2025 Oregon Structural Specialty Code (OSSC) plan review

Oregon applies statewide specialty codes, and the Structural Specialty Code is the one most commercial and multifamily projects are reviewed under. Groundbook can compare the drawings with the OSSC you supply and flag conflicts.

Confirm which OSSC edition the project was designed and permitted under, then trace the code analysis, structural design criteria, egress, and rated construction through the plans, sections, and structural drawings. AI can flag conflicts; the design professional and building official decide compliance.

What does the Oregon Structural Specialty Code cover?

The Oregon Structural Specialty Code is one of Oregon’s statewide specialty codes, adopted by the Building Codes Division. It applies to commercial structures, while one- and two-family dwellings are generally under the Oregon Residential Specialty Code.

The Oregon Building Codes Division states that the 2025 OSSC is based on the 2024 International Building Code, International Fire Code, and International Existing Building Code. Its construction provisions took effect October 1, 2025 with a six-month phase-in during which the 2022 OSSC could also be used, and became mandatory April 1, 2026. Chapter 1, the administrative chapter, took effect October 1, 2025 with no phase-in. Checked October 1, 2026, and again October 22 and November 5, 2026.

Because of the phase-in, projects submitted between October 2025 and March 2026 may be on either edition. Record which one the design uses. Model code checks are described in the IBC and IEBC guides, and Portland submittal practice is in the Portland plan check guide. Houses follow the Oregon Residential Specialty Code, fire access and systems the Oregon Fire Code, and commercial energy the OEESC, which is Chapter 13 of the OSSC.

Where to read the 2025 OSSC and what changed

The Building Codes Division’s adopted codes online page links the 2025 OSSC on ICC Digital Codes, and the division posts errata and interim amendments as separate PDFs. Review against the codebook together with those documents. The changes below are the ones the division itself describes; checked November 5, 2026.

2025 OSSC changes for drawing reviewSwipe or scroll sideways to read all columns.
TopicWhat the Building Codes Division saysWhat to check on the drawings
Basis and datesBased on the 2024 IBC, the new construction provisions of the 2024 IFC, and the 2024 IEBC, and mandatory April 1, 2026. Under OAR 918-460-0010, the code in effect when the plan review or permit application is filed applies to that application.The cover sheet and code analysis cite the edition in effect on the application date.
Design snow loadsThe snow load technical bulletin describes the move to ASCE 7-22: risk-targeted, strength-level ground snow loads by Risk Category from the ASCE Hazard Tool or the Oregon Design Criteria Hub replace the earlier state snow load map, the thermal factor now depends on roof insulation and ground snow load, and Oregon’s minimum roof snow load is removed. It warns against mixing the old and new methods.Ground snow load, Risk Category, and load combinations in the structural notes come from one edition.
Existing buildingsA Chapter 34 interim amendment, effective April 1, 2026, lets specific repairs and alterations proceed without ASCE 7-22 design snow loads unless defined conditions apply.Repair and alteration notes state their snow load basis.
Single exit stairsAppendix Q allows certain Group R-2 buildings of up to four stories above grade to have one exit stair, only where the municipality adopts it and the local fire service approves.A single-stair R-2 design cites the local adoption.

Collect the Oregon code analysis and structural criteria

Collect the code analysis sheet, structural general notes with design criteria, life safety plans, floor plans, sections, wall types and rated details, door schedule, and the structural drawings. Add the energy compliance documents for the Oregon Energy Efficiency Specialty Code and the mechanical, plumbing, and electrical drawings that reference their own specialty codes.

Check that each discipline cites the right Oregon specialty code and edition rather than the model code.

Trace Oregon references through the set

Oregon Structural Specialty Code document coordination checksSwipe or scroll sideways to read all columns.
Review questionSources to compareDecision to record
EditionCover sheet, code analysis, structural notesConfirm one OSSC edition is used consistently across disciplines.
Specialty code referencesEach discipline’s general notesIdentify sheets citing model codes or the wrong Oregon specialty code.
Structural design criteriaStructural notes, calculations summary, architectural sectionsMatch design loads and criteria notes to the drawings that rely on them.
Code analysisOccupancy, construction type, area, sprinkler basisMatch the analysis to current plans and sections.
Egress and life safetyLife safety plan, floor plans, door scheduleTrace each route through current plans and openings.
Existing buildingsExisting conditions, scope of work, structural evaluationConfirm how alteration work is classified and evaluated.

