Seattle plan check guide

The Seattle Department of Construction and Inspections assigns each permit a review category, sends one correction letter per reviewer, and reviews corrections only as a complete, clouded set. This guide collects what SDCI publishes about review categories, plan formats, timelines, and the screening standards plans are checked against.

In Seattle, the Department of Construction and Inspections (SDCI) reviews construction permits under the 2021 Seattle Building Code, which is the 2021 IBC with Washington State and Seattle amendments. Simple interior work may qualify for a Subject-to-Field-Inspection permit; everything else gets plan review, and corrections are answered on a consolidated response plan set with every change clouded.

Seattle at a glance

The facts to confirm before you submit

Seattle plan check at a glanceSwipe or scroll sideways to read all columns.
QuestionWhat the official source saysSource
Who reviews building plans?SDCI’s zoning and technical reviewers, with the Seattle Fire Department, SDOT, Seattle City Light, and Seattle Public Utilities added when the scope requires them. Plumbing permits come from King County.SDCI Tip 100, Getting a Multifamily or Commercial Construction Permit from SDCI
Which code applies?The 2021 Seattle Building Code: the 2021 International Building Code with Washington State and Seattle amendments.SDCI - Building Code (Codes We Enforce)
When did it take effect?The 2021 Seattle construction codes took effect November 15, 2024.SDCI - 2021 Seattle Code Adoption: Timeline
How are plans submitted?Through the Seattle Services Portal, as one flattened, unlocked, bookmarked PDF up to 500 MB, on sheets at least 11 by 17 inches, with the same blank approval-stamp area on every sheet.SDCI Tip 106, General Standards for Plans and Drawings
How long does review take?SDCI assigns a review category with an initial review target: Full 1 to 2 weeks, Full+ 2 to 4 weeks, and Full-C 8 to 12 weeks. Other SDCI pages give different estimates.SDCI Guide to Construction Permit Initial Plan Review Categories
How do I respond to corrections?Wait for Corrections Required, answer every item on the Consolidated Summary Report Plan Set, cloud all changes, and upload it with a clean, complete plan set. SDCI targets 2 weeks to review corrected plans.SDCI - How to Respond to Review Comments

Sources reviewed September 12, 2026. Requirements change; confirm the current version with Seattle Department of Construction and Inspections.

Who reviews

Who comments on a Seattle permit set

SDCI coordinates its own zoning and technical reviews with other City departments. Each reviewer issues a separate digital correction letter, and questions about a correction go to that reviewer.

SDCI Land Use / Zoning review

Zoning and land use review is always required for multifamily and commercial plan review; SDCI typically must issue any associated Master Use Permit before the construction permit.

Source

SDCI technical reviews (building, drainage, energy, accessibility and others)

Building, fire code, energy, accessibility and drainage reviews are always required for multifamily/commercial projects; mechanical, geotechnical, shoring, conveyance, revegetation or FAS ADA review may be added.

Source

Seattle Fire Department (SFD)

Reviews building plans for Seattle Fire Code compliance and fire alarm and sprinkler designs; fire protection system plans are submitted electronically through SDCI, which collects SFD review fees.

Source

Seattle Department of Transportation (SDOT)

Right-of-way and street improvement requirements; when a Street Improvement Plan is required, a 60% SIP must be screened and accepted by SDOT 5 days before the SDCI intake appointment.

Source

Seattle City Light (SCL)

The Preliminary Assessment Report may flag high-voltage lines that require building clearance; Tip 122 covers clearances between structures and City Light overhead lines.

Source

Seattle Public Utilities (SPU)

Listed among the departments that review addition/alteration permits, for water, sewer and stormwater matters.

Source

King County

Plumbing and gas piping work needs separate permits and inspections from King County, not SDCI.

Source

Department of Neighborhoods

Historic preservation review where applicable.

Source

Review paths

Choose the right plan check path

Subject-to-Field-Inspection (STFI)

For simple scopes that meet Tip 316 criteria, such as non-structural commercial interior alterations up to 4,500 sq ft that leave exits unchanged. There is no code review before issuance; inspectors verify compliance in the field.

Source

Full (simple complexity)

Initial review category for simple projects, such as minor additions or alterations, needing up to about 1 hour of combined ordinance and structural review.

