Emergency lighting exceeds the specified inverter capacity.

Lighting plans and fixture schedules assign more load than the specified emergency inverters can supply.

  • Emergency lighting
  • Power distribution
  • Equipment supplies
  • Contract scope
2200 pagesDrawings and specifications
Coordination reviewCoordination and completeness within the set
85 findingsPotential issues surfaced for verification
6 examplesConcise review details below

Recreation facility electrical

Electrical, mechanical, architectural and aquatics drawings, plus project specifications, reviewed for electrical coordination.

What the review compared

The lighting plan assigns fixtures to emergency inverters. The fixture schedule gives their wattage. The project specification sets the inverter capacity and requires full brightness on emergency power. Comparing all three exposed a load above the specified capacity.

Why the other documents matter

The review also compared distribution diagrams, panel schedules, equipment schedules and contract specifications. The selected findings leave equipment ratings, power supplies and purchasing responsibilities unresolved.

What to verify next

The electrical engineer and other responsible designers should reconcile each conflict against the source documents. This review checked coordination and completeness; code checking was not enabled.

6 selected examples from the review

Six distinct findings, summarized for professional verification.

01High priority

Emergency inverters have insufficient capacity

The lighting plan’s connected load exceeds the inverter capacity specified in the project manual.

Why it matters: Full-brightness operation on emergency power is unresolved.

What to check: Confirm fixture loads, then resize inverters or regroup the lighting.

Electrical
02Medium priority

Inverter voltage conflicts with its circuits

Specified inverter voltages differ from both their supply circuits and the connected light fixtures.

Why it matters: Equipment selection remains unresolved.

What to check: Coordinate inverter input and output voltages with the drawings.

Electrical
03Medium priority

Panel voltage and supply ratings conflict

The distribution diagram and schedule disagree on panel ratings; the supply is below scheduled demand.

Why it matters: Panel and feeder selection needs confirmation.

What to check: Confirm voltage and demand; coordinate the panel, breaker and feeder.

Electrical
04Medium priority

Pump motor and power supply disagree

The pump schedule specifies a different motor voltage from the electrical equipment and panel schedules.

Why it matters: Motor and circuit selection is unresolved.

What to check: Agree one voltage across both disciplines.

Electrical · Aquatics
05Medium priority

Heater power requirements conflict

Drawn heater circuits and scheduled loads disagree with the circuit requirements in the specification.

Why it matters: The required power supply is unclear.

What to check: Confirm manufacturer requirements before rough-in and reconcile the drawings.

Electrical · Architectural
06Medium priority

Access-control supply responsibility conflicts

Electrical notes and specifications assign the same access-control equipment and wiring to different suppliers.

Why it matters: The contractor’s pricing scope is unclear.

What to check: Align supply responsibilities across the notes and specification.

Electrical

Review scope and priorities

The review organized the questions by severity, discipline, and source context so the responsible designers could investigate them.

01 · Disciplines

Electrical, Mechanical, Architectural, Aquatics, Fire Alarm, Security, Communications, and Conveying

Check the findings with the responsible discipline designers.

02 · Priorities

High, Medium, and Low priorities

Selected examples retain their assigned priority.

03 · Review scope

Coordination and completeness within the set

This review checked the documents against one another. No code check was enabled.

04 · Evidence

Findings connected to their source context

Groundbook links each finding to the sheets it came from so the responsible designer can confirm or dismiss it.

Potential impacts describe the issue type. They are not verified outcomes from this project.

Follow the information across the complete set

Groundbook reads the documents you upload and reports where they disagree, where a reference does not resolve, and where a required value is absent.

See how a full set is reviewed or how interfaces are coordinated.

  1. 1
    Map the complete set

    Identify sheets, disciplines, details, schedules, and notes.

  2. 2
    Connect repeated information

    Follow tags, references, and requirements wherever they reappear.

  3. 3
    Check coordination and completeness

    Compare the documents and identify missing or conflicting information.

  4. 4
    Return findings for verification

    Organize potential issues by severity, discipline, and supporting context.

Questions for professional verification

The output supports the responsible designers as they review the source documents and decide what needs to change.

What this result means

  • Groundbook surfaced potential issues for professional review.
  • Severity helps prioritize which questions to investigate.
  • The findings describe coordination and completeness questions in the uploaded set.
  • Each finding includes source context for verification.

What it does not mean

  • Every potential finding is a confirmed error or violation.
  • The project was unsafe, unbuildable, or ultimately noncompliant.
  • Groundbook replaced the responsible professionals or authority.
  • A correction was made, or any cost or delay was avoided.

About this review

Is this a real review?

Based on a Groundbook review completed in September 2026. Findings are summarized.

Are these findings confirmed defects?

No. Each one is a potential issue for the responsible designer to verify against the source documents. Groundbook reports what the documents say and where they disagree. It does not make design decisions, certify compliance, or replace the authority having jurisdiction.

How long did the review take?

Turnaround runs from 20 minutes to 24 hours depending on project size.

Was a code check included?

No code check was enabled for this review. It covered coordination and completeness within the set. Code checking is available: Groundbook reads the building codes that governments publish online and uses licensed codes only where a license allows it. You can upload a copy you’re licensed to use.

Can I see a full report?

Yes. The sample plan review report shows all 79 findings from one review of a drawing set and its specifications, with the cited excerpts.

Give the next drawing set a connected first pass

Upload the project, choose the checks that matter, and receive structured potential findings with source context.

Check your electrical drawings and specifications together

Trusted by hundreds of professionals