Guide · Specifications and drawings · 26 12 19

Check pad-mounted transformer specifications against the one-line, electrical site plan, grounding details, and pad details

UFGS Section 26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers, a NAVFAC-prepared guide specification renumbered in May 2024 from 26 12 19.10 without technical revision, covers three-phase, compartmental, dead-front and live-front pad-mounted transformers for exterior step-down service on distribution systems. It specifies the high- and low-voltage compartments with their connectors, bushings, load-break switches, bayonet and current-limiting fuses, surge arresters, and an optional meter and current transformers; the transformer ratings, tap changer, impedance, sound level, and efficiency; less-flammable or mineral oil insulating liquid; corrosion protection; warning and arc flash labels; the concrete pad; factory design and routine tests; the ground ring; and NETA acceptance tests. Single-phase units, secondary unit substations, and pad-mounted switchgear have their own sections.

Start with the drawing note of the issued Section 26 12 19: it asks for a single-line diagram showing each transformer’s connectors, inserts, arresters, switches, fuses, current transformers, and meters, a grounding plan, cable types and sizes, the primary and secondary voltages in service, and special site conditions, plus the NAVFAC pad-mounted transformer details edited for the project. Confirm those exist, then check that the dead-front or live-front choice, radial or loop feed switching, connector rating, insulating liquid, and corrosion bracket agree with the one-line, the available fault current, and the site, and that the pad and ground ring details match how the paragraphs were edited.

Assemble the review package

Gather the medium-voltage one-line diagram, the electrical site plan with transformer locations, duct banks, fences, and distances to buildings, the pad-mounted transformer details (the NAVFAC PADMDE series edited for the project) and the arc flash label detail, the transformer schedule with kVA, voltages, and impedance, the grounding plan and ground ring detail, the short-circuit, coordination, and arc flash study, the metering details, and the issued Section 26 12 19 with Sections 33 71 02, 26 08 00, 03 30 00, the agency’s metering section, and 08 71 00 if padlocks are kept. Follow one transformer from its primary feeder through the compartment, fuses, and windings to the secondary conductors, meter, and ground ring before assuming the others match.

WBDG publishes UFGS 26 12 19: Pad-Mounted, Liquid-Filled, Medium Voltage Transformers as a public guide-specification reference (accessed November 17, 2026). Use your project’s issued specification and amendments for the actual comparison; the guide specification does not automatically govern your project. The checklist below is an original suggested review workflow, not a reproduction of the UFGS requirements.

Eight checks to run against the issued set

Use one record per location or system. The CSV contains the same eight prompts plus fields for source revisions, observed evidence, the review owner, the decision, and closure references.