Source

Full+ (medium complexity)

Up to about 4 hours of ordinance/structural review (e.g. small business tenant improvements). Permits routed to Fire, SDOT, Parks or other outside departments are placed at least in this category.

Source

Full-C 'lite' and Full-C (complex)

Complex categories. 'Lite' covers e.g. larger tenant improvements and smaller townhouse developments; full complex covers new mixed-use, apartment and commercial buildings and substantial alterations.

Source

Phased permit (new buildings)

SDCI publishes a screening checklist for phased new-building permits. Shoring and excavation, structural, or architectural work can be separate phases; drawings outside the phase are included for reference only.

Source

Construction pre-submittal conference

Required for high-rise structures and buildings with an atrium, voluntary otherwise. SDCI and Seattle Fire experts answer code questions, and the resulting report is binding during plan review.

Source

Post-permit submittals

After a permit is issued, revisions, blanket permits, shop drawings and sprinkler drawings go in as post-permit submittals. Shop drawings are not accepted for finaled or expired permits.

Source

Targets for completing all initial reviews: Full 1-2 weeks, Full+ 2-4 weeks, Full-C 'lite' 4-8 weeks (internal target only), Full-C 8-12 weeks. Guide updated 2/1/24. (source) SDCI's stated target for reviewing corrected plans is 2 weeks. (source)

What SDCI asks for

What Seattle’s published screening standards and Tips ask for

SDCI does not publish a standard correction list. These items come from the screening standards and checklists staff use at intake, SDCI Tips, and the Seattle Building Code. The screening standards for new commercial projects and tenant improvements are dated 2016. Paraphrased from the department’s published documents, grouped by topic. The documents do not rank items by how often they are issued.

