The link to the existing building changes floor level with no stair or ramp drawn.

The plans and the technical report count parking, bike spaces and areas differently, and several plans cannot be set out.

  • Value engineering
  • Scope completeness
  • Area schedules
  • Parking counts
90 pagesArchitectural and structural drawings
Coordination reviewCoordination and completeness within the set
15 findingsPotential issues surfaced for verification
7 examplesConcise review details below

Medical center and apartment scope

Architectural and structural drawings for a medical center and a multi-apartment building, reviewed with the project’s technical report.

What the review compared

The review read the architectural plans, sections and area tables for both buildings beside the project’s technical report. It looked for scope that one document carries and another omits, and for counts and areas that a cost estimate could take from either source.

Where the documents diverge

The plans and the report disagree on bike and car parking and on the roof slope. Identical terraces carry different areas, two rooms have no assigned use, and the medical center plans give no dimensions to set out walls or openings.

What to verify next

The architect should resolve the floor step at the building link, dimension the plans and reconcile the parking and area figures with the report before pricing. This review did not enable code checking; the examples are questions for the responsible designers.

7 selected examples from the review

Seven distinct findings, summarized for professional verification.

01Medium priority

Building link has an unresolved floor step

The link to the existing building changes level; no stair or ramp is drawn.

Why it matters: The passage cannot be set out.

What to check: Show the stair or ramp with levels in plan and section.

Architectural
02Medium priority

Stacked terraces have different areas

Identical terraces stacked on three floors carry different areas in the area tables.

Why it matters: Apartment and floor area totals are unreliable.

What to check: Measure the terraces to one boundary and update the totals.

Architectural
03Medium priority

Two basement rooms have no use

Two basement rooms still carry a placeholder label instead of a room use.

Why it matters: Their finishes and services cannot be coordinated.

What to check: Assign each room its intended use.

Architectural
04Medium priority

Medical center plans have no setting-out dimensions

Six medical center plans give no overall, grid, wall or opening dimensions.

Why it matters: The contractor cannot set out walls and openings.

What to check: Add dimension strings and check them against the report.

Architectural
05Medium priority

Basement bike store is missing

The technical report places bike parking in the basement; the basement plans show none.

Why it matters: Bike parking location and access are unpriced.

What to check: Draw the bike store or correct the report’s count.

Architectural
06Low priority

Plans draw more car spaces than the report

The basement plans draw two more parking spaces than the technical report counts.

Why it matters: The documents give two parking totals.

What to check: Confirm the number and align plans and report.

Architectural
07Low priority

Roof slope differs between report and plan

The report sets the flat roof slope at 2 degrees; the roof plan shows 2 percent.

Why it matters: The two values give different falls.

What to check: State one design slope and unit in both.

Architectural

Review scope and priorities

The review organized the questions by severity, discipline, and source context so the responsible designers could investigate them.

01 · Disciplines

Architectural and Structural

Check the findings with the responsible discipline designers.

02 · Priorities

Medium and Low priorities

Selected examples retain their assigned priority.

03 · Review scope

Coordination and completeness within the set

This review checked the documents against one another. No code check was enabled.

04 · Evidence

Findings connected to their source context

Groundbook links each finding to the sheets it came from so the responsible designer can confirm or dismiss it.

Potential impacts describe the issue type. They are not verified outcomes from this project.

Follow the information across the complete set

Groundbook reads the documents you upload and reports where they disagree, where a reference does not resolve, and where a required value is absent.

See how a full set is reviewed or how interfaces are coordinated.

  1. 1
    Map the complete set

    Identify sheets, disciplines, details, schedules, and notes.

  2. 2
    Connect repeated information

    Follow tags, references, and requirements wherever they reappear.

  3. 3
    Check coordination and completeness

    Compare the documents and identify missing or conflicting information.

  4. 4
    Return findings for verification

    Organize potential issues by severity, discipline, and supporting context.

Questions for professional verification

The output supports the responsible designers as they review the source documents and decide what needs to change.

What this result means

  • Groundbook surfaced potential issues for professional review.
  • Severity helps prioritize which questions to investigate.
  • The findings describe coordination and completeness questions in the uploaded set.
  • Each finding includes source context for verification.

What it does not mean

  • Every potential finding is a confirmed error or violation.
  • The project was unsafe, unbuildable, or ultimately noncompliant.
  • Groundbook replaced the responsible professionals or authority.
  • A correction was made, or any cost or delay was avoided.

About this review

Is this a real review?

Based on a Groundbook review completed in October 2026. Findings are summarized.

Are these findings confirmed defects?

No. Each one is a potential issue for the responsible designer to verify against the source documents. Groundbook reports what the documents say and where they disagree. It does not make design decisions, certify compliance, or replace the authority having jurisdiction.

How long did the review take?

Turnaround runs from 20 minutes to 24 hours depending on project size.

Was a code check included?

No code check was enabled for this review. It covered coordination and completeness within the set. Code checking is available: Groundbook reads the building codes that governments publish online and uses licensed codes only where a license allows it. You can upload a copy you’re licensed to use.

Can I see a full report?

Yes. The sample plan review report shows all 79 findings from one review of a drawing set and its specifications, with the cited excerpts.

Give the next drawing set a connected first pass

Upload the project, choose the checks that matter, and receive structured potential findings with source context.

Find what your plans and design report count differently

Trusted by hundreds of professionals