Water at the vanishing edge wall is deeper than the pool code allows.

The hardscape set for a resort’s pools and spa draws water depths, stairs, entries and lighting that differ from the pool code and the accessibility standard the review cited.

  • Pool code
  • Accessible pool entry
  • Vanishing edge
  • Pool barrier
  • Pool lighting
  • Coastal construction permit
30 pagesHardscape and pool drawings
Code check enabledCoordination and code-reference checks
40 findingsPotential issues surfaced for verification
8 examplesConcise review details below

Resort pool deck hardscape

A hardscape set for a resort’s pool deck: pool, spa and vanishing edge plans and sections, deck and paving details and schedules, boardwalk, fence and gate details, and coastal construction permit plans.

What the review compared

The review read the hardscape set for a resort’s pool deck: the pool, spa and vanishing edge plans and sections, the deck and paving details and schedules, the boardwalk, fence and gate details, and the coastal construction permit plans. Code checking was enabled, so the pools, stairs, entries, barrier and lighting were read against the pool code and the accessibility standard the review cited.

Where the pool deck misses the code

Water at the vanishing edge is deeper than the pool code allows, and the lowered deck beside it sits too far down. The pool stairs and the curved stairs to the lowered deck have no handrails, the pool has too few access points, and no lift or sloped entry is shown. The light table reads a minimum as a maximum, the fence details depart from their specification, the coastal construction permit plans lack required content, and the schedule and details name different pool edge materials.

What to verify next

The landscape architect should resolve the depth, handrail, access and accessible entry items before the pool plan review, then align the fence, lighting and edge material details with their specifications and complete the coastal construction permit plans. Examples that cite a requirement follow the codes the review cited, and every example is a question for the responsible designers.

8 selected examples from the review

Eight distinct findings, summarized for professional verification.

01High priority

Vanishing edge exceeds pool code limits

Edge-wall water is deeper than allowed, and the lowered deck sits too far below it.

Why it matters: Fixing it changes the pool floor and the deck grades.

What to check: Reduce the depth and raise the lowered deck.

Landscape
02High priority

Pool stairs have no handrails

The pool stairs and their detail show no handrail; the pool code requires them.

Why it matters: Adding anchors after the coping is built means coring finished work.

What to check: Show handrails anchored in the bottom step and deck.

Landscape
03High priority

Too few pool access points

Stair sets fall short of the pool code’s perimeter spacing, and none serves the deepest water.

Why it matters: Swimmers along the long side have no nearby way out.

What to check: Add access points, including one at the deep water.

Landscape
04High priority

No pool lift or sloped entry

The plan shows only stair entries; the accessibility standard requires a lift or sloped entry.

Why it matters: Adding one late reworks the deck or pool shell.

What to check: Show a lift and its anchor, or a sloped entry.

Landscape
05Medium priority

Pool fence details depart from the specification

The gate footing is half the specified depth, and rail size and color also differ.

Why it matters: Bids and submittals for the pool barrier will differ.

What to check: Make the details and notes match the specification.

Landscape
06Medium priority

Pool light minimum read as a maximum

The light table caps lighting at the level the pool code sets as a minimum.

Why it matters: The pool cannot be approved for night swimming as drawn.

What to check: Meet the minimum, or show a no-night-swimming sign.

Landscape
07Medium priority

Coastal permit plans are incomplete

The coastal construction permit plans are drawn too small and omit control points and work limits.

Why it matters: The application can be found incomplete and the permit delayed.

What to check: Replot at the required scale; add the missing items.

Landscape
08Medium priority

Pool edge materials differ from the schedule

The schedule lists marble for the gutter, coping and treads; details show precast or undecided stone.

Why it matters: Bidders cannot tell whether to price marble or precast.

What to check: Name one product, size and thickness everywhere.

Landscape

Review scope and priorities

The review organized the questions by severity, discipline, and source context so the responsible designers could investigate them.

01 · Disciplines

Landscape

Check the findings with the responsible discipline designers.

02 · Priorities

High and Medium priorities

Selected examples retain their assigned priority.

03 · Review scope

Drawing coordination and code checking

Code checking was enabled alongside the review of plans, schedules, details, and notes.

04 · Evidence

Findings connected to their source context

Groundbook links each finding to the sheets it came from so the responsible designer can confirm or dismiss it.

Potential impacts describe the issue type. They are not verified outcomes from this project.

Follow the information across the complete set

Groundbook reads the documents you upload and reports where they disagree, where a reference does not resolve, and where a required value is absent.

See how a full set is reviewed or how interfaces are coordinated.

  1. 1
    Map the complete set

    Identify sheets, disciplines, details, schedules, and notes.

  2. 2
    Connect repeated information

    Follow tags, references, and requirements wherever they reappear.

  3. 3
    Check drawings and code references

    Read the detected code references alongside the drawing evidence.

  4. 4
    Return findings for verification

    Organize potential issues by severity, discipline, and supporting context.

Questions for professional verification

The output supports the responsible designers as they review the source documents and decide what needs to change.

What this result means

  • Groundbook surfaced potential issues for professional review.
  • Severity helps prioritize which questions to investigate.
  • The findings describe coordination, completeness, and code-reference questions in the uploaded set.
  • Each finding includes source context for verification.

What it does not mean

  • Every potential finding is a confirmed error or violation.
  • The project was unsafe, unbuildable, or ultimately noncompliant.
  • Groundbook replaced the responsible professionals or authority.
  • A correction was made, or any cost or delay was avoided.

About this review

Is this a real review?

Based on a Groundbook review completed in November 2026. Findings are summarized.

Are these findings confirmed defects?

No. Each one is a potential issue for the responsible designer to verify against the source documents. Groundbook reports what the documents say and where they disagree. It does not make design decisions, certify compliance, or replace the authority having jurisdiction.

How long did the review take?

Turnaround runs from 20 minutes to 24 hours depending on project size.

Which codes were checked?

Code checking was enabled for this review. Groundbook detects the codes a set references, reads the codes and amendments that governments publish online, and uses licensed codes only where a license allows it.

Can I see a full report?

Yes. The sample plan review report shows all 79 findings from one review of a drawing set and its specifications, with the cited excerpts.

Give the next drawing set a connected first pass

Upload the project, choose the checks that matter, and receive structured potential findings with source context.

Check your pool deck against the pool code

Trusted by hundreds of professionals