Eight specification-to-drawing checksSwipe or scroll sideways to read all columns.
CheckSources to compareQuestion to resolve
What the drawings must showDrawing note (single-line with connectors, inserts, surge arresters, switches, fuses, current transformers with ratings, and meters; grounding plan; cable types and conductor sizes; primary and secondary voltages in IEEE C57.12.00 notation, the nominal voltage in service rather than the class; altitude, temperature, humidity, fumes, dust, and seismic conditions) + Details note (edited PADMDE details and the arc flash label on the drawings, not in the specification) + Installation (as indicated on project drawings) + one-line and transformer detailsDoes the one-line show every item the note lists for each transformer and state the primary voltage in service rather than the voltage class, does the set include the PADMDE detail that matches the primary system grounding and the arrester choice, and are site conditions such as altitude, corrosive exposure, and seismic requirements stated where the manufacturer will see them?
Scope and rating limitsOpening notes (kVA and voltage range for this section; step-up and higher-voltage uses need significant modification; large secondary currents better served by a secondary unit substation; fault current and arc flash energy at larger sizes) + related sections note (26 12 21 single-phase, 26 11 16 secondary unit substations, 26 13 00 pad-mounted switchgear, 26 08 00 testing) + Product Coordination (Sections 33 71 01, 26 20 00, and 33 71 02) + transformer scheduleIs every scheduled unit a three-phase step-down transformer within the range the opening note sets for this section, have solar or other step-up units been specified elsewhere or the section modified as the note warns, and do the largest units on the schedule fall where the note recommends a secondary unit substation or more than one service point instead?
High-voltage compartment: dead-front or live-frontHigh Voltage, Dead-Front (lead-in “configured for loop feed application” unbracketed; load-break or dead-break connectors; bushing wells or one-piece bushings; inserts; parking stands; standoff bushings; protective caps) + connector notes (lower-rated connectors only below their fault rating; dead-break connectors where fault current, loop feed switching, or cable size calls for them) + High Voltage, Live-Front (AHJ approval; delete dead-front; terminators per Section 33 71 02; phase barriers) + short-circuit study and cable scheduleDoes the available fault current at each transformer, from the issued study, support the connector rating kept, does the primary cable size on the one-line suit the connector and bushing choice, has the specifier edited the dead-front lead-in so a radial unit is not described as configured for loop feed, and if live-front is chosen, is the approval recorded and are the dead-front paragraphs deleted?
Switching, fusing, and arrestersLoad-break switch note (two-position switches only under UFC 3-550-01) + radial-feed switch or loop feed sectionalizer switches with the arrangement table + bayonet expulsion fuses in series with partial-range current-limiting fuses (oil retention valve; drip shield; warning label; fuse placement bracket deleted for loop feed) + surge arrester note (ends of radials and normally open points in loops) and rating brackets + time-current curve brackets in Reduced Submittal Requirements and Pad-Mounted Transformer Drawings + one-line and coordination studyDoes the one-line show radial or loop feed for each unit consistent with the switch paragraph kept, are arresters drawn at the radial ends and loop open points the note names, is the arrester rating bracket filled to suit the system grounding shown, and does the coordination study use the fuse curves the submittal paragraphs request where the secondary breakers have adjustable trips?
Transformer ratings, liquid, and efficiencyTransformer (less-flammable or oil-insulated bracket; kVA and voltage blanks; Delta-GrdY required by the note, GrdY-GrdY five-legged core bracket; tap changer; minimum tested impedance list printed without whole-number digits; sound level table; neutral bushing bracket) + Specified Transformer Efficiencies (10 CFR 431 Subpart K table; certification with calculations) + Insulating Liquid (less-flammable liquid required on Navy projects; mineral oil bracket; UFC 3-600-01 separation note) + Nameplates + transformer schedule and site planDo the kVA and voltages on the schedule match the blanks filled in the section, has the specifier corrected the impedance list so each value can be read and checked against the short-circuit study, does the liquid kept follow the agency rule and the building separation drawn on the site plan for that liquid under UFC 3-600-01, and is any GrdY-GrdY unit backed by the waiver the note requires?
Metering, corrosion, labels, and padlocksLow Voltage compartment (no secondary breakers; drain, fill, relief, and gauge accessories) + metering brackets (Section 26 27 14.00 20 for Navy, 26 27 13.10 30 for Air Force, or the in-section socket meter with KYZ output and the current transformer table) + Corrosion Protection (stainless base and cabinet or all-stainless bracket by environmental severity classification under UFC 1-200-01; IEEE C57.12.28 and the C57.12.29 coastal bracket; color) + Warning Signs and Labels and the fence sign bracket + Arc Flash Warning Label (format as indicated) + Padlocks (Section 08 71 00; not Navy or Air Force) + metering details and site planIs one metering approach kept that matches the agency and the metering details, with current transformers chosen for the kVA and secondary voltage on the schedule, does the corrosion bracket match the site’s environmental severity classification with the coastal standard kept where it applies, do the drawings carry the arc flash label detail the paragraph points to, and are fence signs kept only where a fence is drawn?
Pad, ground ring, and installationFoundation for Equipment and Assemblies (slab requirements “unless otherwise indicated”, unbracketed although the note says to include them only when the slab is not detailed; cable wells; no curbs without Technical Proponent approval through a link the opening notes do not give) + Cast-In-Place Concrete (Section 03 30 00 or the in-section bracket, whose curing and repair sentence is garbled) + Grounding (resistance bracket; “Changes” clause) + Pad-Mounted Transformer Grounding (ring conductor bracket; rod-count bracket with an unbracketed rod spacing sentence; CADD detail to match) + Section 33 71 02 + pad and grounding detailsDo the pad detail and the paragraph agree on which governs the slab, has the specifier corrected the concrete curing and repair sentence or deleted that bracket in favour of Section 03 30 00, does the ground ring detail show the conductor and number of rods chosen in the paragraph, with the spacing sentence removed if a single rod is kept, and is the ground resistance bracket the value the grounding plan and Section 33 71 02 use?
Factory tests, acceptance tests, and closeoutSubmittals (SD-09 factory test schedule, design tests, and routine tests; SD-07 efficiencies; SD-06 acceptance tests; SD-10 Data Package 5) + Government Submittal Review bracket and the unbracketed Reduced Submittal Requirements naming four manufacturers (item c “ANSI nameplate data” for drawing item b “IEEE nameplate data”) + Design Tests (“basically the same design”; temperature rise tied to KNAN cooling) + Routine and Other Tests + Section 26 08 00 + Acceptance Checks and Tests (NETA ATS; bracketed electrical tests with no note; liquid water content “on all silicone-filled units”; current transformer checks of a withdrawal mechanism and lubrication) + Follow-Up VerificationIs the reduced submittal route limited to the agencies and projects intended, has the specifier aligned the nameplate wording, does the design test basis fit the insulating liquid actually kept, are the bracketed electrical tests kept or deleted on purpose and coordinated with Section 26 08 00, and have the silicone-filled and current transformer withdrawal items been removed from the acceptance tests?

