Plan check guide · San Diego

San Diego plan check guide

San Diego’s Development Services Department reviews each discipline separately and returns its comments as cycle issues, and resubmittal opens only when every discipline has finished. This guide collects what DSD publishes about review paths, plan formats, timelines, and submittal requirements.

In San Diego, the Development Services Department (DSD) reviews building plans through Rapid Review for minor scopes or Standard Review for everything else, with an optional paid Express Plan Check. Applications submitted on or after January 1, 2026 follow the 2025 California Building Standards Code with City amendments effective April 22, 2026; comments come back as cycle issues, and the full set is resubmitted to all disciplines at once.

San Diego at a glance

The facts to confirm before you submit

San Diego plan check at a glanceSwipe or scroll sideways to read all columns.
QuestionWhat the official source saysSource
Who reviews building plans?DSD’s Building Construction and Safety Division checks plans against City and State codes. DSD’s Land Development Review and Engineering divisions review zoning, grading, drainage, and right-of-way work.DSD - About Us
Which code applies?Applications submitted on or after January 1, 2026 follow the 2025 California Building Standards Code. City amendments took effect April 22, 2026, in Municipal Code Chapters 12 and 14.DSD Public Notice: Effective April 22, 2026 - Local Amendments to the 2025 California Building Standards Code (April 15, 2026)
How are plans submitted?Through DSD’s online permitting system, as PDFs up to 200 MB with one page size and orientation per set and a unique discipline-letter sheet number at the bottom right of each sheet.DSD - Requirements for Digital Plans & Documents
How long does review take?DSD publishes estimates, not guarantees. For standard building permits other than single dwellings, first review is 5 to 10 business days and rechecks 10 to 40, depending on project size.Information Bulletin 100 - Estimated Due Dates for Building Permits (May 2026)
How do I respond to cycle issues?Wait until every discipline finishes, address every issue, combine responses to several disciplines into one file, and upload the full plan set.DSD - Permit Processing Timeline
Is private plan check available?For 100 percent residential new construction of 1 to 10 units, when listed disciplines exceed 30 business days, applicants may use a qualified private plan checker under AB 253.DSD - AB 253: Residential Private Permitting Review Act

Sources reviewed September 12, 2026. Requirements change; confirm the current version with Development Services Department.

Who reviews

Who comments on a San Diego permit set

Each review discipline issues its own cycle issues. Land development, engineering, and fire items can come back alongside building code comments.

DSD Building Construction and Safety Division (plan review section)

Checks construction plans against adopted City and State codes across accessibility, electrical, fire protection systems, hazardous materials, life safety, mechanical, noise, plumbing, smoke control, structural and sustainability disciplines.

Source

DSD Land Development Review Division

Reviews ministerial and discretionary projects for Land Development Code, Community Plan and General Plan compliance; covers planning/zoning, landscaping, environmental review, mitigation monitoring and historic preservation.

Source

DSD Engineering Division

Ten sections reviewing engineering, transportation, drainage and grades, traffic safety, water and sewer, stormwater, geology, mapping, permitting and project management for ministerial and discretionary projects.

Source

San Diego Fire-Rescue Department (SDFD)

Handles site safety inspections where projects need fire access roads, hydrants or standpipe fire department connections, plus ERCES, technical services (tank) permits and alarm permits; may refer applicants to DSD for building permits.

Source

Historical resources review (via Information Bulletins 580/581)

Extra submittal documents apply when a site has a structure 45+ years old that is not designated, or is a designated historical site or within a historical district.

Source

Outside agencies at permit issuance

Before issuance, applicants provide proof of water/sewer and school fee payments; non-residential and larger residential projects also need an approved regional hazardous materials questionnaire (HM-9171).

Source

Review paths

Choose the right plan check path

Rapid Review (formerly Over-the-Counter)

For minor scopes; staff decide eligibility at submittal and place projects automatically. Examples include small single-dwelling additions, interior remodels, accessory structures, non-lab tenant improvements up to 10,000 sq ft and two floors, and fire alarm/sprinkler work.

Source

Standard Review

Default submitted review for projects not eligible for Rapid Review; each discipline performs a first review and rechecks, with estimated due dates set by project size category (Short, Medium, Long, Complex).