Seattle published plan check itemsSwipe or scroll sideways to read all columns.
TopicWhat the published document asks forCode citedSheets that usually changeWhere it appears
Code analysisThe building code analysis should give construction type, stories, occupancy groups, allowable-area or mixed-occupancy calculations, height calculations, and the sprinkler and fire alarm systems provided.Code analysis / cover sheetScreening Standards - NEW Commercial Projects, Building Code Analysis and Documentation
Occupant load and egress widthA means-of-egress plan (it may be on the floor plans) shows occupant load calculations, each room's exit door and swing, and corridor and stair widths.Egress/life-safety plan, floor plansScreening Standards - NEW Commercial Projects, Means of Egress/Exiting Plan
Number and separation of exitsEgress plans should show and dimension the separation between exits, and identify building exits, horizontal exits, refuge areas, and exit passageways or enclosures.Egress/life-safety planScreening Standards - NEW Commercial Projects, Means of Egress/Exiting Plan
Stairs, handrails, and guardsStair plans and sections show landing size, rise and run, headroom, handrail grip, extensions and returns, guard height and intermediate rail spacing, and protection under enclosed stairs.Stair plans, stair sections, detailsScreening Standards - NEW Commercial Projects, Stair Information and Stair Section
Fire-rated assembliesFloor plans need a wall-type legend with fire ratings. Sections show fire walls and horizontal fire barriers, and wall, floor and roof details identify the fire-resistive assemblies.Floor plans (wall types), building sections, wall sections, construction detailsScreening Standards - NEW Commercial Projects, Floor Plans, Building Sections, Typical Wall Section
Rated openings and penetrationsDoor and window schedules give fire ratings, U-values, types, sizes and special hardware. The egress plan states the ratings of corridors and stairs, including their doors.Door/window schedules, egress planScreening Standards - Commercial Tenant Improvement, Door/Window Schedule and Means of Egress/Exiting Plan
Accessible toilet roomsIdentify and fully dimension accessible restrooms (a separate enlarged plan is allowed if restrooms are new or altered), and show the latch-side distance from doors to adjacent walls.Floor plans, enlarged restroom plansScreening Standards - Commercial Tenant Improvement, Floor plan information
Path of travel in alterationsSDCI reviews against SBC Chapter 11 and ICC A117.1, and the Seattle Existing Building Code covers accessibility in alterations. ADA and Fair Housing compliance stay with the applicant.SBC Chapter 11; ICC A117.1; Seattle Existing Building CodeCode analysis, accessibility plans and detailsTip 119, Accessibility Laws We Enforce
Special inspectionWhere Chapter 17 special inspections apply, the registered design professional prepares a statement of special inspections, and the applicant submits it as a condition of permit issuance.2021 SBC 1704.2.3; 1704.3; 1704.3.1Structural general notes / special inspection schedule2021 Seattle Building Code Chapter 17, Sections 1704.2.3 and 1704.3
Deferred submittalsCurtain walls, post-tensioned systems, prefabricated stairs, plated wood trusses and storage racks 6 ft+ need post-permit shop drawings, stamped by the designer and reviewed by the engineer of record.SBC 106.5.2.2; SBC 202 (registered design professional)Shop drawings; structural general notes listing deferred itemsScreening Standards - Post-Permit Submittals (Index 16), Shop Drawing Requirements
Sheet coordinationPlot plan, floor plans and elevations must agree, every sheet must show the SDCI project address, and floor plans must mark section cuts that reference the building sections.Site/plot plan, floor plans, elevations, building sections, title blocksScreening Standards - NEW Commercial Projects, Screening Overview and 'Watch For' notes
Allowable height and areaElevations should dimension building height to match the code analysis, plus floor elevations, parapets, rooftop penthouses and equipment, and the elevation of the lowest fire department access.Exterior elevations, code analysisScreening Standards - NEW Commercial Projects, Elevation Views
Accessible route and entrancesThe accessibility analysis lists total and accessible parking counts, van stall locations, the path of travel to commercial spaces, and areas of evacuation assistance.Code analysis, site plan, floor plansScreening Standards - NEW Commercial Projects, Accessibility Analysis
Structural calculations and signaturesAll new multifamily and commercial buildings, and any project with a calculated value of $75,000 or more, need plans prepared by Washington-licensed professional designers.Cover sheet, title blocks/stamps, structural drawings and calculationsTip 100, Using Professional Designers and Licensed Engineers
Structural calculations and signaturesStructural notes give the design criteria: code edition, floor dead and live loads, roof dead and snow loads, wind exposure and speed, seismic parameters, and soil bearing capacity.Structural general notes, structural calculationsScreening Standards - NEW Commercial Projects, Structural Notes - Design Criteria
Geotechnical reportThe phased new-building checklist lists a copy of the geotechnical report as an additional submittal, alongside the Preliminary Assessment Report and structural calculations.Foundation plan, structural notes, shoring plansScreening & Submittal Checklist - Phased Projects (New Buildings), Additional Submittals
Energy complianceEnergy notes identify the code edition, heat source, compliance path and an envelope summary, and building sections show energy code information such as insulation.Energy notes / cover sheet, building and wall sectionsScreening Standards - NEW Commercial Projects, Architectural Notes (Energy Notes) and Building Sections
Energy complianceWhen Seattle Energy Code commissioning thresholds are exceeded, construction documents must require commissioning, and the permit submittal includes a commissioning narrative and the commissioning professional's roles.2021 SEC C408; C408.1.2.1; C408.1.3Mechanical and electrical general notesTip 419, SDCI's Commissioning Process and Submittal of Commissioning Documents
Green buildingTenant improvement applications include a waste diversion plan when the work area is over 750 sq ft, and a deconstruction and salvage assessment when demolition work exceeds 750 sq ft.Application forms; demolition planScreening Standards - Commercial Tenant Improvement, Screening Overview (Forms)
Plumbing fixture countChanging the number or position of plumbing fixtures in commercial, institutional or multifamily bathroom facilities (outside dwelling units) rules out STFI, so the project needs plan review.Floor plans, enlarged restroom plansTip 316, Projects that Do Not Qualify as a STFI
Fire sprinklers and alarmsArchitectural notes state sprinkler types and whether a fire alarm is required, and the building code analysis identifies the sprinkler system and fire alarm provided.General notes, code analysis, fire protection drawingsScreening Standards - NEW Commercial Projects, Architectural Notes and Building Code Analysis
Site plan informationEnhanced site plans add easements with recording numbers, pedestrian paths to entrances, 2-ft contours, right-of-way trees, sewer, storm and water mains, hydrants, poles, and on-site stormwater facilities.Site plan, civil/utility plansTip 103, Enhanced Site Plan (items 11-22)
Site plan informationFor projects under the tree protection code, site plans show Tier 1-4 trees (including off-site trees reaching the lot) with species and diameter, protection areas, fencing, and SDCI's protection detail.SMC 25.11; SMC 25.11.060.ASite plan, tree protection planTip 103, Basic Site Plan item 10
OtherSubmit the plan set as one PDF containing every sheet, with markups and objects flattened, no security locks, and bookmarks kept. Zip files are refused.Entire plan set (PDF assembly)Tip 106, PDF Formatting Requirements and document preparation list
OtherDrawings need a stated and graphic scale: minimum 1/4 in per foot for small commercial plans, or 1/8 in for large projects when unit/core plans use 1/4 in.Floor plans, exterior elevations, building sectionsTip 106, Plan Set Requirements

