Guide · Code reference

Use the Seattle amendment that governs the project

A model-code title does not establish the entire Seattle requirement. Record the applicable city edition and amendments, then trace the relevant requirement into the permit documents.

Seattle publishes its adopted construction codes and city amendments. Establish the project’s permit basis, identify the applicable Seattle source and edition, and record the amended provision beside the drawing condition it governs.

Start with the city’s adopted sources

Seattle’s building-code page identifies the 2021 International Building Code with city amendments as its adopted building code. Record the official Seattle source alongside the project’s application history rather than relying on a national code title.

The Washington guide covers the state framework. The Seattle permit guide covers submission and review. This page supplies the missing amendment-to-drawing method.

Keep adopted text separate from a summary

A significant-changes summary helps locate a topic, but the applicable code text and adopted amendment establish the requirement. A proposal, public-review draft or older downloaded checklist may serve another purpose.

Record the source title, revision or effective date, applicable provision and retrieval date. If the project relies on an accepted interpretation, retain its actual reference and scope.

Follow one amendment into the set

Choose one applicable condition, such as a means-of-egress or existing-building question. Locate the city provision and its exceptions, then identify the code-analysis note and drawing evidence describing the condition.

If the cover sheet cites one basis while a dependent detail follows another, document the disagreement. The designer and authority resolve the applicable requirement; the review records the evidence to support that decision.

Local amendment review register

Local amendment review registerSwipe or scroll sideways to read all columns.
CheckSourcesReview question
JurisdictionProject address, authority and permit scopeIs Seattle SDCI the relevant reviewer for this work?
Permit basisApplication history and applicable code cycleWhich code edition applies to the actual application?
City sourceSeattle adopted code page and amended textIs this a current official requirement rather than a proposal or summary?
Related codesBuilding, existing building, mechanical and energy referencesWhich additional adopted codes apply to the reviewed scope?
Provision identityModel provision, city amendment and exceptionsWhat text governs this specific condition?
Drawing evidenceCode analysis, plan, detail and scheduleWhere does the package express the requirement?
Separate updatesCurrent agency rules and stormwater sourcesDoes this scope have a different update or effective date?
Open interpretationSource question and authority responseWho must resolve applicability or an unclear interpretation?

Watch scope-specific update cycles

Seattle’s stormwater page identifies a separate 2026 code and manual update effective July 1, 2026. A building-code cycle does not establish the stormwater basis automatically. Check the current source for each reviewed scope.

Use the drainage study checklist when the report and civil plans must follow those sources. Record application-specific transitional treatment with the authority where it is relevant.

Official sources and review use

Seattle SDCI building-code page links the adopted code and amendments. Source checked October 13, 2026.

Seattle SDCI stormwater-code page identifies its separate current update. Source checked October 13, 2026.

Include the applicable references and drawings in your code review. Potential findings require verification by the responsible professionals and authority; they do not grant a permit.

Questions, answered

FAQs

Can I use the unamended IBC for a Seattle review?

Include the applicable Seattle adopted code and amendments. The model publication alone may omit city requirements.

Does the newest publication govern an existing application?

Confirm the actual application basis and any applicable transition with the authority. Publication date alone does not determine applicability.

Are all Seattle code updates on one cycle?

Check the official source for each scope. Stormwater, for example, has a separate 2026 update identified by the city.

Check your Seattle set against its applicable references

Include the current project drawings and the applicable city sources. Groundbook flags potential conflicts with links to the source sheets.

Check your Seattle set against its applicable references

Trusted by hundreds of professionals