We’re at NCSEA in San Francisco, Oct 28–29 · Booth 110NCSEA · Booth 110 · Oct 28–29

Construction documents · Washington

AI plan review in Washington

Washington’s reference package should include the State Building Code Council amendments and the separately confirmed electrical requirements. Record effective dates by discipline, then connect those references to the local permit submission.

Your codes, connected to your drawings

Codes governments publish, and licensed codes you upload

We read the state and local codes and amendments that governments publish online, the way a human reviewer does. Our AI opens it in a web browser, goes to the section or table, and cites it in the finding with a link to the source. The model codes most states adopt, such as the International Building Code, are licensed; we use their text only where a license allows it, and you can upload a copy you’re licensed to use. We reference the section. We never copy or distribute code text.

  1. Confirm the codes

    We detect the codes your drawings cite in the code analysis, cover sheet, and general notes. Add or remove codes, and note the edition, local amendments, and project requirements.

  2. Choose each file’s role

    Mark the drawings you want reviewed as Check this file. If you upload a code, such as a standard you’re licensed to use or an unpublished amendment, set it to Code and Use as reference.

  3. Review the findings

    Follow the linked drawing and code section, check applicability, and have the responsible professional verify the issue.

How to use local code references
Groundbook project files with four ASME and National Board code PDFs set to Code and Use as reference, and a mechanical drawing set marked Check this file.
Purchased ASME and National Board code PDFs shown as an example. Upload a code you’re licensed to use, where your license allows it, and save it to reuse on future projects.Start for free

State and local references

Code references for Washington

Examples of codes that can apply in Washington. Confirm the adopted edition, effective date, and project scope with the reviewing authority.

Code names link to official agency or publisher resources. Reviewed September 9, 2026. We detect the codes your drawings cite, and you can add or remove codes.

Washington reference guide

Establish who reviews what

Read the state amendments

The State Building Code Council publishes building-code amendment documents. Use the applicable Washington changes with the model reference rather than reviewing against an unamended model book.

Washington SBCC: building-code amendments

Check electrical scope separately

SBCC’s code directory directs National Electrical Code adoption and amendment questions to Labor & Industries. Confirm that discipline’s code basis and the responsible electrical authority alongside the local building review.

Washington SBCC: codes and guidelines

Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.

Prepare a useful review

What to bring for Washington

Use this preparation list for Groundbook alongside the official permit checklist. Name the codes that apply.

SBCC code basis

Name the applicable building and energy codes, Washington amendments, and effective dates, and supply any project transition determination.

Electrical and local requirements

Name the confirmed electrical codes and authority information, and bring the local building department’s checklist and conditions.

Envelope/system interfaces

Include energy documentation, mechanical and electrical schedules, enclosure details, structural penetrations, and architectural plans. Check cross-discipline assumptions against the selected references.

A current drawing register

Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.

Use the drawing-register template

Before you start

Washington plan review FAQs

Does the Washington SBCC directory settle every electrical-code question?

SBCC directs electrical-code adoption and amendment questions to Labor & Industries. Confirm the applicable electrical requirements and reviewing authority separately from the building-code package.

Which documents should I supply for a Washington AI plan review?

Supply the current drawing set and schedules, relevant specifications and reports, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. We read the state and local amendments that governments publish online. The base model codes, such as the International Building Code, are licensed; we use their text only where a license allows it. You can upload a code you’re licensed to use, or an amendment that isn’t online.

Does Groundbook approve a permit or certify compliance?

No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.

Projects in more than one state

More Pacific plan review guides

For another project's location, start with its own authority and reference list. Requirements and adopted editions can differ across state lines.

Official source directory

Keep the reference trail

City plan check guides in Washington: Seattle plan check

Browse all states and city guides

Review the set before you submit

Bring your drawings. We read the local codes and amendments that governments publish online.

Check your Washington permit set before you submit

Trusted by hundreds of professionals

Product screenshot