Guide · Specifications and drawings · 23 81 23

Check computer room air conditioning specifications against CRAC schedules, raised floor plans, and controls drawings

UFGS Section 23 81 23 Computer Room Air Conditioning Units, a NAVFAC-prepared guide specification issued in November 2020 as a new unified section superseding 23 81 23.00 20, covers HVAC equipment for temperature, humidity, and airflow control in data processing spaces. It specifies downflow, upflow, in-row, and ceiling-mounted CRACs with their fans, coils, filters, reheat, humidifiers, compressors, condensers, dry coolers, economizers, and floorstands, small console and ceiling units for telecommunications closets, hot or cold aisle containment, rack-mounted fans, unit and supervisory controls, leak detection, corrosion protection, electrical requirements, and factory and field testing, with interfaces to Sections 23 23 00, 27 10 00, 09 69 13, and the controls sections.

Start with the CRAC equipment schedule and the issued Section 23 81 23: the notes ask the designer to show each unit’s capacity, efficiency, sound limit, airflow configuration, humidifier capacity, electrical data, and short circuit current rating on the drawings, so confirm that every kept unit type and option has a scheduled tag. Then check that the raised floor, piping, and leak detection plans keep water away from the racks, that the controls drawings list the interface points, and that the schedules give the values the factory and field tests must verify.

Assemble the review package

Gather the CRAC and condenser or dry cooler schedules, the computer room floor plan and raised access floor plan with perforated tile locations, the rack layout and telecommunications room drawings, the chilled water, condenser water, refrigerant, humidifier water, and condensate piping plans, the roof or site plan with outdoor heat rejection equipment, the controls drawings and points list, the electrical one-line and panel schedules, the fire protection and lighting plans for any contained aisles, the seismic details, and the issued Section 23 81 23 with Sections 23 23 00, 23 64 26, 23 30 00, 09 69 13, 27 10 00, 23 09 13, the DDC section, 25 05 11, 23 05 93, and 23 05 48.19. Follow one unit from its schedule line through the floor plan, piping, power, and controls before assuming the others match.

WBDG publishes UFGS 23 81 23: Computer Room Air Conditioning Units as a public guide-specification reference (accessed November 17, 2026). Use your project’s issued specification and amendments for the actual comparison; the guide specification does not automatically govern your project. The checklist below is an original suggested review workflow, not a reproduction of the UFGS requirements.

Eight checks to run against the issued set

Use one record per location or system. The CSV contains the same eight prompts plus fields for source revisions, observed evidence, the review owner, the decision, and closure references.

