Guide · Specifications and drawings · 03 37 13

Check shotcrete specifications against wall sections, reinforcement details, and finish callouts

UFGS Section 03 37 13 Shotcrete, a USACE-prepared guide specification issued in August 2026 as a complete review and update of the February 2018 edition, covers concrete or mortar conveyed through a hose and projected pneumatically onto a surface, with tailoring options for structural or nonstructural work, fiber-reinforced shotcrete, and the wet-mix or dry-mix process. Its articles cover nozzleman and crew qualifications, preconstruction test panels for each mixture, shooting orientation, and nozzleman, production test panels, in-place cores, and bond tests, cement, supplementary materials, aggregate, admixtures, fibers, and packaged materials, the strength, flexural, durability, and bond properties the editor fills in, surface preparation on earth, rock, concrete, and masonry, noncontact lap splices, forms, joints, ground wires, placement technique, encasement of reinforcement, hot and cold weather limits, five finishes, curing, protection, tolerances, repair, and the acceptance criteria tied to the panels and cores.

Start with the Work Specified brackets of the issued Section 03 37 13: confirm which elements on the drawings are to be shot, and that the structural, nonstructural, fiber-reinforced, wet-mix, or dry-mix choice kept matches what the sections and details show. Then check that the nozzleman certification covers the shooting orientations drawn, that the reinforced test panels represent the most congested reinforcement on the drawings, that lap splices, cover, joints, and finishes in the details follow the shotcrete paragraphs rather than cast-in-place habits, and that the blanks for strength, cover, durability, and tolerances are filled in to agree with the structural notes.

Assemble the review package

Gather the structural general notes with design strength, exposure, and cover, the plans, wall and slab sections, and elevations that mark which elements are shotcrete and their thicknesses, the reinforcement details with bar sizes, spacing, and lap splices, the joint and control joint layout, the architectural elevations and finish legend where the shotcrete is exposed, the retaining, slope, tunnel, or excavation support drawings with soil nails, anchors, drains, and weep holes where shotcrete faces earth or rock, any repair drawings for existing concrete or masonry, the geotechnical report, and the issued Section 03 37 13 with Section 03 30 00, the project’s special inspection section, and Section 01 33 00. Follow one shotcrete wall from its substrate through the reinforcement, the joints, and the finish before assuming the others match.

WBDG publishes UFGS 03 37 13: Shotcrete as a public guide-specification reference (accessed November 11, 2026). Use your project’s issued specification and amendments for the actual comparison; the guide specification does not automatically govern your project. The checklist below is an original suggested review workflow, not a reproduction of the UFGS requirements.

Eight checks to run against the issued set

Use one record per location or system. The CSV contains the same eight prompts plus fields for source revisions, observed evidence, the review owner, the decision, and closure references.

