Plan check correction · General

Plan check correction: sheets that disagree with each other

Some corrections are not about the code at all. The reviewer found two sheets that disagree, or a detail callout that points to nothing, and cannot tell which one is the design.

The comment asks you to make the drawings consistent: detail and section callouts that point to existing details, dimensions and elevations that match between plans and sections, schedules that match the tags on the plans, and consultant sheets that match the architectural design. Clear it by fixing the specific conflict and checking every other sheet that shows the same element.

Read the comment

What the plans examiner is asking for

References that resolve

Every detail, section, and elevation callout points to a detail that exists, on the sheet it names.

One value per element

Dimensions, heights, and ratings for the same element agree across plans, sections, elevations, and details.

Schedules that match tags

Door, window, and equipment tags on the plans match rows in the schedules, with the same sizes and ratings.

Consultants in step

Structural, mechanical, electrical, and plumbing sheets reflect the current architectural layout.

Published correction lists

How city lists word this correction

Published lists ask applicants to coordinate the drawings, resolve conflicting information, or reference details correctly. Paraphrased from each department’s own published list; the lists do not rank items by how often they are issued.

Sheet coordination: published correction list items by citySwipe or scroll sideways to read all columns.
CityWhat the published list asks forCode citedWhere it appears
Los AngelesDelete any plans, details or notes that do not apply to this project.—Commercial Plan Check Correction Sheets (2026 LABC), Part I, C. Administration, item 11
San FranciscoList the total sheet count on the drawing index and make sure it matches the number of pages in the submitted PDF.—EPR Applicant Procedure, Section B - Sheet Count and Drawing Index
San FranciscoLabel every level as either a story or a basement on plans, elevations and sections instead of loose terms like ground floor or lower level.—Residential Pre-Plan Check checklist - Architectural floor plans, elevations, sections, and structural sections items
San DiegoEvery detail used in structural calculations must appear on the plans and be cross-referenced to roof, floor or foundation plans; architectural grid lines should match structural grid lines.—Project Submittal Manual Section 2, checklist items 11.3 and 5.1.11
SeattlePlot plan, floor plans and elevations must agree, every sheet must show the SDCI project address, and floor plans must mark section cuts that reference the building sections.—Screening Standards - NEW Commercial Projects, Screening Overview and 'Watch For' notes
New York CityEach drawing set needs a discipline-sorted index whose sheet numbers and titles match the sheets, plus legends for materials, symbols and abbreviations.—Drawing Standards for Plan/Work Applications – Drawing Set Standards
DenverEvery drawing must use a common graphic or engineering/architectural scale, include a north arrow, provide a graphic legend or key for all line types, symbols and abbreviations used, and include callouts/tags for all physical elements and dimensions shown.DCBC 133.2Permitting Checklist for New Homes and Additions, Requirements for All Project Submittals table, Plan Graphics row
PortlandDrawings must be legible and archivable: minimum 3/32-inch text, drawn to scale and fully dimensioned, black lines/lettering on a white background (no color), high enough contrast to scan, and correctly oriented (no mirrored plans).ORSC 106.1.1Life Safety and Structural Review Completeness Checklist for Residential Additions and Alterations, General Information section
PhoenixAll engineers and architects involved in the design must seal their related sheets and details per the state Board of Technical Registration rules, and a code section cited only to justify a correction should not be copied onto the plan unless requested as a plan note.—Residential Plan Submittal Checklist, items 11 and 14
BostonPlans must be organized into individual sets bearing the correct project address rather than combined across unrelated projects.—Building Permit Application Checklist, 'All Applications' section
AustinProvide a key floor plan locating each suite and altered area within the whole building, with separate existing and proposed floor plans for every altered area of an existing building.—Architectural Plan Review Commercial Checklist, Section A item 9
ChicagoEvery sheet other than the cover needs a uniform title block aligned to the bottom or right edge, listing the same project address used on the permit application and a revision history whose entries are each clouded and keyed to a dated change; the set also needs a sheet index up front.—E-Plan Create Drawings checklist, Front Matter and Title Block sections

Sources reviewed September 12, 2026. Code sections are as cited on each list and follow that city’s adopted code. Confirm the current list and edition with the department.

Revise the set

What changes on the drawings, and what else to re-check

The comment names one conflict, but conflicts come in families. Search for the same element everywhere it appears.

Sheet coordination: sheets to revise and dependent sheetsSwipe or scroll sideways to read all columns.
ChangeSheets to reviseAlso re-check
Broken callout fixedThe sheet with the callout; the detail sheetOther callouts to the same detail, sheet index
Dimension reconciledPlan and sectionStructural grid dimensions, enlarged plans, civil site dimensions
Schedule row correctedDoor, window, or equipment scheduleTags on plans, hardware sets, electrical and mechanical connections
Consultant sheet updatedStructural or MEP planOpenings, equipment locations, ceiling heights on architectural sheets

Close the comment

A response the reviewer can verify

An illustrative example written for this guide, not a real project or a city’s wording. Name the sheet, the detail, and the change, so the recheck does not start with a search.

Comment

Wall section 3/A5.01 referenced on A2.01 does not exist. Floor-to-floor height on the building section does not match the structural drawings.

Response

Revised as requested. Callout on A2.01 corrected to wall section 3/A5.02. Floor-to-floor height reconciled to 14 feet 0 inches on building sections A4.10 and A4.11 and structural sections S3.01 and S3.02. All other callouts to A5.01 were checked and are correct.

How to write the whole response letter

Before you submit

Catch it before the plans examiner does

  1. Check every callout

    Confirm each detail and section reference resolves before the set leaves the office.

  2. Compare the repeats

    Where an element appears on more than one sheet, compare the values rather than assuming they match.

  3. Re-check after changes

    After a revision, find the other sheets showing the same element and update them in the same issue.

Groundbook compares the drawings, schedules, and specifications with the adopted code and local amendments, and links each potential issue to the sheets and sections behind it. We read the amendments governments publish online and use licensed model codes only where a license allows it. Your team verifies each finding; the jurisdiction makes every approval decision. See the pre-permit review and drawing-to-code review.

Questions, answered

Sheet coordination: questions

Why do reviewers care about inconsistent drawings?

The permit is issued for the drawings, and the builder builds from them. When two sheets disagree, the reviewer cannot confirm which condition meets the code, and the contractor cannot tell which one to build.

Is a missing detail reference a code violation?

Not by itself, but construction documents must show the work clearly and in enough detail for review under IBC Section 107.2.1. Conflicting information fails that test.

How do I find inconsistencies before submitting?

Check references, compare repeated values, and reconcile consultant sheets with the architectural set. AI review can do a first pass across the whole set and point to the sheets that disagree.

Find the corrections before the plans examiner does