Pitched shingles in the notes. A flat roof drawn.

The review flags conflicting roof assemblies, shifted column positions and inconsistent foundation levels.

  • Roof assemblies
  • Column alignment
  • Foundation levels
84 pagesProject drawing set
Code check enabledCoordination and code-reference checks
45 findingsPotential issues surfaced for verification
6 examplesConcise review details below

Page and finding counts are generalized for anonymity, not exact project figures.

Roof and foundation coordination

Roof specifications, floor plans and foundation sections.

What the review covered

Roof specifications, floor plans and foundation sections.

What to verify

Check the conflicting or missing information with the responsible designer.

6 selected examples from the review

Concise summaries; identifying details omitted.

01Medium priority

Roof assemblies conflict

The notes describe pitched shingles; the drawings show a flat membrane roof.

Why it matters: Roofing and insulation requirements are unclear.

What to check: Coordinate one roof assembly.

Architectural
02Medium priority

Column positions shift between levels

A ground-floor column is offset from the upper column and foundation.

Why it matters: The load path needs clarification.

What to check: Confirm alignment or detail the intended load transfer.

Architectural · Structural
03Medium priority

Foundation levels conflict

One section places the foundation lower than the other sections.

Why it matters: The setting-out depth is unclear.

What to check: Coordinate the governing foundation level.

Architectural · Structural
04Medium priority

Drainage pipe misses the foundation opening

The sloping sewer pipe reaches the foundation below its scheduled opening.

Why it matters: The pipe cannot follow its shown route through the opening.

What to check: Coordinate pipe levels and the foundation opening.

Architectural · Plumbing
05Medium priority

Door does not fit below the lintel

The lintel height is lower than the scheduled door frame and opening.

Why it matters: The scheduled door cannot fit as detailed.

What to check: Coordinate the lintel and door heights.

Architectural
06Medium priority

Floor build-up labels are swapped

Floor build-up labels reverse the tile and laminate assemblies shown in the finish schedule.

Why it matters: The assembly assigned to each finish is unclear.

What to check: Correct the labels and coordinate the views.

Architectural

Review scope and priorities

The review organized the questions by severity, discipline, and source context so the responsible designers could investigate them.

01 · Disciplines

Architectural and Civil

Check the findings with the responsible discipline designers.

02 · Priorities

Medium and Low priorities

Selected examples retain their assigned priority; count breakdowns are omitted for anonymity.

03 · Review scope

Drawing coordination and code checking

Code checking was enabled alongside the review of plans, schedules, details, and notes.

04 · Evidence

Findings connected to their source context

Groundbook links each finding to the sheets it came from so the responsible designer can confirm or dismiss it.

Potential impacts describe the issue type. They are not verified outcomes from this project.

Follow the information across the complete set

Groundbook reads the documents you upload and reports where they disagree, where a reference does not resolve, and where a required value is absent.

See how a full set is reviewed or how interfaces are coordinated.

  1. 1
    Map the complete set

    Identify sheets, disciplines, details, schedules, and notes.

  2. 2
    Connect repeated information

    Follow tags, references, and requirements wherever they reappear.

  3. 3
    Check drawings and code references

    Read the detected code references alongside the drawing evidence.

  4. 4
    Return findings for verification

    Organize potential issues by severity, discipline, and supporting context.

Questions for professional verification

The output supports the responsible designers as they review the source documents and decide what needs to change.

What this result means

  • Groundbook surfaced potential issues for professional review.
  • Severity helps prioritize which questions to investigate.
  • The findings describe coordination, completeness, and code-reference questions in the uploaded set.
  • Each finding includes source context for verification.

What it does not mean

  • Every potential finding is a confirmed error or violation.
  • The project was unsafe, unbuildable, or ultimately noncompliant.
  • Groundbook replaced the responsible professionals or authority.
  • A correction was made, or any cost or delay was avoided.

About this review

Is this a real review?

Based on a Groundbook review completed in September 2026. Findings are summarized and identifying details omitted. Page and finding counts are generalized for anonymity, not exact project figures.

Are these findings confirmed defects?

No. Each one is a potential issue for the responsible designer to verify against the source documents. Groundbook reports what the documents say and where they disagree. It does not make design decisions, certify compliance, or replace the authority having jurisdiction.

How long did the review take?

Turnaround runs from 20 minutes to 24 hours depending on project size.

Which codes were checked?

Code checking was enabled for this review. Groundbook detects the codes a set references, reads the codes and amendments that governments publish online, and uses licensed codes only where a license allows it.

Can I see a full report?

Yes. The sample plan review report shows all 79 findings from one review of a drawing set and its specifications, with the cited excerpts.

Give the next drawing set a connected first pass

Upload the project, choose the checks that matter, and receive structured potential findings with source context.