Eight specification-to-drawing checksSwipe or scroll sideways to read all columns.
CheckSources to compareQuestion to resolve
Which elements are shot, and in which processWork Specified brackets (structural, nonstructural, fiber-reinforced, wet-mixture, dry-mixture) and note (delete both process options to leave the choice to the contractor) + Unit of Measure bracket + Fiber-Reinforced Shotcrete and Shotcrete definitions + plans, sections, and general notes marking shotcrete elements and thicknessesDo the drawings mark each element to be shot, its thickness, and whether it is structural, rather than a general note allowing shotcrete as an alternative to formed concrete anywhere, does the bracket kept match, and where both process options were deleted to leave the choice open, have the paragraphs that apply to one process only, such as the water-cementitious ratio and air testing, been kept in a form that works for either, and does the unit of measure match how the drawings or the bid schedule quantify the work?
Nozzleman certification and crew qualificationsQualifications note (refers to paragraphs “Structural Shotcrete” and “Nonstructural Shotcrete”) and article (ACI certification of nozzlemen for structural or fiber-reinforced work) + Structural Concrete paragraph (process and vertical and overhead brackets; contractor and foreman experience) + Nonstructural Shotcrete paragraph + sections and soffits showing vertical and overhead workDoes the certification bracket kept name the process and the orientations the drawings actually require, overhead where soffits, tunnel crowns, or undersides are shot, and since the note refers to a Structural Shotcrete paragraph the section titles Structural Concrete, has the specifier confirmed that the structural requirements apply to the shotcrete work selected in Work Specified?
Preconstruction panels that represent the drawn reinforcementPreconstruction Testing note and General Requirements (panels for each mixture, shooting orientation, and nozzleman; testing agency; second panel; reinforced panels cored for visual examination) + Preplacement Verification (reinforcement the same as specified or the same as the existing structure) + reinforcement details and the most congested bar zones on the drawingsHas the reinforced-panel option been kept where the drawings show heavy or layered reinforcement, and does the panel reinforcement copy the largest bars, tightest spacing, and lap zones on the details rather than a typical mat, do the panel orientations cover every shooting position the drawings imply, and where existing structures are strengthened, does the Preplacement Verification bracket point to the existing reinforcement as surveyed?
Lap splices, cover, and encasement of reinforcementReinforcement article (non-fiber reinforcement to the contract documents and Section 03 30 00) + Reinforcement Laps (noncontact laps with a clearance and transverse spacing bracket; contact laps only with approval; lapped bars in one plane parallel to shooting; welded and mechanical splices) + Encasement of Reinforcement (cover blank; note to ACI 318 and 350) + Placement Techniques (encapsulation, corners, rebound) + bar details and lap schedulesDo the reinforcement details show noncontact laps with the clearance the issued section sets, or do they carry cast-in-place contact laps and bundled bars that the shotcrete cannot encase, is the cover blank filled in and equal to the cover in the structural notes and sections, and are bar size, spacing, and the number of curtains in thin walls realistic for shooting behind the front layer without shadows or voids?
Substrate, forms, ground wires, and bondPreparation of Surface for earth, concrete, masonry, and shotcrete, rock, and reinforcement + Forms (escape of air, overspray, and rebound; form release) + Alignment Control (ground wires at corners and offsets) + Testing Shotcrete Bond to Substrate and Bond Strength brackets + Placement Techniques (no standing or flowing water) + excavation support, soil nail, anchor, drain, and weep hole details + repair drawingsWhere shotcrete faces earth or rock, do the drawings show the drainage behind it, the weep holes, and the anchor or soil nail heads it must encase, and is groundwater addressed, since the section does not allow shooting onto standing or flowing water, where it bonds to existing concrete or masonry, is the bond test and bond strength kept with a value filled in, and do the elevations give the lines and thicknesses the ground wires must establish at corners and offsets?
Joints, finishes, and the fiber cover layerConstruction Joints (tapered; cut while plastic; slab intersections) + Control Joints (as indicated in the contract documents; reinforcement discontinued bracket) + Finish paragraphs (Gun Finish, Cutting Screed, Flash Coat, Float and Trowel Finish, Fiber-Reinforced Shotcrete layer “as denoted”) + Rod finish definition (describes a cutting screed) + Architectural Finishes curing restriction + elevations and finish legendAre the control joints the section leaves to the contract documents actually located on the elevations, are construction joints drawn tapered rather than square, is the finish named on each exposed elevation one of the finish paragraphs kept, with the unused definition of rod finish deleted or tied to a finish, and where fiber-reinforced shotcrete is exposed to touch, do the sections include the nonfiber cover layer and its finish in the drawn thickness?
Mixture properties, durability, and the test programCompressive Strength, Flexural Strength and Properties, Water-Cementitious Ratio (delete for dry-mix), Air Content (not bracketed; note asks for test frequency in Testing Shotcrete), Chloride Content, Voids and Absorption Properties, Bond Strength, and Resistance to Alkali-Silica Reaction + Testing Shotcrete, Test Panels (frequency, size, orientation), and Testing In-Place Shotcrete + Quality Assurance (submittals per Section 03 30 00) + structural notes on strength, exposure, and freeze-thawDo the strength, flexural, durability, and chloride blanks agree with the structural notes and the exposure the site imposes, is Air Content kept only where freeze-thaw, seawater, or deicing salts apply and given a test frequency, since its note asks for one in a paragraph that has no place for it, has the specifier corrected the panel dimensions, whose metric and inch-pound values disagree, and is Section 03 30 00 in the project, since Quality Assurance sends the quality control plan and laboratory qualifications there?
Tolerances, weather, curing, repair, and acceptanceTolerances bracket (ACI 117 offered; its note says ACI 117 excludes shotcrete) + Hot Weather Shotcreting (“PREQUALIFICATION TESTING”) and Cold Weather Shotcreting + Curing and Protection + Repair of Shotcrete and Commercial Patching Products + Acceptance of Work (defect size bracket; acceptance on compressive or flexural strength) + Compliance with Test Properties (boiled absorption at “the specified test age”) + drawings tolerance and flatness notesHas the specifier stated shotcrete tolerances for cross-section, cover, and surface finish, in the section or on the drawings, rather than relying on a standard the note says excludes shotcrete, does the hot weather exception point to Preconstruction Testing, is a test age given for absorption and voids, since the acceptance paragraph measures against one that is not specified, and do the architectural tolerances on exposed shotcrete agree with the finish kept?

