| Code analysis | New construction over 35,000 cubic feet must include a Building Code Narrative Report along with a Zoning Code Summary. | — | Cover sheet / code analysis narrative | Building Permit Application Checklist, 'Under/Over 35,000 ft3' new-construction section |
| Occupant load and egress width | Egress plans for places of assembly must show occupant load calculated for each floor and space by a Massachusetts-registered architect or engineer, along with full exit routes and their effective widths. | — | Egress/life-safety plan | Place of Assembly Permit page, egress plan requirements |
| Number and separation of exits | Each exit shown on a place-of-assembly egress plan must be uniquely labeled, with the main exit clearly identified and documentation of its adequate capacity. | — | Egress/life-safety plan | Place of Assembly Permit page, egress plan requirements |
| Path of travel in alterations | Where full compliance with the state's accessibility regulations is impracticable, an applicant may seek a variance from the Architectural Access Board, processed through the City's Disabilities Commission rather than through ISD plan review itself. | 521 CMR 4.1 | Accessibility narrative / variance application (not a drawing sheet) | Disabilities Commission - Submitting an Architectural Access Board Variance page |
| Special inspection | New buildings over 35,000 cubic feet require a Construction Control Documents Affidavit signed by every Massachusetts-registered design professional involved, consistent with the state code's construction-control provisions. | 780 CMR 107 | Structural/architectural general notes; affidavit filed with application | Building Permit Application Checklist, 'Over 35,000 ft3' new-construction section |
| Special inspection | Fast Track applicants must submit a signed affidavit from the approved independent architect or engineer confirming periodic site oversight of the work during construction. | — | Affidavit filed with application; general notes | Fast Track Permit Program page, submission requirements |
| Deferred submittals | Fire alarm and special-suppression system plans (Tier II) are a separate submittal reviewed by the Fire Department, distinct from the Tier I architectural plans ISD uses to issue the building permit, and must reference acceptance by the Tier I design professional of record. | — | Fire alarm/suppression plan cover sheet | Boston Fire Department ePlan Submittal Requirements, General Content Requirements item 1 |
| Sheet coordination | Plans must be organized into individual sets bearing the correct project address rather than combined across unrelated projects. | — | Cover sheet / plan set organization | Building Permit Application Checklist, 'All Applications' section |
| Structural calculations and signatures | For all application types, plans must be stamped and signed by a Massachusetts-registered design professional and drawn to scale as required. | — | Title block / all drawing sheets | Building Permit Application Checklist, 'All Applications' section |
| Geotechnical report | New buildings over 35,000 cubic feet require a geotechnical report with foundation recommendations, prepared and stamped by a Massachusetts-registered professional engineer. | — | Foundation plan / structural general notes | Building Permit Application Checklist, 'Over 35,000 ft3' new-construction section |
| Energy compliance | Most permit types (new construction, additions, ADUs, Fast Track) must include a Stretch Energy Code Compliance Letter, or a 2009 IECC energy-conservation submittal where the stretch code does not apply. | — | Energy compliance forms / cover sheet | Building Permit Application Checklist, multiple sections |
| Green building | Qualifying large new-construction projects (generally 15+ residential units, 20,000+ sq ft, or 50,000+ sq ft additions filed after July 1, 2025) must demonstrate compliance with Net Zero Carbon Zoning during Article 80 Development Review, including a full lifecycle embodied-carbon assessment for Large Projects. | — | Article 80 submission materials; energy/carbon compliance narrative | Mayor Michelle Wu Announces Passage of Groundbreaking Net Zero Carbon Zoning (press release) |
| Plumbing fixture count | Place-of-assembly egress plan submittals must include plumbing fixture calculations alongside occupant load and exit information. | — | Egress plan / restroom plans | Place of Assembly Permit page, egress plan requirements |
| Fire sprinklers and alarms | New buildings over 35,000 cubic feet, ADUs with more than two units, and Fast Track projects must include a Fire Alarm/Fire Sprinkler Narrative and a hydraulic calculation report. | — | Fire protection/fire alarm construction documents | Building Permit Application Checklist, multiple sections |
| Fire sprinklers and alarms | Fire alarm and suppression system (Tier II) plans need a stamp accepting the plans from the fire protection engineer or architect of record responsible for the Tier I plans, a riser diagram for each system, and an equipment legend on every sheet. | — | Fire alarm/suppression plans, riser diagrams | Boston Fire Department ePlan Submittal Requirements, General Content Requirements |
| Site plan information | A certified plot plan must be a stamped, scaled drawing by a state-registered engineer or land surveyor showing the lot's boundary lines, total square footage, and all existing structures on the land such as decks, pools, garages, fences, and driveways. | — | Certified plot plan | Certified Plot Plan (instructions), 'What is a Certified Plot Plan?' |
| Site plan information | Site plans submitted to BWSC must show stormwater retention sized to infiltrate the first inch of rainfall times the site's impervious area, along with pre- and post-construction drainage calculations. | — | Site/utility plan, drainage calculations | BWSC Site Plan Review Checklist, Section D (Drain) |
| Site plan information | Projects in the Flood Hazard District must show a clearly defined vertical datum, elevations of utilities located below the Design Flood Elevation, and an Initial Construction Control Document signed by a registered design professional. | — | Site plan; utility/foundation plan | Permitting in the Flood Hazard District page |