We’re at NCSEA in San Francisco, Oct 28–29 · Booth 110NCSEA · Booth 110 · Oct 28–29

Roof condenser counts do not match the indoor equipment assignments.

Apartment labels and equipment assignments imply different heat pump quantities from the mechanical roof plan.

  • Outdoor air
  • Heat pump quantities
  • Equipment tags
  • Energy documentation
20 pagesMechanical permit drawing set
Code check enabledCoordination and code-reference checks
15 findingsPotential issues surfaced for verification
6 examplesConcise review details below

Apartment HVAC plan review

An apartment mechanical permit set reviewed across overall plans, enlarged unit layouts, roof plans, equipment schedules, specifications and energy documentation.

What the review compared

The review connected apartment types on the overall plans to enlarged unit layouts and scheduled indoor equipment, then compared the implied quantities with the roof condensers. Conflicting apartment references prevented a consistent equipment count.

Why schedules alone were insufficient

The roof plan used different tags for ductless units, and the energy certificate omitted scheduled systems. Common-room ventilation information was absent from the inspected plans and schedules. Unit airflow and exterior insulation requirements also differed between documents.

What to verify next

The mechanical engineer should reconcile equipment assignments, ventilation design and balancing values across the permit set. Code checking was enabled; the findings require verification against the project’s governing criteria.

6 selected examples from the review

Six distinct findings, summarized for professional verification.

01High priority

Common-room outdoor air is not documented

The inspected common-room plans and schedules show no outdoor-air route or rate.

Why it matters: Ventilation design and pricing inputs are missing.

What to check: Document the outdoor-air design or the approved natural ventilation basis.

Mechanical
02Medium priority

Roof unit tags differ from the schedule

Ductless outdoor units use roof-plan tags that do not match their equipment schedule.

Why it matters: Matching units to equipment data requires assumptions.

What to check: Use consistent tags across the plan and schedule.

Mechanical
03Medium priority

Indoor and outdoor equipment counts disagree

Apartment assignments imply different indoor-unit quantities from the roof plan’s paired condensers.

Why it matters: Equipment ordering quantities remain unresolved.

What to check: Resolve apartment references, then reconcile the equipment counts.

Mechanical
04Medium priority

Energy certificate omits scheduled heat pumps

The energy certificate omits heat pump systems and lists efficiencies that differ from the schedule.

Why it matters: The certificate does not represent the scheduled design.

What to check: Reissue it with coordinated equipment quantities and efficiencies.

Mechanical
05Medium priority

Exterior refrigerant insulation thickness conflicts

The condensing-unit diagram specifies thinner exterior pipe insulation than the mechanical specification requires.

Why it matters: Bidders receive conflicting insulation requirements.

What to check: Agree the exterior insulation thickness and reconcile both documents.

Mechanical
06Medium priority

Unit airflows do not match the schedule

Supply totals and a return grille airflow differ from their fan coil’s scheduled airflow.

Why it matters: Air balancing targets are inconsistent.

What to check: Coordinate the outlets, return grille and equipment schedule.

Mechanical

Review scope and priorities

The review organized the questions by severity, discipline, and source context so the responsible designers could investigate them.

01 · Disciplines

Mechanical

Check the findings with the responsible discipline designers.

02 · Priorities

High, Medium, and Low priorities

Selected examples retain their assigned priority.

03 · Review scope

Drawing coordination and code checking

Code checking was enabled alongside the review of plans, schedules, details, and notes.

04 · Evidence

Findings connected to their source context

Groundbook links each finding to the sheets it came from so the responsible designer can confirm or dismiss it.

Potential impacts describe the issue type. They are not verified outcomes from this project.

Follow the information across the complete set

Groundbook reads the documents you upload and reports where they disagree, where a reference does not resolve, and where a required value is absent.

See how a full set is reviewed or how interfaces are coordinated.

  1. 1
    Map the complete set

    Identify sheets, disciplines, details, schedules, and notes.

  2. 2
    Connect repeated information

    Follow tags, references, and requirements wherever they reappear.

  3. 3
    Check drawings and code references

    Read the detected code references alongside the drawing evidence.

  4. 4
    Return findings for verification

    Organize potential issues by severity, discipline, and supporting context.

Questions for professional verification

The output supports the responsible designers as they review the source documents and decide what needs to change.

What this result means

  • Groundbook surfaced potential issues for professional review.
  • Severity helps prioritize which questions to investigate.
  • The findings describe coordination, completeness, and code-reference questions in the uploaded set.
  • Each finding includes source context for verification.

What it does not mean

  • Every potential finding is a confirmed error or violation.
  • The project was unsafe, unbuildable, or ultimately noncompliant.
  • Groundbook replaced the responsible professionals or authority.
  • A correction was made, or any cost or delay was avoided.

About this review

Is this a real review?

Based on a Groundbook review completed in October 2026. Findings are summarized.

Are these findings confirmed defects?

No. Each one is a potential issue for the responsible designer to verify against the source documents. Groundbook reports what the documents say and where they disagree. It does not make design decisions, certify compliance, or replace the authority having jurisdiction.

How long did the review take?

Turnaround runs from 20 minutes to 24 hours depending on project size.

Which codes were checked?

Code checking was enabled for this review. Groundbook detects the codes a set references, reads the codes and amendments that governments publish online, and uses licensed codes only where a license allows it.

Can I see a full report?

Yes. The sample plan review report shows all 79 findings from one review of a drawing set and its specifications, with the cited excerpts.

Related examples and workflows

Apply this review to your project

Give the next drawing set a connected first pass

Upload the project, choose the checks that matter, and receive structured potential findings with source context.

Check apartment HVAC plans against schedules and energy forms

Trusted by hundreds of professionals