Guide · Code reference

International Plumbing Code (IPC) plan review

A plumbing code review checks that fixtures, piping, and risers agree across plans, isometrics, and schedules, and with the rooms they serve. Groundbook can compare those documents with the IPC edition you upload and flag conflicts.

Confirm the IPC edition and amendments the jurisdiction enforces, then trace fixtures, water supply, drainage and vent piping, and risers through the plumbing plans, isometrics, schedules, and architectural plans. AI can flag conflicts; the plumbing engineer confirms sizing and compliance.

What does the IPC cover?

ICC describes the International Plumbing Code as establishing minimum requirements for plumbing systems using prescriptive and performance-related provisions.

ICC publishes the I-Codes as model codes in editions. ICC’s 2024 I-Codes collection includes the IPC, and the ICC IPC overview describes how it is adopted; both were checked on October 1, 2026. States and cities adopt a specific edition, often with amendments, and many still enforce an earlier one. Record the edition and amendments the authority having jurisdiction actually enforces; the newest published edition does not establish local adoption.

Some states adopt the Uniform Plumbing Code instead, and Oregon adopts its own plumbing specialty code. Record which plumbing code the authority enforces before checking fixture counts or piping requirements. The plumbing fixture count explainer covers how fixture counts are reviewed.

Bring plumbing, architecture, and structure together

Collect plumbing floor plans, riser diagrams and isometrics, fixture schedules, water heater and equipment schedules, site utility connections, architectural plans and enlarged toilet room plans, accessibility details, and structural framing where piping penetrates. Add the plumbing specifications.

Fixture locations change often during design. Check that the plumbing fixture schedule and plans match the current architectural layouts.

Trace fixtures and piping through the set

IPC document coordination checksSwipe or scroll sideways to read all columns.
Review questionSources to compareDecision to record
FixturesArchitectural plans, plumbing plans, fixture scheduleIdentify fixtures added, moved, or removed in one document only.
Fixture count basisCode summary, occupant load, fixture scheduleAsk the designer to confirm the basis where occupant loads changed.
Drainage and ventingPlans, isometrics, riser diagramsMatch pipe routes and connections between plans and diagrams.
Water supply and heatersRiser diagrams, equipment schedule, site utility plansTrace the supply from service to fixtures and heaters.
Structural penetrationsPlumbing routes, structural framing, slab detailsLocate pipes crossing beams, slabs, or shear walls without a detail.
Accessible fixturesEnlarged plans, accessibility details, fixture scheduleReconcile accessible fixture types and locations across documents.

Use the plumbing drawing checklist as the working log and the plumbing fixture specification guide for the fixture section.

Example: a lavatory moves without its piping

Hypothetical example. The enlarged toilet room plan moves a lavatory to the opposite wall, while the plumbing plan and isometric still show its waste and supply on the original wall.

The enlarged toilet room plan shows the lavatory on a different wall than the plumbing plan and isometric. Please confirm the fixture location and coordinate the piping.

The plumbing engineer updates the plan and isometric for the current layout. The conflict is a coordination question for the engineer.

Review plumbing code coordination with Groundbook

Upload the current drawings and specifications to Groundbook, and state the code edition, amendments, and review scope in your instructions. Add the applicable IPC from a copy you are licensed to use, where the license permits uploading it, and add the jurisdiction’s published amendments. See how Groundbook works with local and licensed codes.

Compare plumbing plans, isometrics, riser diagrams, and fixture schedules with current architectural and enlarged plans, the code summary, and structural framing. Flag fixtures and piping that disagree. Use the supplied IPC edition and amendments where applicable and cite both sources.

Groundbook links each potential finding to the sheets involved. Verify the fixture and revision before sending a question to the engineer.

Document review does not size pipes, calculate fixture units, or approve a plumbing design. Those remain with the plumbing engineer and the authority having jurisdiction.

Questions, answered

FAQs

Is the IPC used everywhere in the US?

No. Some jurisdictions adopt the Uniform Plumbing Code or a state plumbing code instead. Confirm the adopted code before reviewing.

Can Groundbook check plumbing drawings against the IPC?

It can compare supplied plumbing and architectural drawings with an IPC edition you are licensed to upload and flag potential conflicts for the engineer.

Bring your next set into focus

Set up a review or talk through your project with our team.

Run an IPC review on your plumbing set

Trusted by thousands of professionals