Worked example: a shotcrete retaining wall drawn like a formed wall

Illustrative example: a training facility adds a cut slope retained by a reinforced shotcrete wall over soil nails, with an exposed architectural face along a walkway. The structural sections show two curtains of large bars with contact lap splices, the cover in the general notes differs from the cover drawn on the typical section, and the elevations give a smooth finish but no control joint locations. The issued Section 03 37 13 keeps structural, wet-mix shotcrete with the ACI certification bracket for vertical work only, though the wall includes an overhead return at a stair, keeps the reinforced test panel option with a typical single mat, leaves the cover and tolerance blanks unfilled with ACI 117 kept, and keeps Air Content without a test frequency for a site with freeze-thaw exposure. No drain or weep hole detail appears behind the shotcrete.

Ask the structural engineer to redraw the laps as noncontact laps with the clearance the issued section sets, or to justify contact laps for approval, to reconcile the cover between the notes and the section, to detail the drainage and weep holes behind the wall, and to locate the control joints on the elevations. Ask the specifier to add the overhead orientation to the certification bracket, to require reinforced panels that copy the two-curtain lap zone, to fill in the cover, to state shotcrete tolerances for the exposed face rather than ACI 117 alone, to give an air test frequency, and to correct the hot weather reference to Preconstruction Testing, and confirm with the architect that the finish named on the elevations is one the section keeps.

Avoid a false conflict

Section 03 37 13 covers pneumatically placed concrete or mortar for structural, nonstructural, and fiber-reinforced work by the wet-mix or dry-mix process. Formed and placed concrete follows Section 03 30 00 and the concrete guide, which this section also relies on for non-fiber reinforcement and the quality assurance submittals, soil and rock anchors behind a shotcrete facing follow Section 31 68 13 and the soil and rock anchor guide, and special inspection follows the project’s special inspection section, so check those before calling a requirement missing. Some of the section’s own wording needs resolving before it is compared with the drawings: the Qualifications note refers to a Structural Shotcrete paragraph that is titled Structural Concrete, the rod finish definition describes a cutting screed and is used nowhere else, the hot weather exception relies on a Prequalification Testing paragraph the section does not have, the test panel dimensions disagree between metric and inch-pound values, the Tolerances bracket offers a standard its own note says excludes shotcrete, the absorption acceptance refers to a test age that is not specified, and the Air Content note asks for a test frequency in a paragraph with no place for one. Ask the specifier which wording the project intends before treating a difference as a design conflict.

When requirements disagree, follow the project’s document-control and clarification process. Do not assume that drawings always override specifications, or the reverse. Identify the exact sources and request an authorized decision.

Close the issue across the affected documents

Record the location or tag, drawing and specification references, issue dates, observed difference, and the decision needed. Assign an owner and keep the item open until the response identifies the governing requirement. Check the revised drawings and specification references together; a response email alone may leave the issued package inconsistent.

For the overall process, use the guide to drawing and specification conflicts. Mark an inapplicable checklist row with a reason, and distinguish a verified correction from a question that still needs design information.