Eight specification-to-drawing checksSwipe or scroll sideways to read all columns.
CheckSources to compareQuestion to resolve
What the drawings must showOpening note (design parameters on the drawings: capacity, efficiency, sound ratings, motor speeds, electrical characteristics, special features; UFC 3-410-01) + CRAC sound note (NC or dBA limit on the schedule) + Unit Airflow Configuration note + Humidifier note (steam capacity on the schedule) + Cooling Coil note (condensate pump head on the drawings) + Electrical note (SCCR on the schedule or electrical drawings) + Rack Mounted Fans note (fan schedule) + controls notes (interface points on the controls drawings) + CRAC scheduleDoes the CRAC schedule give each unit’s tag, configuration, sensible and total capacity, efficiency basis, sound limit, humidifier capacity, electrical data, and SCCR, is there a fan schedule if rack fans are kept, and do the controls drawings list the interface points the notes ask the designer to coordinate with the owner?
Unit types, airflow, and the raised floorDownflow, Upflow, In-row (match rack height and depth; frames under Section 27 10 00; security and procurement note), and Ceiling Mounted paragraphs + Small CRAC article and System Configuration note (type for each mark on the schedule) + Floorstand (height bracket; seismic rated; gasketed floor penetration; turning vane) + Fan Section (lower fans into the floorstand bracket) + floor register note (keep registers away from units; Section 09 69 13) + floor plans and sectionsDoes each unit’s configuration on the schedule match the plans, with downflow floorstands at the access floor height, in-row units matched to the racks on the telecommunications drawings, and ceiling units with duct or grille connections shown, are perforated tiles placed away from the units as the note advises, and is the small-unit article kept only for the closets that use it?
Efficiency, ratings, and refrigerantEnergy Efficiency (as indicated or by ASHRAE 90.1; the note and the CRAC note cite two different ASHRAE 90.1 table designations for the same requirement) + CRAC paragraph (sensible coefficient of performance by ASHRAE 127; SEER, HSPF, IPLV, or COP brackets; AHRI 1360; UL or ETL listing) + Refrigerants (zero ozone depletion; HCFC and Halon brackets; SDS) + small-unit DX paragraphs (one refrigerant designation fixed in three unbracketed sentences) + ODS technician certification (for refrigerants the section prohibits) + scheduleDoes the schedule state the efficiency metric and rating standard the specifier kept, has the specifier settled which ASHRAE 90.1 table the notes mean, is the refrigerant fixed in the small-unit paragraphs still acceptable for new computer room equipment under current EPA rules, and does the refrigerant on each schedule line match the section?
Coils, heat rejection, and economizersCooling Coil (DX or hydronic; drain pan; condensate pump; coils sealed “prior to evaluation and charging”, also in the condenser and dry cooler coils) + Compressor and Refrigeration Circuit (split-system tubing under Section 23 23 00; heat pump brackets) + Condenser (low-ambient bracket), Air-Cooled, Liquid-Cooled (fouling factor bracket), and Dry Coolers with pump package + Economizers (air, water, or pumped refrigerant; control by CRAC or HVAC controls) + small-unit water or glycol cooled (Section 23 65 00) + roof or site plan and piping plansDoes every remote condenser, dry cooler, or cooling tower implied by the schedule appear on the roof or site plan with its piping and power, is the low-ambient bracket filled for the site climate, does the economizer kept match the water, glycol, or refrigerant system drawn, and does split-system refrigerant piping follow Section 23 23 00?
Water in the room and leak detectionCooling Coil note and HVAC Water Piping note (no hydronic coils or piping directly above racks; limit overhead piping; piping below the raised floor clear of downflow discharge) + piping routing note (mandatory routing around the downflow floorstand, dimensioned in plan and detail) + Humidifier and note (water supply, drain, water chemistry, deionized water for adiabatic types) + Leak Detection and note (spot or rope on the subfloor below the raised floor; extent by tier and owner) + Section 23 64 26 + piping and plumbing plansDo the plans keep chilled water, condenser water, humidifier supply, and condensate piping out from above the racks, route under-floor piping clear of the downflow discharge with dimensions, and show the leak detection extent agreed with the owner, and does the leak detection paragraph fit a room with in-row or ceiling units and no raised floor if that is the design?
Controls, integration, and cybersecurityInstrumentation and Controls note (UFC 4-010-06; Section 25 05 11; points on the controls drawings; rack-mounted sensors; independent room temperature sensor) + Unit Level Controls, Display Panel, and Alarms + Supervisory CRAC Controls (runtime balancing; switch to standby) + Integration to the HVAC control system and UMCS (23 09 23.02 cited as “BACnet Digital Control”; Section 25 10 10) + Small CRAC Controls (same integration bracket) + Electrical Control Wiring (Navy bracket to 23 09 53.00 20; space temperature control system drawings) + Fire Protection Devices + controls drawingsDo the controls drawings show the points list, the interface room, the rack sensor locations, and the independent room temperature sensor, has the specifier chosen one protocol and one control wiring section and corrected the BACnet section title, and does the sequence of operation say how a failed unit hands over to a standby unit?
Containment, rack fans, coatings, and electricalAisle Containment note (coordinate with communications, lighting, and fire protection; extend suppression into contained aisles; same contract as the racks) and paragraph (Section 27 10 00 frames; ASTM E84 or UL 723; UL 94; 16 CFR 1201 doors) + Rack Mounted Fans + Corrosion Protection (Section 09 96 00 cited as “High Performance Coatings”, titled Heat- and Chemical-Resistant Coatings on WBDG) + Electrical (SCCR bracket; NAVFAC SE and other brackets; Section 26 29 23 drives) + Seismic Requirements (23 05 48.19 cited as “Seismic Bracing for HVAC”) + fire protection, lighting, and electrical drawingsIf containment is kept, do the fire protection drawings extend suppression and detection into the contained aisles and do the lighting plans account for the roof panels, is the SCCR on the schedule consistent with the one-line, is one electrical bracket kept, and does the coating paragraph cite the coating section the project actually uses?
Factory and field tests and trainingSource Quality Control (job-specific factory test plans verifying scheduled performance; Performance Variables measured “as part of the field test”; Factory Tests run under the approved “manufacturer’s field test plan”) + witness test note and production schedule bracket + factory sound test bracket and note (distance from test room walls printed with metric and inch-pound values that disagree) + Field Testing (manufacturer’s plans; Section 23 05 93 prerequisite; Test Configuration and Field Tests state different continuous test durations) + Instruction (hours bracket) + CRAC scheduleDoes the CRAC schedule give the entering air, water, or glycol temperatures and the performance values both test plans must verify, has the specifier corrected the factory test paragraphs that point to the field test plan, set one continuous field test duration, fixed the sound test distance, and decided with the owner whether the witness and sound tests are worth their cost?

