Why mass timber needs earlier drawing reviews

On a conventional project, many coordination problems are found and fixed during construction. On a mass timber project, the panels are cut months before they reach the site, so problems in the drawings have to be found before fabrication.

Mass timber needs drawing reviews earlier because penetrations, connections, and interfaces are fixed when the panels are fabricated, long before installation. Plan reviews at design milestones and before the shop drawing push, so coordination is finished while changes are still cheap.

Coordination moves months earlier

In a WoodWorks workshop presentation on mass timber schedule management (November 2019), Swinerton Mass Timber described the goal as coordination occurring 3 to 6 months earlier in the project than conventional practice, and called it a big shift. The same presentation says all factory penetrations must be finalized during the shop drawing process, and that other structural trades must have their shop drawings and 3D model approved and locked for fabrication before timber detailing starts, or risk rework.

WoodWorks guidance on holes and penetrations recommends modeling as many openings as possible so the manufacturer cuts them. The WoodWorks BC Mass Timber Construction Success Checklist (April 2025) warns that penetrations not fully coordinated before tender can delay fabrication. Sources verified October 22, 2026.

What late coordination costs

The Swinerton presentation lists the effects of late answers. Lingering questions from shop drawing review could drag on for weeks or months if not addressed definitively. If the delivery method does not allow early constructability review, the team should budget more time for RFIs and shop drawings. It also notes that manufacturer availability was ranging 3 to 10 months out at the time, so a delay in the drawings can push a production slot.

Once a panel is cut, a missing opening becomes a field cut that the engineer and supplier must accept, or a replacement panel. Both cost more than a comment on a drawing.

When to review, and what each review settles

Drawing reviews on a mass timber projectSwipe or scroll sideways to read all columns.
MilestoneReview focusWhy it matters for timber
Schematic designGrid, spans, panel direction, and the structural system across disciplines.Grid and span choices drive panel sizes, repetition, and cost.
Design developmentConstruction type, exposed and protected timber, main MEP routes, shafts, and large openings.Major openings and service zones are easiest to change before structure is detailed.
Construction documentsEvery penetration, connection, and interface with concrete and steel across all disciplines.This is the set the fabricator details from.
Before shop drawingsOpen questions and RFIs from earlier reviews, plus any late MEP changes.The presentation says factory penetrations are finalized during shop drawings.
Shop drawing reviewFabricator drawings against the contract drawings and specifications.The last chance to fix information before the panels are cut.

Make early reviews count

  • Review all disciplines together. Most timber problems sit between the MEP plans and the structural panel layout, so a single-discipline review misses them.
  • Include the specifications. Field-cut limits, hardware scope, moisture limits, and finish requirements often live only in the specifications.
  • Close every comment. Track each question to a decision and a revised sheet. An open comment at shop drawings is the kind of lingering question the Swinerton presentation warns about.
  • Recheck each revision. A design change after a review can reopen interfaces that were already settled.

Where Groundbook fits

Groundbook reviews the drawings, specifications, and references you upload and flags potential conflicts with links to each source sheet. Use a cross-discipline review at each milestone. When the revised set comes back, a recheck shows which earlier issues are Fixed, Still Open, or New, and keeps every review version. Your team decides what each finding means. Groundbook does not check structural capacity, fire ratings, or the fabricator’s model.

Questions, answered

FAQs

When should mass timber drawings be reviewed?

At each design milestone and again before the shop drawing process, because factory penetrations and connections are finalized during shop drawings and fabrication. Waiting for construction is too late.

How much earlier does mass timber coordination happen?

A WoodWorks workshop presentation by Swinerton Mass Timber described the goal as coordinating 3 to 6 months earlier than conventional practice.

What happens if a CLT panel is missing an opening?

The opening is either cut in the field, which the structural engineer and supplier must accept, or the panel is remade. Both take time and cost more than resolving it in the drawings.

Does an early review replace shop drawing review?

No. Early reviews reduce what is left to resolve, but the design team still reviews the fabricator’s shop drawings against the contract documents before production.

Bring your next set into focus

Set up a review or talk through your project with our team.

Find coordination gaps before fabrication

Trusted by hundreds of professionals