Plan check correction · General

Plan check correction: provide a complete code analysis

The code analysis is the first thing a plans examiner reads, and every later comment is measured against it. When it is missing a value, or disagrees with the plans, the correction letter usually grows.

The comment asks for the facts the whole review depends on: occupancy classification, construction type, building height and area with the allowable values, occupant load, sprinkler and alarm basis, and the code editions used. Clear it by completing the analysis on the cover or code sheet and making sure every value matches the floor plans, egress plans, and wall types.

Read the comment

What the plans examiner is asking for

The code basis

The code editions and local amendments the design follows, so the reviewer knows which tables apply.

Occupancy and construction type

Each occupancy classification, how mixed occupancies are handled (separated or non-separated), and the construction type from IBC Table 601.

Height, stories, and area

Actual building height, number of stories, and floor areas beside the allowable values from IBC Chapter 5, with any frontage or sprinkler increases shown.

Occupant load and fire protection

Occupant load by area and use, and whether the building has automatic sprinklers and a fire alarm system, because many egress and rating allowances depend on both.

Published correction lists

How city lists word this correction

Departments ask for the same summary under different names: code analysis, code summary, project data, or building data. Paraphrased from each department’s own published list; the lists do not rank items by how often they are issued.

Code analysis: published correction list items by citySwipe or scroll sideways to read all columns.
CityWhat the published list asks forCode citedWhere it appears
Los AngelesShow project data on the title sheet: height, stories, basements, floor area, fire district, uses, lot size, construction type, occupancy groups, scope, sprinkler and alarm status, allowable-area analysis.CBC 903.2, T506.2; CBC 907; CBC 506Commercial Plan Check Correction Sheets (2026 LABC), Part I General Requirements, C. Administration, item 6
San FranciscoCover sheet should list applicable codes and existing, changed and proposed occupancy, construction type, stories, basements, floor area and dwelling unit count.Residential Pre-Plan Check checklist - Plans: Cover Sheet
San DiegoThe first sheet needs a data table giving construction type and occupancy classifications (existing and proposed), number of stories, and the building code edition used for design.Project Submittal Manual Section 2, Minimum Submittal Requirements Checklist, item 3.1 (Title Sheet)
San JoseDrawings must carry project data such as construction type, occupancy classification and square footage.BDN 01 Information Required on the Drawings, Required Information list
SeattleThe building code analysis should give construction type, stories, occupancy groups, allowable-area or mixed-occupancy calculations, height calculations, and the sprinkler and fire alarm systems provided.Screening Standards - NEW Commercial Projects, Building Code Analysis and Documentation
New York CityCode classification, energy analysis, inspection lists, lot diagram and zoning analysis go on the title sheet or the sheets right after it.Drawing Standards for Plan/Work Applications – Drawing set hierarchy
New York CityProvide a full zoning analysis of use, bulk, parking and required street trees, with floor area tabulated per floor and box diagrams.Plan Examination Guidelines – Section 2.2 Zoning

Sources reviewed September 12, 2026. Code sections are as cited on each list and follow that city’s adopted code. Confirm the current list and edition with the department.

Revise the set

What changes on the drawings, and what else to re-check

The analysis is cheap to fix and expensive to leave inconsistent. A value changed here often changes ratings and egress elsewhere.

Code analysis: sheets to revise and dependent sheetsSwipe or scroll sideways to read all columns.
ChangeSheets to reviseAlso re-check
Occupancy or use correctedCode analysis; occupancy planOccupant load, plumbing fixture count, egress widths, rated separations between uses
Construction type changedCode analysis; wall and floor type legendStructural element ratings, exterior wall ratings, listed assembly details
Area or height recalculatedCode analysis; area plan with calculationsAllowable area increases, fire wall or separation locations, sprinkler basis
Sprinkler basis statedCode analysis; fire protection notesTravel distances, corridor ratings, deferred sprinkler submittal on the cover sheet

Close the comment

A response the reviewer can verify

An illustrative example written for this guide, not a real project or a city’s wording. Name the sheet, the detail, and the change, so the recheck does not start with a search.

Comment

Provide a complete code analysis on the title sheet, including occupancy, type of construction, allowable area, and occupant load.

Response

Revised as requested. Code analysis added to G0.02: occupancies B and A-3 (non-separated), Type V-A, sprinklered throughout. One story; actual area 18,400 sf against 46,000 sf allowable. Occupant load of 412 is tabulated by room on G0.03 and matches the egress plan.

How to write the whole response letter

Before you submit

Catch it before the plans examiner does

  1. Fill every line

    Write down occupancy, construction type, height, area, occupant load, and sprinkler basis, even when a value seems obvious.

  2. Trace each value to a sheet

    Match areas to the area plan, occupancy to the room names on the floor plans, and construction type to the wall and floor assemblies.

  3. Carry changes forward

    When a value changes during design, update the egress plan, rated assemblies, and fixture count in the same issue.

Groundbook compares the drawings, schedules, and specifications with the code and local references you upload, and links each potential issue to the sheets and sections behind it. Your team verifies each finding; the jurisdiction makes every approval decision. See the pre-permit review and drawing-to-code review.

Questions, answered

Code analysis: questions

Where should the code analysis go on the drawings?

Usually on the cover sheet or a dedicated code sheet at the front of the set. Some departments name the sheet in their submittal checklist; follow the department’s instructions when they do.

Does a small tenant improvement need a full code analysis?

Most departments still expect the occupancy, construction type, occupant load of the space, and sprinkler status, because egress and accessibility comments depend on them. Check the department’s checklist for the permit type.

Why do reviewers keep asking about the code analysis after I added one?

Usually because a value does not match the plans: an area that differs from the area plan, or an occupancy that does not match the room uses. Reconcile the analysis with the sheets before resubmitting.