Anonymized AI plan review

Catch coordination risks before they become RFIs, rework, or delays.

Across approximately 60 pages for a six-story mixed-use residential building, Groundbook connected structural and mechanical/plumbing information—and surfaced issues that could otherwise lead to RFIs, redesign, procurement mistakes, field rework, or commissioning delays.

  • Mixed-use residential
  • Six stories
  • Ground-floor commercial
  • Underground parking garage

Project details have been anonymized. Findings are potential issues for professional verification, not final engineering conclusions.

80% accuracyGroundbook internal product benchmark
≈60 pagesStructural and mechanical/plumbing drawings
42 findingsPotential issues surfaced for verification
13 highHigher-priority items to investigate first

The accuracy figure is a Groundbook product benchmark, not a project-specific measurement from this anonymized review.

The project context

A compact set with dense coordination.

A six-story mixed-use building concentrates residential systems, commercial services, structure, parking ventilation, drainage, controls, and life-safety interfaces in one coordinated package.

Information repeated across many views

Equipment tags, floor elevations, pump duties, control sequences, water loads, and structural requirements appeared in plans, schedules, diagrams, details, and specifications. Repetition creates useful cross-checks—and opportunities for drift.

Two disciplines, many interfaces

The review connected structural information with mechanical and plumbing requirements, including openings, floor elevations, sumps, equipment, services, and the references that guide construction.

Multiple issuance stages in one set

Some information had moved through permit and tender revisions. Groundbook looked for cases where a newer requirement existed but the governing source or downstream references remained unclear.

What the review surfaced

Six patterns behind the 42 potential findings.

Each example connects a document issue to the downstream risk it could create if the project team did not resolve it.

01High priority

Unclear governing revision

Two structural schedules carried different requirements, while the set did not clearly state which version governed or update every downstream reference.

If unresolved: Teams could price, detail, or install against different requirements, forcing a late clarification or redesign.

Revision coordination
02High priority

Floor elevations did not agree

Structural and mechanical plans showed the same floor area at elevations that differed by nearly two feet—a cross-discipline question requiring early verification.

If unresolved: Openings, drainage, clearances, and tie-ins could be coordinated to incompatible datums, creating field rework.

Structure ↔ mechanical
03Coordination

A required opening appeared in only one discipline

A sump shown in the mechanical design was not represented in the corresponding structural slab and footing area.

If unresolved: The omission could require late structural review, rerouting, coring, or other corrective field work.

Penetration coordination
04References

Notes pointed to missing or incorrect sheets

Several plan notes sent readers to sheets or details that did not exist in the uploaded set or contained different information.

If unresolved: Reviewers and trades could lose time locating intent, submit RFIs, or proceed from the wrong detail.

Reference integrity
05High priority

Plans, schedules, and controls used different data

Equipment tags, quantities, duties, materials, and operating sequences did not always reconcile across plans, diagrams, schedules, and specifications.

If unresolved: Submittals, purchasing, controls programming, and commissioning could proceed from conflicting requirements.

MEP document consistency
06Quality control

Calculations and unit conversions drifted

Arithmetic totals and metric-imperial conversions included values that did not reconcile with the surrounding design information.

If unresolved: Sizing, pressure, clearance, or quantity decisions could rely on values the coordinated set does not support.

Calculation checks

Potential downstream impact

Document conflicts become project problems when they stay unresolved.

The review did not establish that these outcomes occurred. It gave qualified teams an earlier opportunity to investigate the conditions that can produce them.

01 · Decisions

More RFIs and redesign cycles

Unclear revisions, incompatible elevations, and missing coordination can send questions back through the design team after pricing or construction planning has started.

02 · Procurement

Wrong information reaches submittals and purchasing

Conflicting tags, quantities, duties, and material requirements can carry into equipment selection, fabrication, procurement, and controls programming.

03 · Field work

Late rerouting, openings, and rework

Missing penetrations or cross-discipline mismatches can require new reviews, changed routes, corrective openings, or installation rework in the field.

04 · Turnover

Commissioning and operational uncertainty

Inconsistent sequences, setpoints, tags, and scheduled values can slow functional testing or leave the intended operation unclear at turnover.

Potential impacts are based on the type of coordination issue, not on verified outcomes from this anonymized project.

The review method

Read each page. Connect the repeated facts. Return the evidence.

The value of a coordinated first pass comes from following information wherever it reappears—not treating every drawing as an isolated page.

  1. 1
    Classify the set

    Organize disciplines, sheets, details, schedules, specifications, and repeated project entities.

  2. 2
    Cross-check relationships

    Compare requirements within a discipline and across structural and MEP sources.

  3. 3
    Structure potential findings

    Group possible conflicts, omissions, reference errors, and calculation discrepancies.

  4. 4
    Send evidence to the reviewer

    Return source-linked context so a qualified professional can verify and resolve each item.

Reading the result responsibly

A review queue—not an automatic verdict.

The output expands review coverage while preserving professional judgment and accountability.

What this result means

  • Groundbook surfaced 42 potential issues worth professional investigation.
  • Higher-priority findings can be reviewed before lower-impact document cleanup.
  • Examples crossed revisions, disciplines, schedules, references, and calculations.
  • Each result can be checked against its supporting project context.

What it does not mean

  • Every potential finding is a confirmed design error.
  • The project was noncompliant, unsafe, or unbuildable.
  • Groundbook replaced the responsible architect, engineer, contractor, or authority.
  • Unverified savings, prevented RFIs, or project outcomes can be attributed to the review.

Privacy by design

The lesson is public. The project is not.

This case study uses only a generalized building description and aggregate review results. It intentionally excludes source-document screenshots and information that could identify the project, its location, or its participants.

  • No address or location
  • No people or firm names
  • No project or permit IDs
  • No filenames
  • No drawing numbers
  • No revision dates
  • No exact design values
  • No unredacted screenshots

Questions, answered

About this AI plan review.

What did Groundbook AI review in this case study?

Two structural and mechanical/plumbing drawing files totaling approximately 60 pages for a six-story mixed-use residential building with ground-floor commercial space and a two-level underground parking garage.

What kinds of potential issues did the review surface?

Possible revision conflicts, cross-discipline elevation mismatches, missing coordination elements, broken drawing references, schedule inconsistencies, and calculation or unit-conversion discrepancies.

What could happen if these drawing issues were not addressed?

Depending on professional review and resolution, unresolved drawing conflicts could contribute to RFIs, redesign, incorrect procurement or fabrication, field rework, schedule pressure, and commissioning or operational uncertainty. This case study does not claim that those outcomes occurred on the source project.

Does Groundbook AI replace professional plan review?

No. Groundbook supports qualified professionals with a systematic first pass and traceable evidence. Responsible architects, engineers, contractors, and reviewers verify every finding and retain responsibility for decisions.

How was project privacy protected?

The case study omits the project address, names, firms, identifiers, filenames, drawing numbers, dates, screenshots, and exact design values. Only generalized building information and aggregate results are included.

Give the next drawing set a connected first pass.

Upload the project, review the price before payment, and receive structured potential findings with source context.