Architecture and structure specify different brick support systems.

The structural drawings call for steel angles and lintels. Architectural details show a different bracket system.

  • Brick support
  • Exterior insulation
  • Flashing
  • Balcony waterproofing
160 pagesDrawings and specifications
Code check enabledCoordination and code-reference checks
40 findingsPotential issues surfaced for verification
6 examplesConcise review details below

Senior-living exterior renovation

Architectural and structural exterior renovation drawings compared with project specifications for masonry, insulation, cladding and waterproofing.

What the review compared

The review compared architectural assemblies and envelope details with structural masonry supports and project specifications. The same brick veneer received different support systems in the two disciplines.

What the specifications leave unresolved

Drawn exterior insulation lacked corresponding product and thermal requirements. Deck waterproofing lacked a defined membrane system, while a balcony callout led to a different waterproofing build-up. Tie and flashing notes also disagreed with the masonry specification.

What to verify next

The architect and structural engineer should resolve the envelope assemblies and support details before trade pricing. Code checking was enabled, but these six examples concern coordination and specification completeness.

6 selected examples from the review

Six distinct findings, summarized for professional verification.

01Medium priority

Brick support systems conflict

Structure specifies steel angles and lintels where architectural details show a bracket support system.

Why it matters: Masonry and steel pricing scopes disagree.

What to check: Select one support system and align the details.

Architectural · Structural
02Medium priority

Exterior insulation lacks product requirements

Wall assemblies require outboard insulation, but the specification covers only insulation between framing members.

Why it matters: Product selection and thermal performance are undefined.

What to check: Specify the exterior layer and coordinate its installation.

Architectural
03Medium priority

Column brick ties conflict with specifications

Column details call for corrugated ties; the specification requires adjustable two-piece veneer ties.

Why it matters: The masonry connection requirements disagree.

What to check: Align the details with the specification or document an accepted exception.

Architectural
04Medium priority

Flashing upstand is below the specified height

A canopy-column detail shows a shorter membrane upstand than the masonry specification requires.

Why it matters: The flashing installation instructions disagree.

What to check: Reconcile the detail and specification for this condition.

Architectural
05Medium priority

Deck waterproofing system is unspecified

The deck assembly requires a waterproofing membrane without identifying its product or layer construction.

Why it matters: Bidders may select different systems.

What to check: Specify the membrane and coordinate it with the drawn deck assembly.

Architectural
06Medium priority

Balcony tag points to another membrane system

The balcony assembly specifies vinyl waterproofing, but its edge detail shows a membrane beneath pedestal pavers.

Why it matters: The balcony build-up is unclear.

What to check: Agree the assembly and correct the tag or edge detail.

Architectural

Review scope and priorities

The review organized the questions by severity, discipline, and source context so the responsible designers could investigate them.

01 · Disciplines

Architectural and Structural

Check the findings with the responsible discipline designers.

02 · Priorities

Medium and Low priorities

Selected examples retain their assigned priority.

03 · Review scope

Drawing coordination and code checking

Code checking was enabled alongside the review of plans, schedules, details, and notes.

04 · Evidence

Findings connected to their source context

Groundbook links each finding to the sheets it came from so the responsible designer can confirm or dismiss it.

Potential impacts describe the issue type. They are not verified outcomes from this project.

Follow the information across the complete set

Groundbook reads the documents you upload and reports where they disagree, where a reference does not resolve, and where a required value is absent.

See how a full set is reviewed or how interfaces are coordinated.

  1. 1
    Map the complete set

    Identify sheets, disciplines, details, schedules, and notes.

  2. 2
    Connect repeated information

    Follow tags, references, and requirements wherever they reappear.

  3. 3
    Check drawings and code references

    Read the detected code references alongside the drawing evidence.

  4. 4
    Return findings for verification

    Organize potential issues by severity, discipline, and supporting context.

Questions for professional verification

The output supports the responsible designers as they review the source documents and decide what needs to change.

What this result means

  • Groundbook surfaced potential issues for professional review.
  • Severity helps prioritize which questions to investigate.
  • The findings describe coordination, completeness, and code-reference questions in the uploaded set.
  • Each finding includes source context for verification.

What it does not mean

  • Every potential finding is a confirmed error or violation.
  • The project was unsafe, unbuildable, or ultimately noncompliant.
  • Groundbook replaced the responsible professionals or authority.
  • A correction was made, or any cost or delay was avoided.

About this review

Is this a real review?

Based on a Groundbook review completed in October 2026. Findings are summarized.

Are these findings confirmed defects?

No. Each one is a potential issue for the responsible designer to verify against the source documents. Groundbook reports what the documents say and where they disagree. It does not make design decisions, certify compliance, or replace the authority having jurisdiction.

How long did the review take?

Turnaround runs from 20 minutes to 24 hours depending on project size.

Which codes were checked?

Code checking was enabled for this review. Groundbook detects the codes a set references, reads the codes and amendments that governments publish online, and uses licensed codes only where a license allows it.

Can I see a full report?

Yes. The sample plan review report shows all 79 findings from one review of a drawing set and its specifications, with the cited excerpts.

Related examples and workflows

Apply this review to your project

Give the next drawing set a connected first pass

Upload the project, choose the checks that matter, and receive structured potential findings with source context.

Reconcile envelope details before trade pricing

Trusted by hundreds of professionals