Both fire service elevators open into a foyer too small for the lobby the code requires.

The code summary promises high-rise fire and life safety features that the floor plans and wall types of this residential tower do not yet show.

  • High-rise life safety
  • Fire-rated enclosures
  • Fire service elevators
  • Accessibility
  • Wall types
  • Code basis
120 pagesArchitectural permit set
Code check enabledCoordination and code-reference checks
40 findingsPotential issues surfaced for verification
8 examplesConcise review details below

High-rise residential tower

An architectural permit set for a residential high-rise over a parking garage: code summary, floor, ceiling and area plans, wall types, sections, details and area schedules.

What the review compared

The review read the architectural permit set for a residential high-rise: the code summary, floor and ceiling plans, area plans and schedules, wall types, sections and details. Code checking was enabled, so the code summary and the plans were read against the codes the review cited, including the city’s own amendments.

Where the set falls short

The code summary cites code editions the city has replaced and a standpipe class its amendments do not allow. Stair and shaft walls carry a lower rating than the code requires, the fire service elevators lack a compliant lobby, no plan shows the fire command center, and the life-safety plans the wall types rely on are missing. Unit doors are too narrow for the accessibility standard, and many walls carry no type.

What to verify next

The architect should update the code basis and resolve the high-rise core, ratings and accessibility items before the permit submittal, then complete the wall types and schedules for pricing. Examples that cite a requirement follow the codes the review cited, and every example is a question for the responsible designers.

8 selected examples from the review

Eight distinct findings, summarized for professional verification.

01High priority

Code summary cites replaced editions

The cover sheet bases the permit on code editions that a newer city ordinance replaced.

Why it matters: The code analysis rests on requirements no longer enforced.

What to check: Update the code list and recheck the analysis.

Architectural · General
02High priority

Stair and shaft walls rated one hour

Stair, stair passage and elevator shaft wall types are rated one hour; the code requires two.

Why it matters: Walls and doors would be built below the required rating.

What to check: Rate them two hours with tested assemblies.

Architectural
03High priority

Fire service elevator lobby is too small

Both fire service elevators open into a foyer below the required lobby size, without stair access.

Why it matters: The core layout would have to change.

What to check: Redesign the lobby with direct access to an exit stair.

Architectural
04High priority

Standpipe class conflicts with a local amendment

The code summary lists Class I standpipes; a city amendment requires Class III with hose cabinets.

Why it matters: No floor plan shows a hose cabinet.

What to check: Change the class and draw the cabinets.

Fire protection · Architectural
05High priority

No fire command center on any plan

The code summary requires a fire command center; none of the floor plans shows one.

Why it matters: Its location cannot be submitted for approval.

What to check: Locate and size the room on a ground level.

Architectural · Fire protection
06High priority

Unit doors too narrow for clear width

Most interior unit doors are leaves too narrow to give the accessibility standard’s clear width.

Why it matters: Hundreds of doors and framed openings would change.

What to check: Enlarge the leaves and add a door schedule.

Architectural
07Medium priority

Life-safety plans are missing

Wall types defer ratings to life-safety plans that the set and its index omit.

Why it matters: Rated walls and occupancy separations cannot be identified.

What to check: Add the plans and state the separation method.

Architectural
08Medium priority

Over a hundred walls tagged with a question mark

The wall type plans tag more than a hundred walls “?” instead of a defined type.

Why it matters: Their construction and ratings cannot be priced.

What to check: Assign a defined type to every wall.

Architectural

Review scope and priorities

The review organized the questions by severity, discipline, and source context so the responsible designers could investigate them.

01 · Disciplines

Architectural, Fire protection, Structural, Mechanical, and Electrical

Check the findings with the responsible discipline designers.

02 · Priorities

High, Medium, and Low priorities

Selected examples retain their assigned priority.

03 · Review scope

Drawing coordination and code checking

Code checking was enabled alongside the review of plans, schedules, details, and notes.

04 · Evidence

Findings connected to their source context

Groundbook links each finding to the sheets it came from so the responsible designer can confirm or dismiss it.

Potential impacts describe the issue type. They are not verified outcomes from this project.

Follow the information across the complete set

Groundbook reads the documents you upload and reports where they disagree, where a reference does not resolve, and where a required value is absent.

See how a full set is reviewed or how interfaces are coordinated.

  1. 1
    Map the complete set

    Identify sheets, disciplines, details, schedules, and notes.

  2. 2
    Connect repeated information

    Follow tags, references, and requirements wherever they reappear.

  3. 3
    Check drawings and code references

    Read the detected code references alongside the drawing evidence.

  4. 4
    Return findings for verification

    Organize potential issues by severity, discipline, and supporting context.

Questions for professional verification

The output supports the responsible designers as they review the source documents and decide what needs to change.

What this result means

  • Groundbook surfaced potential issues for professional review.
  • Severity helps prioritize which questions to investigate.
  • The findings describe coordination, completeness, and code-reference questions in the uploaded set.
  • Each finding includes source context for verification.

What it does not mean

  • Every potential finding is a confirmed error or violation.
  • The project was unsafe, unbuildable, or ultimately noncompliant.
  • Groundbook replaced the responsible professionals or authority.
  • A correction was made, or any cost or delay was avoided.

About this review

Is this a real review?

Based on a Groundbook review completed in November 2026. Findings are summarized.

Are these findings confirmed defects?

No. Each one is a potential issue for the responsible designer to verify against the source documents. Groundbook reports what the documents say and where they disagree. It does not make design decisions, certify compliance, or replace the authority having jurisdiction.

How long did the review take?

Turnaround runs from 20 minutes to 24 hours depending on project size.

Which codes were checked?

Code checking was enabled for this review. Groundbook detects the codes a set references, reads the codes and amendments that governments publish online, and uses licensed codes only where a license allows it.

Can I see a full report?

Yes. The sample plan review report shows all 79 findings from one review of a drawing set and its specifications, with the cited excerpts.

Give the next drawing set a connected first pass

Upload the project, choose the checks that matter, and receive structured potential findings with source context.

Check your high-rise permit set before submittal