Source

Express Plan Check

Optional paid service, requested at initial submittal, advertised as 40-50% faster than standard. Admin fee plus 1.5 times plan check fee; covers initial review and two rechecks. Not for Rapid Review-eligible or combination permits.

Source

Affordable, In-Fill Housing and Sustainable Buildings Expedite Program

Expedited processing of ministerial and discretionary permits for eligible affordable, in-fill housing and sustainable development projects.

Source

Submitted Completeness Review (complex projects)

Complex projects (e.g., hotels over 5 stories, 100+ unit multifamily, mixed use over 3 stories, shopping malls) get extra completeness screening, typically five working days, before full submittal is accepted.

Source

Professional Certification Program (office tenant improvements)

Allows same-day building permits for qualifying office tenant improvements up to 20,000 square feet, per the DSD building permit page (details in Information Bulletin 150).

Source

AB 253 private plan check

For 100% residential, 1-10 unit new-construction ministerial permits with no occupied floor over 40 ft: if listed disciplines exceed 30 business days, applicants may use a qualified private plan checker; DSD reviews that work within 10 business days.

Source

Standard building permits (other than single dwelling/duplex/townhome), estimated first review / recheck: Short 5/10, Medium 6/20, Long 10/40 business days; Complex 20/60 (Structural disciplines only). Estimates, not guaranteed. (source) Single dwelling unit, duplex and townhome permits, estimated first review / recheck: Short 5/8, Medium 6/10, Long 6/15 business days. (source) Rapid Review projects receive estimated due dates of 6 business days for first review and 2 business days for rechecks. (source) Deferred submittals must be uploaded at least 30 business days before the item is installed. (source)

What DSD asks for

What San Diego’s published submittal checklists and bulletins ask for

San Diego does not publish a common-corrections list. These items come from the Project Submittal Manual’s minimum submittal checklist, which staff use to screen plans, and from DSD bulletins. The manual is dated March 2023, before the 2025 code cycle. Paraphrased from the department’s published documents, grouped by topic. The documents do not rank items by how often they are issued.

