Resets that stay protected
Revised racking and merchandise plans are compared with the sprinkler design, so a taller rack or a moved aisle is caught before it is stocked.
Enterprise plan review for home improvement retail
For Fortune 500 and enterprise home improvement chains building and refitting large-format stores. Find racks taller than the sprinkler design, aerosols outside their protected aisle, and garden centers with no sprinkler coverage before the fire marshal does.
Why teams use Groundbook
Revised racking and merchandise plans are compared with the sprinkler design, so a taller rack or a moved aisle is caught before it is stocked.
Paints, aerosols, pool chemicals, and propane are checked against control areas and fire protection, so the floor matches what was approved.
Garden centers, lumber yards, and loading areas get the same review as the building: structure, drainage, power, and sprinkler coverage.
AI plan review for home improvement retailers is a first-pass comparison of a store's racking, merchandise, fire protection, structural, MEP, and site documents with each other, your design standards, and the applicable code. Groundbook flags possible conflicts and gaps with links to the sheets, so your store planning team, the architect, and the fire protection engineer can resolve them before permit.
How it gets there
Each row is a place where the documents for one site often disagree. The review compares them and returns each possible conflict with the sheets it came from.
| Area | What is compared | A question a finding raises |
|---|---|---|
| High-piled storage and in-rack sprinklers | Rack heights, beam levels, commodity classes, and flue spaces against the sprinkler design and high-piled storage plan | Do the in-rack sprinkler levels on the fire protection plan match the beam levels and rack heights on the racking plan? |
| Hazardous materials | Paint, aerosol, pool chemical, and fertilizer locations against the hazardous materials inventory statement and control areas | Is the aerosol aisle where the NFPA 30B protection on the fire protection sheets assumes it is? |
| Garden center | Canopies, greenhouses, irrigation, and drainage against structure, plumbing, electrical, and sprinkler coverage | Is the covered garden center shown with sprinkler coverage on the fire protection plan, as the architectural notes require? |
| Lumber and building materials | Drive-through lumber aisles, cantilever racks, and loading doors against clearances, structure, and traffic routing | Does the cantilever rack height leave the vehicle clearance the drive-through lumber aisle needs? |
| Propane and outdoor storage | Cylinder exchange cabinets and outdoor storage against separation distances, exits, and the site plan | Is the propane exchange cabinet on the site plan at the separation from doors and openings that NFPA 58 requires? |
| Tool rental and pro areas | Tool rental shop, pro desk, and contractor pickup against power, ventilation, and egress | Does the tool rental repair room, where small engines run, have the exhaust shown on the mechanical plan? |
Retail project review checklist · NFPA 400 hazardous materials plan review
In the program
Upload your store prototype, racking and merchandising standards, and hazardous materials guidelines once as references.
Run a review before permit. Findings arrive in 20 minutes to 24 hours, each tied to the sheet and reference behind it.
Overlay a revised racking plan on the previous one with Smart Overlay to see what moved before the sprinkler design is updated.
Assign findings to the architect, the fire protection engineer, or the civil engineer, comment, and export a report or Bluebeam markups.
Enterprise
The review is the same on every plan. Enterprise changes how you buy it, sign in, connect it, and get help.
Volume pricing for programs reviewing 500 or more projects a year, or prepaid credits for up to 15% off. Every review shows its price before you pay.
SSO and MFA, an audit trail, granular access levels, and on-prem or US hosting. Encrypted, never used to train models, and an NDA on request.
Import from Autodesk Construction Cloud (including Revit sheets), SharePoint, Egnyte, ProjectWise, Box, and more, and send findings into your own systems with the REST API, CLI, or a custom integration.
A direct line to our team for onboarding, your review checklists and standards, code sources, and questions about findings.
See everything included in Enterprise · Security · Integrations
Other enterprise programs
Questions, answered
Yes, when the merchandise plan, the hazardous materials inventory statement, and the fire protection drawings are uploaded. The review compares where products are stored with the protection and control areas the drawings show, and flags mismatches for the engineer of record.
Yes. Canopy, greenhouse, irrigation, site, and lumber yard sheets are reviewed with the rest of the store set, so their structure, drainage, power, and sprinkler coverage are checked against each other.
Programs reviewing 500 or more projects a year get volume pricing. Smaller programs can buy prepaid credits for up to 15% off. Every review shows its exact price before you pay, and the first project is free.
No. Groundbook surfaces possible issues with links to their sources. The architects and engineers of record, your own team, and the authority having jurisdiction remain responsible for every decision.
On AWS in the United States by default, or on-prem for programs that need it, encrypted at rest and in transit. Project data is never used to train models and is visible only to the people you invite. SSO and MFA, an NDA, and security questionnaires are available on request.
Tell us how many sites you build or remodel a year and which systems you use. Or try a set yourself: the first project is free.
Check your next store set before permit
Trusted by hundreds of professionals