The stair does not fit the client’s brief.

The review flags a blocked stair arrival and dimensions that fall outside the client’s requested limits.

  • Client layout requirements
  • Stair geometry
  • Bedroom dimensions
12 pagesProject drawing set
Code check enabledCoordination and code-reference checks
10 findingsPotential issues surfaced for verification
6 examplesConcise review details below

Page and finding counts are generalized for anonymity, not exact project figures.

Multistory stair and room layout

Multistory stair and room layouts checked against the client’s brief.

What the review covered

Multistory stair and room layouts checked against the client’s brief.

What to verify

Check the conflicting or missing information with the responsible designer.

6 selected examples from the review

Concise summaries; identifying details omitted.

01Medium priority

Window blocks the stair arrival

A window crosses the stair’s arrival path at the landing.

Why it matters: The route into the landing is unclear.

What to check: Resolve the window position and clear passage.

Architectural
02Medium priority

Stair rise exceeds the client’s limit

The drawn riser count cannot span the floor height within the client’s maximum riser height.

Why it matters: The stair does not fit the requested dimensions.

What to check: Recalculate the risers against the client’s brief.

Architectural
03Medium priority

Bedroom depth falls below the brief

Bedroom depths are below the client’s requested minimum.

Why it matters: The room layouts do not meet the brief.

What to check: Revise the layouts or confirm a revised brief.

Architectural
04Medium priority

Bedroom width falls below the brief

Another bedroom is narrower than the client’s requested minimum on multiple floors.

Why it matters: The layout does not match the brief.

What to check: Revise the width or confirm the client’s requirement.

Architectural
05Medium priority

Roof level repeats the floor below

The roof plan repeats the lower floor’s level despite a connecting stair.

Why it matters: The roof level and stair rise disagree.

What to check: Coordinate the roof level with the stair.

Architectural
06Medium priority

Stair opening dimensions conflict

Opposite dimension strings give different lengths for the same stair opening.

Why it matters: The opening cannot be set out consistently.

What to check: Coordinate its dimensions with the drawn geometry.

Architectural

Review scope and priorities

The review organized the questions by severity, discipline, and source context so the responsible designers could investigate them.

01 · Disciplines

Architectural

Check the findings with the responsible discipline designers.

02 · Priorities

Medium and Low priorities

Selected examples retain their assigned priority; count breakdowns are omitted for anonymity.

03 · Review scope

Drawing coordination and code checking

Code checking was enabled alongside the review of plans, schedules, details, and notes.

04 · Evidence

Findings connected to their source context

Groundbook links each finding to the sheets it came from so the responsible designer can confirm or dismiss it.

Potential impacts describe the issue type. They are not verified outcomes from this project.

Follow the information across the complete set

Groundbook reads the documents you upload and reports where they disagree, where a reference does not resolve, and where a required value is absent.

See how a full set is reviewed or how interfaces are coordinated.

  1. 1
    Map the complete set

    Identify sheets, disciplines, details, schedules, and notes.

  2. 2
    Connect repeated information

    Follow tags, references, and requirements wherever they reappear.

  3. 3
    Check drawings and code references

    Read the detected code references alongside the drawing evidence.

  4. 4
    Return findings for verification

    Organize potential issues by severity, discipline, and supporting context.

Questions for professional verification

The output supports the responsible designers as they review the source documents and decide what needs to change.

What this result means

  • Groundbook surfaced potential issues for professional review.
  • Severity helps prioritize which questions to investigate.
  • The findings describe coordination, completeness, and code-reference questions in the uploaded set.
  • Each finding includes source context for verification.

What it does not mean

  • Every potential finding is a confirmed error or violation.
  • The project was unsafe, unbuildable, or ultimately noncompliant.
  • Groundbook replaced the responsible professionals or authority.
  • A correction was made, or any cost or delay was avoided.

About this review

Is this a real review?

Based on a Groundbook review completed in September 2026. Findings are summarized and identifying details omitted. Page and finding counts are generalized for anonymity, not exact project figures.

Are these findings confirmed defects?

No. Each one is a potential issue for the responsible designer to verify against the source documents. Groundbook reports what the documents say and where they disagree. It does not make design decisions, certify compliance, or replace the authority having jurisdiction.

How long did the review take?

Turnaround runs from 20 minutes to 24 hours depending on project size.

Which codes were checked?

Code checking was enabled for this review. Groundbook detects the codes a set references, reads the codes and amendments that governments publish online, and uses licensed codes only where a license allows it.

Can I see a full report?

Yes. The sample plan review report shows all 79 findings from one review of a drawing set and its specifications, with the cited excerpts.

Give the next drawing set a connected first pass

Upload the project, choose the checks that matter, and receive structured potential findings with source context.