San Diego published plan check itemsSwipe or scroll sideways to read all columns.
TopicWhat the published document asks forCode citedSheets that usually changeWhere it appears
Code analysisThe first sheet needs a data table giving construction type and occupancy classifications (existing and proposed), number of stories, and the building code edition used for design.Title/cover sheetProject Submittal Manual Section 2, Minimum Submittal Requirements Checklist, item 3.1 (Title Sheet)
Occupant load and egress widthLabel every space with its use and occupant load, derived from CBC occupant load factors and the City's technical bulletin on occupant load.Technical Bulletin BLDG-10-1Egress plans, floor plansProject Submittal Manual Section 2, checklist item 5.7.1 (Space and Occupant Loads)
Travel distance and common pathProvide an egress plan for every floor tracing exit travel from the most remote occupied point to a public way, showing travel distance and common path of travel.Egress plansProject Submittal Manual Section 2, checklist item 5.7.3 (Means of Egress Floor Plans)
Number and separation of exitsEgress plans must identify exit access, exits and exit discharge, and state exits required versus provided; rated corridors, horizontal exits and stair enclosures must be labeled.Egress plans, floor plansProject Submittal Manual Section 2, checklist items 5.7.2 and 5.7.3
Stairs, handrails, and guardsInclude dimensioned details of all stairs, handrails and guardrails, and show each stairway's location and travel direction on floor plans.Architectural details, floor plans, building sectionsProject Submittal Manual Section 2, checklist items 5.6.1 and 5.1.8
Fire-rated assembliesWhere fire-resistive construction is proposed, show rated shafts, fire walls, fire barriers, fire partitions, rated corridors and horizontal exits on the floor plans.Floor plans, life safety plansProject Submittal Manual Section 2, checklist item 5.1.10 (Fire Resistive Construction)
Rated openings and penetrationsDetail rated walls, ceilings, floors, roofs, shafts and penetrations, citing each assembly's listing number (such as UL or ICC); door schedules should list fire ratings.Architectural details, door and window schedulesProject Submittal Manual Section 2, checklist items 5.6.2 and 5.5.1
Fire separation distanceThe site plan must dimension fire separation distance between adjoining buildings and from property lines to every building or structure.Site planProject Submittal Manual Section 2, checklist item 4.1.10 (Fire Separation Distances)
Accessible toilet roomsProvide fully dimensioned enlarged plans and interior elevations of kitchens, powder rooms and all bathrooms demonstrating accessibility compliance.CBC Chapter 11A and 11BEnlarged plans, interior elevationsProject Submittal Manual Section 2, checklist item 5.1.7 (Accessibility - Enlarged Floor Plans and Interior Elevations)
Path of travel in alterationsInside the building, floor plans must trace the accessible route to all rooms and to path-of-travel elements such as toilet rooms, drinking fountains and public telephones.CBC Chapter 11A and/or 11BFloor plans, accessibility plansProject Submittal Manual Section 2, checklist Accessibility Plans, Path of Travel item (numbered 4.2.5 in the source)
Special inspectionStructural sheets must include a statement of special inspections listing work that needs special inspection and testing, with related notes.CBC Chapter 17Structural general notesProject Submittal Manual Section 2, checklist item 6.1.5; Technical Bulletin BLDG-17-2
Deferred submittalsThe architect or engineer of record must list deferred items on the construction documents; only components in the bulletin's Table 1 are deferrable without building official approval.Title/cover sheetInformation Bulletin 188, Deferred Submittals (Table 1 and listing requirement)
Deferred submittalsIf prefabricated trusses are deferred, permit plans still need a truss layout, shear transfer details compatible with the trusses, and a summary of truss design loads.Roof/floor framing plans, structural detailsProject Submittal Manual Section 2, checklist items 12.0-12.3 (Truss Plans and Calculations)
Sheet coordinationEvery detail used in structural calculations must appear on the plans and be cross-referenced to roof, floor or foundation plans; architectural grid lines should match structural grid lines.Structural plans and details, architectural floor plansProject Submittal Manual Section 2, checklist items 11.3 and 5.1.11
Allowable height and areaRecommended floor area analysis per the CBC: tabulate square footage by occupancy against the allowable area for that occupancy and construction type.Title sheet or code analysis sheetProject Submittal Manual Section 2, checklist item 3.8 (Floor Area Analysis Calculation)
Allowable height and areaIf open yards are used to increase allowable area (frontage increase), show the extent and depth of those yards on the site plan.Site planProject Submittal Manual Section 2, checklist item 4.1.18 (Allowable Area Frontage Increase)
Accessible route and entrancesShow at least one accessible route from accessible parking, loading zones, public sidewalks and transit stops to the entrance served, and show exterior entrances meeting accessibility requirements.CBC Chapter 11A and/or 11BSite plan, accessibility plansProject Submittal Manual Section 2, checklist items 4.2.1, 4.2.3 and 4.2.5 (Accessibility Plans)
Structural calculations and signaturesPlans need a California architect or engineer in responsible charge. Plans may be unsigned at submittal but signed before issuance; calculations must be stamped and signed at submittal.Business and Professions Code 5535-5538Title sheet, all sealed sheets, calculation coverProject Submittal Manual Section 2, checklist items 3.5 (Responsible Charge) and 11.1
Geotechnical reportProvide a site-specific, stamped geotechnical report when the municipal code requires it; reports over three years old need an update letter, and foundations must follow its recommendations.SDMC 145.1803, Table 145.1803Foundation plans, structural notesProject Submittal Manual Section 2, checklist items 13.0-13.3 and 6.2.1
Energy complianceFor non-residential, high-rise residential and hotel projects, envelope, mechanical and indoor/outdoor lighting Title 24 forms must appear on the plans, signed by a licensed design professional.NRCC compliance forms (California Energy Code)Title 24 (T) sheets; window schedule U-factor/SHGCProject Submittal Manual Section 2, checklist items 10.0-10.1 and 5.5.1
Green buildingInclude notes and details demonstrating compliance with the California Green Building Standards Code.California Green Building Standards CodeGeneral notes / CALGreen sheetProject Submittal Manual Section 2, checklist item 3.10 (Cal Green Standards)
Plumbing fixture countShow existing, proposed and relocated plumbing fixtures (and, for non-residential work, fixtures being removed); a Water Meter Data Card must list new and existing fixtures.Form DS-16Floor plans, plumbing plansProject Submittal Manual Section 2, checklist items 5.1.5 and 1.2
Fire sprinklers and alarmsFire alarm and sprinkler plans may be deferred, yet life safety review of building plans proceeds; alarm devices drawn on electrical sheets are not reviewed and need a separate package.Information Bulletins 137 and 139Fire protection (F) sheets, electrical plansProject Submittal Manual Section 2, checklist items 8.0, 15.0 and 16.0
Site plan informationThe site plan must show dimensioned property lines, setbacks, easements by type, right-of-way work, and existing and proposed structures with distances; surveyed lines and easements need a land surveyor's seal.Site planProject Submittal Manual Section 2, checklist items 4.1.1-4.1.7; Information Bulletin 122
OtherEach sheet needs a unique discipline-letter number at bottom right, in Arial or Helvetica with no lowercase or special characters; one page size and orientation throughout.All sheets (title block)Requirements for Digital Plans & Documents (Sheet Numbering, Page Size, Page Orientation)

