We’re at NCSEA in San Francisco, Oct 28–29 · Booth 110NCSEA · Booth 110 · Oct 28–29

Guide · Code reference

Oregon Mechanical Specialty Code (OMSC) plan review

Oregon’s mechanical specialty code combines the mechanical and fuel gas model codes into one state code. Groundbook can compare the mechanical, plumbing, and architectural drawings with the OMSC you supply and flag conflicts.

Confirm the project uses the 2025 OMSC, mandatory since April 1, 2026, then trace ventilation, exhaust, equipment, duct penetrations of rated assemblies, and fuel gas piping and venting through the mechanical, architectural, and plumbing drawings. AI can flag conflicts; the mechanical designer and building official decide compliance.

What does the OMSC cover?

The Building Codes Division describes the Oregon Mechanical Specialty Code as governing mechanical systems permanently installed to control environmental conditions and related processes within buildings. Because it is based on both the IMC and the IFGC, fuel gas piping and appliance venting are reviewed under it too.

The Oregon Building Codes Division states that the 2025 OMSC is based on the 2024 International Mechanical Code and International Fuel Gas Code, took effect October 1, 2025 with a six-month phase-in during which the 2022 OMSC could be used, and became mandatory April 1, 2026. Checked October 15, 2026. Interim amendments and errata are posted on the same pages; confirm which edition the permit was applied for under.

Model code checks are in the IMC and IFGC guides. Commercial energy is in the OEESC guide, and one- and two-family dwellings use the ORSC.

Gather the mechanical and fuel gas documents

Collect the mechanical plans, schedules, and details, the ventilation calculations or schedule, the fuel gas piping plan and riser, appliance venting details, the architectural plans and wall types where ducts cross rated walls, the roof plan with equipment and exhaust terminations, and the plumbing drawings for condensate and gas.

Check which code each mechanical sheet cites; a sheet copied from another state may cite the model code alone.

Trace OMSC items through the set

Oregon Mechanical Specialty Code document coordination checksSwipe or scroll sideways to read all columns.
Review questionSources to compareDecision to record
EditionMechanical general notes, code analysisConfirm the 2025 OMSC is cited rather than a model code or earlier edition.
Ventilation and exhaustVentilation schedule, plans, roof planMatch outdoor air and exhaust to the spaces and terminations drawn.
Equipment and accessEquipment schedule, plans, sectionsCheck scheduled equipment appears on plans with access shown.
Rated penetrationsDuct plans, wall types, damper scheduleFind ducts crossing rated walls or floors without a damper or listed system.
Fuel gas pipingGas plan, riser, appliance scheduleMatch appliance loads and locations to the gas piping drawn.
Venting and terminationsVenting details, roof plan, elevationsCheck vent terminations clear openings and air intakes as drawn.

The mechanical drawing checklist gives a working log, and air distribution specifications are compared in the HVAC air distribution guide.

Example: a gas water heater with no gas line

Hypothetical example. The plumbing schedule lists a gas-fired water heater in a mechanical room. The OMSC fuel gas plan does not extend piping to that room, and the mechanical venting details show only the rooftop units.

The plumbing schedule lists a gas-fired water heater in Mechanical 104, but the fuel gas plan and venting details do not serve it. Confirm the fuel type and coordinate the gas piping, venting, and schedules.

The mechanical and plumbing designers confirm the appliance and update the drawings. The finding is a coordination question.

Review Oregon mechanical drawings with Groundbook

Upload the current drawings and specifications to Groundbook, and state the edition, amendments, and review scope in your instructions. Add the Oregon Mechanical Specialty Code edition the project uses from a copy you are licensed to use, where the license permits uploading it, and the jurisdiction’s published amendments. See how Groundbook works with local and licensed codes.

Compare the mechanical plans, schedules, ventilation information, fuel gas plans, venting details, roof plan, plumbing schedules, and architectural wall types. Flag model code citations instead of the OMSC, equipment missing from plans, ducts crossing rated assemblies without protection, and gas appliances not served by piping or venting. Use the supplied OMSC and cite both sources.

Groundbook links each potential finding to the sheets involved.

Document review does not size equipment, gas piping, or ventilation. Those remain with the mechanical designer and the building official.

Questions, answered

FAQs

Is the 2025 OMSC mandatory?

The Oregon Building Codes Division lists April 1, 2026 as the mandatory date, after a phase-in that began October 1, 2025.

Does the OMSC include fuel gas?

Yes. The Building Codes Division states that the 2025 OMSC is based on the 2024 International Mechanical Code and International Fuel Gas Code.

Can Groundbook check mechanical drawings against the OMSC?

It can compare supplied drawings with the OMSC you upload and flag potential discrepancies for the designer to verify.

Bring your next set into focus

Set up a review or talk through your project with our team.

Check your mechanical and gas drawings against the OMSC

Trusted by hundreds of professionals