Respond and resubmit

Responding to SDCI correction letters

  • Wait until every assigned review is complete and the portal shows 'Corrections Required'. SDCI notifies the primary contact when the cycle ends. Source

  • Each reviewer issues a digital correction letter. Questions about a specific correction go to that reviewer by email. SDCI advises planning for more than one round of corrections. Source

  • Respond to every item: describe the change, or give a code citation or documentation if you decline it, and note any voluntary changes. Put all team members' responses on the Consolidated Summary Report Plan Set. Source

  • Cloud or circle all changes. New sheets may be added. Combine all sheets into a single PDF; photographs only as .jpg. Source

  • Through Make Changes, upload the Correction Response Plan Set (with embedded responses) together with a clean, complete updated Plan Set. Sets containing only the corrected sheets are not reviewed, and document names cannot be fixed later. Source

  • Resubmittals may be rejected for non-landscape orientation, wrong sheet size, or missing sheets or responses. Ignoring the instructions can delay the start of corrected review, and SDCI may charge a penalty fee. Source

  • When corrections significantly change development standards (e.g. structure location, stories/height/area, occupancy, structural design, egress), also submit the Permit Correction Response Letter. It does not replace the correction response plan set. Source

How to write a response letter the reviewer can verify

Official documents

SDCI lists and checklists to work from

Before you submit

Check the set before SDCI does

Upload the drawings with the Seattle Building Code and Seattle Energy Code PDFs that apply to the project. Groundbook compares the sheets with each other and with those references, and links each potential issue to its sources for your team to verify.

Questions, answered

Seattle plan check FAQs

How do I respond to an SDCI correction notice?

Wait until every review is done and the portal shows Corrections Required. Answer each item in the Consolidated Summary Report Plan Set, cloud all changes, then upload it with a complete clean Plan Set. SDCI targets 2 weeks to review corrected plans.

How long does SDCI's initial plan review take?

It depends on the review category SDCI assigns: Full (simple) targets 1-2 weeks, Full+ (medium) 2-4 weeks, and Full-C (complex) 8-12 weeks. Permits routed to Fire, SDOT or other departments are placed at least in Full+.

Can a commercial tenant improvement skip plan review with an STFI permit?

Possibly. Non-structural commercial interior alterations up to 4,500 sq ft can qualify if exits and path of travel are unchanged. A first tenant improvement, a change of use or occupancy, structural or exterior work, or moving plumbing fixtures all require plan review.

What PDF format does SDCI require for plans?

PDF only, up to 500 MB. Put all sheets in one flattened, unlocked file with bookmarks, on sheets at least 11x17 with 10-pt minimum text and consistent orientation, and leave the same blank approval-stamp area on every sheet.

Does Groundbook approve permits or replace SDCI plan check?

No. Groundbook surfaces potential conflicts and omissions in the drawings you upload, with links to the sources, for your team to verify before submitting. SDCI reviews the application and makes every approval decision.

Official source directory

Keep the reference trail

Washington plan review guide · All plan check corrections · Los Angeles plan check · San Francisco plan check · San Diego plan check · San Jose plan check · New York City plan check

Find the corrections before the plans examiner does

Upload the drawing set with the code and local references that govern it. Groundbook links each potential issue to its sources for your team to verify.