, equipment tags, schedules, notes, abbreviations, spelling, and your firm’s rules. It includes blank ownership, source, decision, and closure fields. Use the separate 39-item construction document checklist for a broader discipline and interface review.
Scan quality asks whether text and symbols are legible in the PDF. This review asks whether the information agrees across sheets and whether references lead to the right place. Start with readable source files, then check their content.
Not if you tell us. Write it in the review instructions, for example: “This is 50% DD. Blank schedule values are placeholders.” Instructions are saved, so the next review starts from them.
No. Readability checks compare the set with itself. Add code references only if you also want a building code review.
Yes. Paste the items into the review instructions or upload the checklist as a PDF reference. Each item is checked across the set.
No. It clears the tedious cross-checks first. Your reviewers still decide what to fix and spend their time on design and code questions.
Pay-as-you-go reviews start at $100. The project quote is shown after setup, before payment.