Every height limit on the set is measured from a road crown average that is miscalculated and printed two ways.

The hardscape, grading and pool set for a waterfront home was read before permit, and the road crown that sets its yard, deck and coping limits, the pool barrier and several pool details disagree from sheet to sheet.

  • Pool barrier
  • Crown of road
  • Grade and height limits
  • Waterfront lot
  • Pool and spa sections
  • Site drainage
  • Permit readiness
16 pagesHardscape, grading and pool drawings
Code check enabledCoordination and code-reference checks
25 findingsPotential issues surfaced for verification
12 examplesConcise review details below

Waterfront pool grade limits

Hardscape site plans, grading and drainage plans, pool plans and sections, gate and fence details and a material index for a single-family waterfront home, read against one another and the residential pool barrier and zoning provisions the review cited.

What the review compared

The review read the hardscape set for a single-family waterfront home: site and grading plans, drainage, pool and spa plans and sections, gate and fence details and the material index. Its instructions asked for missing or inconsistent information, drawings checked against specifications, permit readiness, and accessibility, drainage and installation conflicts across the set. Code checking was enabled.

One number behind every limit

The front-yard grade limit, the entry stair limit, the deck limit and the pool coping maximum are all measured from the average crown of the road. The revised average is computed wrong, three sheets still use the earlier reading, and the limits printed beside it are off in both directions, so the driveway corners exceed the limit on their own sheet while a stair note allows grades well above it. The pool barrier relies on the house wall, whose doors open to the pool with no safety feature shown, the gates latch without closing, and the waterside is left open to the seawall without a noted approval. The vanishing edge, the water line, the spa drop and the channel drain disagree between plan and sections.

What to verify next

The landscape architect should recompute the crown average once, rebuild every limit from it and recheck the grades, then settle the barrier on all four sides with the architect and the building official. Examples that cite a requirement follow the residential pool barrier and zoning provisions the review cited; every example is a question for the designer and the building department.

12 selected examples from the review

Twelve distinct findings, summarized for professional verification.

01High priority

House wall closes the barrier

Side fences end at the house, whose glass doors open onto the pool deck.

Why it matters: The barrier relies on doors with no safety feature shown.

What to check: Note alarms or self-closing doors, or add a barrier.

Landscape
02High priority

Gates latch but do not close

Gates are self-latching only, with picket gaps near the latch wider than the code allows.

Why it matters: An open gate leaves the pool unguarded.

What to check: Specify closers and a latch-area shield.

Landscape
03Medium priority

Road crown averaged two ways

The revised average is computed wrong, and three sheets still print the old value.

Why it matters: Every yard, deck and coping limit inherits the error.

What to check: Recompute once and update every sheet and section.

Landscape · Civil
04Medium priority

Driveway corners above the yard limit

Two driveway corner grades exceed the front-yard limit printed on the same sheet.

Why it matters: The plan shows its own grades out of compliance.

What to check: Match the corners to the other driveway and the grading plan.

Landscape
05Medium priority

Waterside left open

Fences stop at the seawall, and a deck stair reaches the pool deck with no gate.

Why it matters: The seawall serves as barrier without a noted approval.

What to check: Note the building official’s approval or add a gated barrier.

Landscape
06Medium priority

Entry stair has no handrail

A six-riser entry stair shows no handrail on the plan or its detail.

Why it matters: Inspection is likely to require one.

What to check: Show the handrail or reference the architect’s detail.

Landscape
07Medium priority

French drain named, never drawn

A sheet title and photo name a French drain; no plan, legend or detail shows it.

Why it matters: It cannot be priced or built.

What to check: Locate it and add a detail with pipe, stone and outlet.

Landscape · Civil
08Medium priority

Vanishing edge above the water line

The edge elevation sits above the water level the coping detail draws.

Why it matters: Water would stand higher than detailed.

What to check: Set one water level and align plan and sections.

Landscape
09Medium priority

Drain detail keeps removed steps

The channel drain detail drops in two steps the revised deck plan no longer has.

Why it matters: The deck could be formed to the old design.

What to check: Redraw it flush or grade the steps on the plan.

Landscape
10Low priority

Stair limit set too high

A stair note prints a grade limit well above the one computed from the crown.

Why it matters: Grades could be built above the zoning limit.

What to check: Replace it with the computed limit on every sheet.

Landscape
11Low priority

Coping maximum left unrevised

The coping maximum still uses the old deck limit after the limit was revised.

Why it matters: The printed maximum allows more than the rule.

What to check: Recompute it from the revised deck limit.

Landscape
12Low priority

Slope label four times the grades

A driveway panel is labeled far steeper than its own spot grades give.

Why it matters: Pavers could be laid to the wrong fall.

What to check: Correct the label or the grades.

Landscape

Review scope and priorities

The review organized the questions by severity, discipline, and source context so the responsible designers could investigate them.

01 · Disciplines

Landscape and Civil

Check the findings with the responsible discipline designers.

02 · Priorities

High, Medium, and Low priorities

Selected examples retain their assigned priority.

03 · Review scope

Drawing coordination and code checking

Code checking was enabled alongside the review of plans, schedules, details, and notes.

04 · Evidence

Findings connected to their source context

Groundbook links each finding to the sheets it came from so the responsible designer can confirm or dismiss it.

Potential impacts describe the issue type. They are not verified outcomes from this project.

Follow the information across the complete set

Groundbook reads the documents you upload and reports where they disagree, where a reference does not resolve, and where a required value is absent.

See how a full set is reviewed or how interfaces are coordinated.

  1. 1
    Map the complete set

    Identify sheets, disciplines, details, schedules, and notes.

  2. 2
    Connect repeated information

    Follow tags, references, and requirements wherever they reappear.

  3. 3
    Check drawings and code references

    Read the detected code references alongside the drawing evidence.

  4. 4
    Return findings for verification

    Organize potential issues by severity, discipline, and supporting context.

Questions for professional verification

The output supports the responsible designers as they review the source documents and decide what needs to change.

What this result means

  • Groundbook surfaced potential issues for professional review.
  • Severity helps prioritize which questions to investigate.
  • The findings describe coordination, completeness, and code-reference questions in the uploaded set.
  • Each finding includes source context for verification.

What it does not mean

  • Every potential finding is a confirmed error or violation.
  • The project was unsafe, unbuildable, or ultimately noncompliant.
  • Groundbook replaced the responsible professionals or authority.
  • A correction was made, or any cost or delay was avoided.

About this review

Is this a real review?

Based on a Groundbook review completed in November 2026. Findings are summarized.

Are these findings confirmed defects?

No. Each one is a potential issue for the responsible designer to verify against the source documents. Groundbook reports what the documents say and where they disagree. It does not make design decisions, certify compliance, or replace the authority having jurisdiction.

How long did the review take?

Turnaround runs from 20 minutes to 24 hours depending on project size.

Which codes were checked?

Code checking was enabled for this review. Groundbook detects the codes a set references, reads the codes and amendments that governments publish online, and uses licensed codes only where a license allows it.

Can I see a full report?

Yes. The sample plan review report shows all 79 findings from one review of a drawing set and its specifications, with the cited excerpts.

Give the next drawing set a connected first pass