The Oregon page lists the state’s specialty codes and official sources, and the structural drawing checklist covers the structural set.

Example: one discipline still on the earlier edition

Hypothetical example. A project submitted after the phase-in ended cites the 2025 OSSC on the architectural code analysis, while the structural general notes still cite the 2022 OSSC and its design criteria references.

The architectural code analysis cites the 2025 OSSC, while the structural general notes cite the 2022 edition. Please confirm the edition that applies to this submittal and coordinate the structural criteria references.

The structural engineer confirms the edition and updates the criteria. The conflict is a coordination question; the building official decides the code basis.

Review Oregon drawings with Groundbook

Upload the current drawings and specifications to Groundbook, and state the code edition, amendments, and review scope in your instructions. Add the applicable Oregon Structural Specialty Code from a copy you are licensed to use, where the license permits uploading it, and add the jurisdiction’s published amendments. See how Groundbook works with local and licensed codes.

Compare each discipline’s Oregon specialty code references and editions, the code analysis, and the structural design criteria with the current plans, sections, and structural drawings. Flag mixed editions and conflicting criteria. Use the supplied OSSC where applicable and cite both sources.

Groundbook links each potential finding to the sheets involved. Verify the edition and any interim amendments the Building Codes Division issued before sending a comment.

Document review does not perform structural calculations or approve a permit. Those remain with the engineer of record, the building official, and the Building Codes Division.

Questions, answered

FAQs

Where can I read the 2025 OSSC?

The Oregon Building Codes Division links the 2025 OSSC on ICC Digital Codes from its adopted codes online page and posts errata and interim amendments as separate PDFs. ICC also sells the printed codebook.

What changed in the 2025 OSSC?

It moves to the 2024 IBC, IFC, and IEBC. The division calls the switch to ASCE 7-22 design snow loads the most comprehensive revision to snow load determination in decades. An optional Appendix Q for single-exit-stair Group R-2 buildings applies only where a municipality adopts it with fire service approval.

Is the 2025 OSSC mandatory?

The Oregon Building Codes Division lists April 1, 2026 as the mandatory date for the 2025 OSSC construction provisions, after a six-month phase-in that began October 1, 2025.

Can Groundbook check drawings against the Oregon Structural Specialty Code?

It can compare supplied drawings with the OSSC you upload and flag potential discrepancies for the design professional to verify.

Keep exploring

Continue your review

AI plan review in Oregon

Oregon specialty codes and official sources.

Explore

Portland plan check guide

Portland Permitting & Development submittal and review paths.

Explore

International Building Code (IBC) plan review

Review drawings against the IBC: code summary, occupancy, construction type, egress, rated assemblies, and accessibility. See checks and AI review limits.

Explore

Oregon Fire Code (OFC) plan review

Review Oregon drawings against the 2025 Oregon Fire Code: State Fire Marshal adoption, phase-in, IFC basis, access, water supply, and fire systems.

Explore

Oregon Residential Specialty Code (ORSC) plan review

Review house plans against the 2026 Oregon Residential Specialty Code: 2024 IRC basis, October 2026 phase-in, Chapter 11 energy, and plan checks.

Explore

Oregon Mechanical Specialty Code (OMSC) plan review

Review mechanical drawings against the 2025 Oregon Mechanical Specialty Code: IMC and IFGC basis, phase-in dates, ventilation, and fuel gas checks.

Explore

Oregon Plumbing Specialty Code (OPSC) plan review

Review plumbing drawings against the 2026 Oregon Plumbing Specialty Code: 2024 UPC basis, October 2026 effective date, fixtures, and piping checks.

Explore

Oregon Energy Efficiency Specialty Code (OEESC) plan review

Review commercial drawings against the 2025 Oregon Energy Efficiency Specialty Code: ASHRAE 90.1-2022 basis, OSSC Chapter 13, and envelope and MEP checks.

Explore

Oregon Electrical Specialty Code (OESC) plan review

Review Oregon electrical drawings against the 2026 OESC: the 2026 NEC plus Oregon’s table of amendments, effective October 1, 2026, and plan checks.