Worked example: a computer room fit-out with downflow units and a closet unit

Illustrative example: a communications building converts a storage room into a computer room with four downflow chilled water CRACs on floorstands below a raised access floor, plus a small ceiling-mounted unit in a telecommunications closet. The issued Section 23 81 23 keeps the in-row, air economizer, refrigerant economizer, dry cooler, and aisle containment paragraphs, the small-unit DX paragraphs with their fixed refrigerant, and both continuous field test durations. The CRAC schedule lists capacities but no configuration, sound limit, or SCCR, the mechanical plan runs chilled water piping overhead across the rack rows, no leak detection layout is shown, and the controls drawings have no points list.

Ask the mechanical engineer to delete the unit types and options the room does not use, to add configuration, sound limit, and SCCR to the schedule, to reroute the chilled water piping below the raised floor clear of the downflow discharge, to show the leak detection extent agreed with the owner, and to decide whether the closet unit is chilled water or DX. Ask the specifier to confirm the closet unit’s refrigerant, to set one field test duration, to correct the factory test paragraphs and coating citation, and to add the points list the controls drawings must carry.

Avoid a false conflict

Section 23 81 23 covers computer room units, their heat rejection and controls, aisle containment, and rack fans. Refrigerant piping follows Section 23 23 00, chilled and condenser water piping Section 23 64 26, ductwork Section 23 30 00, the raised floor Section 09 69 13, racks and frames Section 27 10 00, controls the DDC sections and Section 25 05 11, seismic bracing Section 23 05 48.19, and fire suppression and detection their own sections, while NFPA 75, NFPA 70, ASHRAE 90.1, and UFC 3-410-01 govern, so check those before calling a requirement missing. Some of the section’s own wording needs resolving: Part 1 has two Qualifications articles, the notes cite two ASHRAE 90.1 tables, three coil paragraphs say evaluation where evacuation is meant, the factory test paragraphs point to the field test, the sound test distance conversions disagree, the field test durations differ, AMCA is cited but not listed, and the coating, seismic, and BACnet section titles do not match WBDG. Ask the specifier which wording the project intends before treating a difference as a design conflict.

When requirements disagree, follow the project’s document-control and clarification process. Do not assume that drawings always override specifications, or the reverse. Identify the exact sources and request an authorized decision.

Close the issue across the affected documents

Record the location or tag, drawing and specification references, issue dates, observed difference, and the decision needed. Assign an owner and keep the item open until the response identifies the governing requirement. Check the revised drawings and specification references together; a response email alone may leave the issued package inconsistent.

For the overall process, use the guide to drawing and specification conflicts. Mark an inapplicable checklist row with a reason, and distinguish a verified correction from a question that still needs design information.

Where Groundbook fits

Groundbook’s drawing and specification review helps investigate potential disagreements in the documents you supply. Include the relevant specification sections and drawing references, then verify the cited evidence with the responsible reviewers before acting on a finding.

Questions, answered

FAQs

What should a computer room air conditioning specification review compare?

Compare what the drawings must show, unit types, airflow, and the raised floor, efficiency, ratings, and refrigerant, coils, heat rejection, and economizers, water in the room and leak detection, controls, integration, and cybersecurity, containment, rack fans, coatings, and electrical requirements, and the factory and field tests and training.

What does UFGS 23 81 23 expect the drawings to show?

The current UFGS 23 81 23 Computer Room Air Conditioning Units on WBDG asks the designer to show each unit’s capacity, efficiency, sound ratings, motor speeds, electrical characteristics, and special features, the airflow configuration and sound limit on the schedule, the condensate pump head, piping routing around downflow floorstands, controls interface points, rack fan data, and the short circuit current rating. UFGS numbers are DoD guide specification numbers, not universal MasterFormat titles, and your project’s issued specification governs.

How is this different from the unitary HVAC and access flooring pages?

UFGS 23 81 00 covers packaged and split unitary equipment for general spaces, and UFGS 09 69 13 covers the raised access floor itself. UFGS 23 81 23 covers equipment built for data processing spaces, with humidity control, floorstands, in-row units, containment, rack fans, leak detection, and factory and field performance tests. On one project, check that the CRAC schedule, the floor plan, and the access floor drawings describe the same units and tile layout.

Can Groundbook check CRAC schedules against Section 23 81 23?

Groundbook compares the drawing set with the specification sections and reference documents you upload, such as your issued Section 23 81 23, the piping, controls, and access floor sections, manufacturer data, and licensed standards you hold, and returns potential conflicts with links to the source pages. It has no built-in code library and does not size cooling equipment, calculate capacity, efficiency, or airflow, design computer rooms, certify compliance, or approve submittals or tests. Each finding is a question for the mechanical engineer, the specifier, or the contracting officer.