The fire safety report rates the gym door to the exit stair; the floor plan does not.

The fire safety report sets ratings for doors, windows, walls and steel, and the architectural drawings leave several of them out.

  • Fire safety report
  • Fire-rated openings
  • Compartment walls
  • Fire access
  • Plumbing coordination
240 pagesDrawings and reports
Code check enabledCoordination and code-reference checks
50 findingsPotential issues surfaced for verification
7 examplesConcise review details below

School extension fire safety report

Civil, architectural and plumbing drawings for an elementary school extension, read with the specifications, technical reports, fire safety report and drawing lists.

What the review compared

The review read the civil, architectural and plumbing drawings for a school extension with the specifications, the technical reports and the fire safety report. Each fire rating, exit and fire access measure in the report was traced to the plans, sections and schedules, and the plumbing drawings were read against the reports.

Where the drawings miss the report

Several doors, windows and walls lack the ratings the fire safety report sets, the steel protection is shorter and of a type the report does not assume, and the fire access gate has no alarm-driven opener. The plumbing drawings leave twelve showers without water, and the reports disagree on how sewage leaves the site.

What to verify next

The architect and the fire safety engineer should carry each rating and measure from the report into the plans, schedules and specifications before pricing. Code checking was enabled; examples that cite a requirement follow the regulations the review cited, and every example is a question for the responsible designers.

7 selected examples from the review

Seven distinct findings, summarized for professional verification.

01High priority

Exit stair door has no fire rating

The report rates the gym door to the exit stair; the plan gives only its size.

Why it matters: Smoke could reach the escape route.

What to check: Add the rating to the plan and door schedule.

Architectural · Fire protection
02High priority

Window into the protected corridor is unrated

Plans show a window from an escape corridor to a roof without the report’s rating.

Why it matters: A standard window would have to be replaced.

What to check: Add the rated fixed glazing to plans and schedule.

Architectural · Fire protection
03High priority

Equipment store walls fall short of their rating

The report needs three-hour walls around the equipment store; the plan draws a thinner block.

Why it matters: The walls would be rebuilt or lined.

What to check: Choose a wall build-up the report rates high enough.

Architectural · Fire protection
04High priority

Steel fire protection falls short

A note specifies 30-minute intumescent paint; the report requires longer protection and does not use paint.

Why it matters: The protection could not be documented at handover.

What to check: Set the rating by location and a board or spray system.

Architectural · Structural · Fire protection
05High priority

Fire access gate has no automatic opener

The report assumes an alarm-opened gate; the site design only provides for a future motor.

Why it matters: The gate would stay shut in a fire.

What to check: Add the operator and wiring, or revise the report.

Fire protection · Civil
06High priority

Twelve gym showers have no water supply

Plans draw showers and their drains; the water plan connects only the washbasins.

Why it matters: The plumbing report also counts too few showers.

What to check: Add hot and cold supplies and update the fixture count.

Plumbing · Architectural
07Medium priority

Sewer pumped in one report, gravity on the plan

The plumbing report adds a pumping station; the site plan and summary connect by gravity.

Why it matters: A pumping station is a large price difference.

What to check: Confirm one connection method across all documents.

Plumbing · Civil

Review scope and priorities

The review organized the questions by severity, discipline, and source context so the responsible designers could investigate them.

01 · Disciplines

Architectural, Fire protection, Plumbing, Civil, and Structural

Check the findings with the responsible discipline designers.

02 · Priorities

High, Medium, and Low priorities

Selected examples retain their assigned priority.

03 · Review scope

Drawing coordination and code checking

Code checking was enabled alongside the review of plans, schedules, details, and notes.

04 · Evidence

Findings connected to their source context

Groundbook links each finding to the sheets it came from so the responsible designer can confirm or dismiss it.

Potential impacts describe the issue type. They are not verified outcomes from this project.

Follow the information across the complete set

Groundbook reads the documents you upload and reports where they disagree, where a reference does not resolve, and where a required value is absent.

See how a full set is reviewed or how interfaces are coordinated.

  1. 1
    Map the complete set

    Identify sheets, disciplines, details, schedules, and notes.

  2. 2
    Connect repeated information

    Follow tags, references, and requirements wherever they reappear.

  3. 3
    Check drawings and code references

    Read the detected code references alongside the drawing evidence.

  4. 4
    Return findings for verification

    Organize potential issues by severity, discipline, and supporting context.

Questions for professional verification

The output supports the responsible designers as they review the source documents and decide what needs to change.

What this result means

  • Groundbook surfaced potential issues for professional review.
  • Severity helps prioritize which questions to investigate.
  • The findings describe coordination, completeness, and code-reference questions in the uploaded set.
  • Each finding includes source context for verification.

What it does not mean

  • Every potential finding is a confirmed error or violation.
  • The project was unsafe, unbuildable, or ultimately noncompliant.
  • Groundbook replaced the responsible professionals or authority.
  • A correction was made, or any cost or delay was avoided.

About this review

Is this a real review?

Based on a Groundbook review completed in October 2026. Findings are summarized.

Are these findings confirmed defects?

No. Each one is a potential issue for the responsible designer to verify against the source documents. Groundbook reports what the documents say and where they disagree. It does not make design decisions, certify compliance, or replace the authority having jurisdiction.

How long did the review take?

Turnaround runs from 20 minutes to 24 hours depending on project size.

Which codes were checked?

Code checking was enabled for this review. Groundbook detects the codes a set references, reads the codes and amendments that governments publish online, and uses licensed codes only where a license allows it.

Can I see a full report?

Yes. The sample plan review report shows all 79 findings from one review of a drawing set and its specifications, with the cited excerpts.

Give the next drawing set a connected first pass

Upload the project, choose the checks that matter, and receive structured potential findings with source context.

Check your drawings against the fire safety report

Trusted by hundreds of professionals