Equipment scheduled. Electrical circuits missing.

Equipment lacks electrical connections, while ventilation selections fall below their own calculations.

  • Services and calculations
  • Emergency ventilation
  • Equipment power
190 pagesProject drawing set
Code check enabledCoordination and code-reference checks
50 findingsPotential issues surfaced for verification
6 examplesConcise review details below

Page and finding counts are generalized for anonymity, not exact project figures.

Shelter services coordination

Shelter mechanical, plumbing, electrical and calculation documents.

What the review covered

Shelter mechanical, plumbing, electrical and calculation documents.

What to verify

Check the conflicting or missing information with the responsible designer.

6 selected examples from the review

Concise summaries; identifying details omitted.

01Medium priority

Equipment circuits are missing

Scheduled fans, pumps, heaters and dryers lack electrical branch circuits.

Why it matters: Their power supply is unresolved.

What to check: Add the circuits and update the electrical diagrams.

Electrical · Mechanical · Plumbing
02Medium priority

Emergency airflow total is incorrect

The airflow inputs exceed the printed total and selected capacity.

Why it matters: The selected supply falls below the calculated demand.

What to check: Correct the total and verify the selection.

Mechanical
03Medium priority

Selected airflow falls below the minimum

The selected airflow is lower than the note’s own air-change calculation.

Why it matters: The selection does not meet the stated minimum.

What to check: Select airflow that meets the calculation.

Mechanical
04Medium priority

Assumed surge protection is missing

The risk calculation assumes surge protection absent from electrical diagrams and specifications.

Why it matters: The calculation relies on an undocumented protection measure.

What to check: Specify the protection or revise the calculation.

Electrical
05Medium priority

Equipment grounding system is undefined

Panels and the generator reference a grounding system absent from the electrical plans.

Why it matters: The grounding connections cannot be verified.

What to check: Show the grounding system, connections and conductors.

Electrical
06Medium priority

Generator ventilation uses another rating

Ventilation calculations use a smaller generator than the electrical drawings specify.

Why it matters: The calculated airflow may be insufficient.

What to check: Confirm the generator and recalculate ventilation from its requirements.

Mechanical · Electrical

Review scope and priorities

The review organized the questions by severity, discipline, and source context so the responsible designers could investigate them.

01 · Disciplines

Mechanical, Electrical, Architectural, Plumbing, Equipment, and General

Check the findings with the responsible discipline designers.

02 · Priorities

Medium and Low priorities

Selected examples retain their assigned priority; count breakdowns are omitted for anonymity.

03 · Review scope

Drawing coordination and code checking

Code checking was enabled alongside the review of plans, schedules, details, and notes.

04 · Evidence

Findings connected to their source context

Groundbook links each finding to the sheets it came from so the responsible designer can confirm or dismiss it.

Potential impacts describe the issue type. They are not verified outcomes from this project.

Follow the information across the complete set

Groundbook reads the documents you upload and reports where they disagree, where a reference does not resolve, and where a required value is absent.

See how a full set is reviewed or how interfaces are coordinated.

  1. 1
    Map the complete set

    Identify sheets, disciplines, details, schedules, and notes.

  2. 2
    Connect repeated information

    Follow tags, references, and requirements wherever they reappear.

  3. 3
    Check drawings and code references

    Read the detected code references alongside the drawing evidence.

  4. 4
    Return findings for verification

    Organize potential issues by severity, discipline, and supporting context.

Questions for professional verification

The output supports the responsible designers as they review the source documents and decide what needs to change.

What this result means

  • Groundbook surfaced potential issues for professional review.
  • Severity helps prioritize which questions to investigate.
  • The findings describe coordination, completeness, and code-reference questions in the uploaded set.
  • Each finding includes source context for verification.

What it does not mean

  • Every potential finding is a confirmed error or violation.
  • The project was unsafe, unbuildable, or ultimately noncompliant.
  • Groundbook replaced the responsible professionals or authority.
  • A correction was made, or any cost or delay was avoided.

About this review

Is this a real review?

Based on a Groundbook review completed in September 2026. Findings are summarized and identifying details omitted. Page and finding counts are generalized for anonymity, not exact project figures.

Are these findings confirmed defects?

No. Each one is a potential issue for the responsible designer to verify against the source documents. Groundbook reports what the documents say and where they disagree. It does not make design decisions, certify compliance, or replace the authority having jurisdiction.

How long did the review take?

Turnaround runs from 20 minutes to 24 hours depending on project size.

Which codes were checked?

Code checking was enabled for this review. Groundbook detects the codes a set references, reads the codes and amendments that governments publish online, and uses licensed codes only where a license allows it.

Can I see a full report?

Yes. The sample plan review report shows all 79 findings from one review of a drawing set and its specifications, with the cited excerpts.

Give the next drawing set a connected first pass

Upload the project, choose the checks that matter, and receive structured potential findings with source context.