Package completeness
Compare the drawing index, referenced details, schedules, and deferred-work notes. Identify information that is called for but not clearly included.
Pre-permit plan review
Review the drawings, specifications, and supporting references together before a permit submission. Give your team a focused list of potential issues to resolve while the package is still in your hands.
Where to focus
Compare the drawing index, referenced details, schedules, and deferred-work notes. Identify information that is called for but not clearly included.
Review door and wall information, equipment requirements, levels, and discipline interfaces for statements that cannot all govern at once.
Include the project checklist and applicable code-reference PDFs in the review scope. Check the cited edition, local amendments, and project context before accepting a finding.
Review each potential issue beside its evidence, then record the responsible designer and the information needed to resolve it in your team’s review record.
Inside Groundbook
Choose the files to check, add supporting references, and explain the submission milestone in the review instructions. State known exclusions and deferred packages so the review can be assessed against the intended scope.
A practical workflow
Use the current issue and include the referenced specifications, consultant drawings, and project requirements needed for the review. Keep older issues clearly identified as references.
Start with findings that could change the design or prevent a complete submission. Open the source references and check whether missing context or an exception resolves the question.
Have the responsible designers reconcile affected documents. Check the resulting revision and the local submission requirements before sending the package.
From a published project review
Notes and approval conditions required sprinkler, alarm, and waterfront standpipe systems, but the deferred-submittal list identified only a different system.
Read the findingA pre-permit review helps your team prepare a submission. Permit acceptance, required approvals, and the jurisdiction’s review remain separate steps. Confirm the current local requirements with the relevant authority.
Download the review checklist (CSV)Questions, answered
No. Groundbook identifies potential document issues for review. The jurisdiction’s process and required professional approvals still apply.
Start with the intended submission set, then add the specifications, schedules, consultant information, code sources, and project checklists needed for the stated scope. Clearly distinguish current files from supporting or superseded references.
Run it when the disciplines are coordinated enough to review together and your team still has time to verify findings and revise the package. The useful milestone depends on the project and submission requirements.
Keep exploring
Prepare a coherent drawing package for AI review: current revisions, readable PDFs, complete references, file roles, and clear project-specific instructions.
ExploreUse a practical checklist with ownership and closure fields.
ExploreRun a construction document review from scope and document register to source-backed comments, designer responses, and verified closure. Includes a free review log.
ExploreSet up a review or talk through your project with our team.