Identify the county first for a Hawaii permit package. Keep the county’s adopted requirements and the state’s reference directory distinct, and confirm any transition rules before choosing the documents for an AI review.
Groundbook can review your drawings against the state and local code PDFs you upload. Add the adopted code books and amendments that apply to your project, then review potential issues with links to the supporting sources.
Add your references
Upload the applicable code PDFs alongside the drawing set. Include the edition, local amendments, and project requirements.
Choose each file’s role
Set code PDFs to Code and Use as reference. Mark the drawings you want reviewed as Check this file.
Review the findings
Follow the linked drawing and reference, check applicability, and have the responsible professional verify the issue.
California code PDFs shown as an example. Upload the references that apply to your project.Try with your code PDFs
State and local references
Code references for Hawaii
Examples of references you can bring into Groundbook. Confirm the adopted edition, effective date, and project scope with the reviewing authority, then upload the applicable PDFs.
Include the energy reference selected for the project with applicable county provisions and supporting design documents.
Code names link to official agency or publisher resources. Reviewed September 9, 2026. The reference set comes from the files you supply.
Hawaii reference guide
Establish who reviews what
Start with the state directory
Hawaii’s Building Code Council publishes adopted state codes, amendment links, and wind topographic-factor resources. The directory also notes the State Fire Council’s separate role in adopting the fire code.
The council’s rules page includes emergency-proclamation notices affecting code updates and the usual county adoption timetable. Obtain current county confirmation rather than assuming a fixed two-year adoption deadline controls your application.
Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.
Prepare a useful review
What to bring for Hawaii
Use this preparation list for Groundbook alongside the official permit checklist.
County code confirmation
Include the county’s adopted editions, amendments, current permit checklist, and any written transition or applicability determination.
Site and wind references
Supply the project’s selected wind criteria and supporting site information, topographic references where used, structural calculations or reports, and envelope schedules.
Existing and proposed conditions
Bring civil, architectural, structural, and MEP PDFs with the scope clearly marked. On renovations, identify which existing conditions were verified and which remain assumptions.
A current drawing register
Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.
Can I choose a Hawaii code edition from the state directory alone?
Use the directory as a starting point, then verify county adoption and the application’s governing requirements. The state page includes notices affecting the adoption timetable, so an automatic deadline assumption is insufficient.
Which documents should I supply for a Hawaii AI plan review?
Supply the current drawing set and schedules, relevant specifications and reports, the applicable code and amendment PDFs, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. Groundbook reviews the supplied evidence; do not assume every local requirement is already available.
Does Groundbook approve a permit or certify compliance?
No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.