Where Groundbook fits

Groundbook’s drawing and specification review helps investigate potential disagreements in the documents you supply. Include the relevant specification sections and drawing references, then verify the cited evidence with the responsible reviewers before acting on a finding.

Questions, answered

FAQs

What should a shotcrete specification review compare?

Compare which elements are shot and in which process, nozzleman certification and crew qualifications, preconstruction panels that represent the drawn reinforcement, lap splices, cover, and encasement, the substrate, forms, ground wires, and bond, joints, finishes, and the fiber cover layer, the mixture properties, durability, and test program, and tolerances, weather limits, curing, repair, and acceptance.

How is a shotcrete review different from a cast-in-place concrete review?

The current UFGS 03 37 13 Shotcrete on WBDG adds requirements that a formed-concrete review does not cover: certification of nozzlemen for the process and shooting orientation, preconstruction and production test panels, noncontact lap splices so the bars can be encased, ground wires to set thickness, tapered construction joints, shot finishes, and acceptance based on cores from panels or the structure. UFGS numbers are DoD guide specification numbers, not universal MasterFormat titles, and your project’s issued specification governs.

Can Groundbook check shotcrete drawings against Section 03 37 13?

Groundbook compares the drawing set with the reference documents you upload, such as your issued Section 03 37 13, Section 03 30 00, the geotechnical report, and licensed standards you hold, and links each potential disagreement to both sources. It has no built-in code library and does not design the wall or lining, calculate cover, laps, or strength, evaluate test panels or cores, certify compliance, or approve submittals. Each finding is a question for the structural engineer, the specifier, or the contracting officer.

Keep exploring

Continue your review

Check marine concrete specifications against pier, pile cap, and seawall drawings and the service life basis

Compare service life inputs, exposure zones, cover, reinforcement and coatings, strength basis, joints, and curing with UFGS 03 31 29.

Explore

Check stressed tendon specifications against tendon profiles, anchorage details, and structural notes

Compare tendon type, strand, ducts and sheathing, profiles, anchorages, stressing, grout class, and pocket patching with UFGS 03 23 00.

Explore

Check concrete specifications against drawings

Compare concrete mix references, slab finishes, joints, embeds, and curing requirements across specifications and drawings. Includes an editable checklist.

Explore

Concrete and reinforcement drawing review checklist

Review mixes, bar marks, cover, splices, openings, embeds, and joints across placing drawings and contract documents. 12 prompts and a free editable CSV.

Explore

Check soil and rock anchor specifications against anchor schedules, wall elevations, and anchorage details

Compare anchor design criteria, lock-off loads, corrosion class, bond zones, drilling, grouting, and performance and proof tests with UFGS 31 68 13.

Explore

ACI 117 tolerance review: which tolerances the documents invoke, and where they conflict with what bears on the concrete

Review concrete tolerances against ACI 117-10: checklists, embeds, openings, slab surfaces, and interfaces with steel, precast, and facades. With AI limits.

Explore

ACI 301 review: how the project specification and drawings complete ACI’s reference specification

Review a project that cites ACI 301-20: edition, mandatory and optional checklist choices, specialty concrete sections, finishes, tolerances, and testing.

Explore

ACI 562 concrete repair review: assessment, repair basis, construction documents, and quality assurance

Review concrete repair and rehabilitation drawings against ACI CODE-562-25: assessment, design basis, temporary works, and QA. With AI limits.

Explore

ACI 350 review: tanks, basins, and treatment structures across structural, process, and specification documents

Review water and wastewater tanks and basins against ACI 350-20: exposure, joints, waterstops, tightness testing, and coatings. With AI limits.

Explore

Check special inspection specifications against the drawings

Compare the statement and schedule of special inspections, seismic systems, inspector qualifications, and fabricator shops with UFGS 01 45 35.

Explore

Drawings vs. specifications

Compare drawing requirements with specifications, schedules, and controls. Find potential equipment, material, and scope inconsistencies with Groundbook AI.

Explore

Bring your next set into focus

Set up a review or talk through your project with our team.

Check shotcrete specs against your wall sections and reinforcement details

Trusted by hundreds of professionals