Respond and resubmit

Responding to DSD cycle issues

  • Each discipline sends its cycle issues report when it finishes, but resubmittal opens only after all reviews finish. Applicants must address every cycle issue first; resubmittals go to all disciplines together, never discipline by discipline. Source

  • Responses or corrected plans cannot be uploaded until every review discipline completes its cycle; when several disciplines request responses, combine them into a single file of the requested type. Source

  • Resubmit the full plan set, not partial sets. Mark deleted sheets with a strike-through and a DELETED SHEET label; give inserted or reordered sheets new unique numbers, checked with e-PlanSNAPP. Source

  • Checklist items marked Recommended are not needed for intake but may become plan check corrections in later cycles; DSD suggests providing them to reduce review cycles. Source

  • A second opinion from a supervisor may be requested anytime; for ministerial projects, Project Issue Resolution with management is available after third-cycle review comments are issued. Source

How to write a response letter the reviewer can verify

Official documents

DSD lists and checklists to work from

Before you submit

Check the set before DSD does

Upload the drawings with the California code and San Diego amendment PDFs that apply to the project. Groundbook compares the sheets with each other and with those references, and links each potential issue to its sources for your team to verify.

Questions, answered

San Diego plan check FAQs

Can I resubmit corrections to one discipline as soon as that reviewer finishes?

No. DSD will not accept responses or corrected plans until every review discipline has finished its cycle. Resubmittals go to all disciplines at once, and responses to several disciplines must be combined into a single file.

Do I upload only the revised sheets when I resubmit to San Diego DSD?

No. DSD requires a full plan set and rejects partial submittals. Strike through deleted sheets and label them DELETED SHEET; give inserted or reordered sheets new unique numbers, and check numbering with e-PlanSNAPP.

How long is a San Diego building plan check?

IB-100 gives estimates, not guarantees. For standard non-single-dwelling permits, first review runs 5-10 business days and rechecks 10-40, by size category. Complex structural reviews run 20 days, with 60-day rechecks. Rapid Review is 6 days, with 2-day rechecks.

Which code edition applies to a new San Diego submittal?

Applications submitted on or after January 1, 2026 follow the 2025 California Building Standards Code. San Diego's local amendments took effect April 22, 2026, and are codified in Chapters 12 and 14 of the Municipal Code.

Does Groundbook approve permits or replace DSD plan check?

No. Groundbook surfaces potential conflicts and omissions in the drawings you upload, with links to the sources, for your team to verify before submitting. DSD reviews the application and makes every approval decision.

Official source directory

Keep the reference trail

California plan review guide · All plan check corrections · California AB 253 private plan review · Los Angeles plan check · San Francisco plan check · San Jose plan check · Seattle plan check · New York City plan check

Find the corrections before the plans examiner does

Upload the drawing set with the code and local references that govern it. Groundbook links each potential issue to its sources for your team to verify.