Worked example: a loop-fed transformer for a new hangar on a coastal installation

Illustrative example: a new hangar on a coastal installation is fed by a loop-fed, three-phase pad-mounted transformer beside the building. The issued Section 26 12 19 keeps the radial-feed switch paragraph, the lower-rated load-break connectors, the mineral oil bracket, the base-and-cabinet stainless bracket, and the single-rod ground ring option with the rod spacing sentence. The one-line shows two primary feeders entering the unit with no arresters at the normally open point, the short-circuit study is not in the set, the separation from the hangar wall on the site plan was set for less-flammable liquid rather than mineral oil, and the pad detail shows a raised curb.

Ask the electrical engineer to change the switch paragraph to loop feed to match the one-line, to issue the fault current at the transformer so the connector rating can be confirmed, to add arresters at the open point, and to confirm the insulating liquid against UFC 3-600-01 and the separation drawn. Ask the specifier to keep the all-stainless and coastal enclosure brackets for the site’s exposure, to choose the rods that match the ground ring detail, to correct the impedance list, and to remove the curb from the pad detail or record the Technical Proponent’s approval.

Avoid a false conflict

Section 26 12 19 covers three-phase pad-mounted, liquid-filled transformers with their pads, ground rings, and transformer-specific tests. Single-phase units follow Section 26 12 21, secondary unit substations Section 26 11 16, pad-mounted switchgear Section 26 13 00, primary cables, duct banks, terminations, and ground rods Section 33 71 02 and the underground electrical guide, testing procedures Section 26 08 00 and the acceptance testing guide, and metering the agency’s metering section, while NFPA 70, IEEE C2, UFC 3-550-01, and UFC 3-600-01 govern the design, so check those before calling a requirement missing. Some of the section’s own wording needs resolving: the impedance values print without whole numbers, the reduced submittal asks for ANSI nameplate data against an IEEE nameplate drawing item, the in-section concrete bracket merges curing and repair into one garbled sentence, the liquid test cites silicone-filled units the section forbids, the current transformer checks include a withdrawal mechanism and lubrication, and the curb note points to a link the section does not give. Ask the specifier which wording the project intends before treating a difference as a design conflict.

When requirements disagree, follow the project’s document-control and clarification process. Do not assume that drawings always override specifications, or the reverse. Identify the exact sources and request an authorized decision.

Close the issue across the affected documents

Record the location or tag, drawing and specification references, issue dates, observed difference, and the decision needed. Assign an owner and keep the item open until the response identifies the governing requirement. Check the revised drawings and specification references together; a response email alone may leave the issued package inconsistent.

For the overall process, use the guide to drawing and specification conflicts. Mark an inapplicable checklist row with a reason, and distinguish a verified correction from a question that still needs design information.

Where Groundbook fits

Groundbook’s drawing and specification review helps investigate potential disagreements in the documents you supply. Include the relevant specification sections and drawing references, then verify the cited evidence with the responsible reviewers before acting on a finding.

Questions, answered

FAQs

What should a pad-mounted transformer specification review compare?

Compare what the drawings must show, the scope and rating limits of the section, the dead-front or live-front high-voltage compartment, switching, fusing, and arresters, the transformer ratings, insulating liquid, and efficiency, metering, corrosion protection, labels, and padlocks, the pad, ground ring, and installation, and the factory and acceptance tests.

What drawings does UFGS 26 12 19 expect?

The current UFGS 26 12 19 Pad-Mounted, Liquid-Filled, Medium Voltage Transformers on WBDG asks for a single-line diagram showing each transformer’s connectors, inserts, surge arresters, switches, fuses, current transformers, and meters, a grounding plan, cable types and conductor sizes, primary and secondary voltages, and special site conditions, and tells the designer to put the edited pad-mounted transformer and arc flash label details on the drawings rather than in the specification. UFGS numbers are DoD guide specification numbers, not universal MasterFormat titles, and your project’s issued specification governs.

How is this different from the underground distribution and acceptance testing pages?

UFGS 33 71 02 covers the medium-voltage cables, duct banks, manholes, terminations, and ground rods that feed and surround the transformer, and UFGS 26 08 00 covers how electrical equipment is inspected and tested. UFGS 26 12 19 covers the transformer itself: its compartments, fuses, arresters, insulating liquid, efficiency, pad, ground ring, and the transformer-specific factory and NETA tests. On one project, check that the one-line, the site plan, and the three sections describe the same unit.

Can Groundbook check a transformer one-line against Section 26 12 19?

Groundbook compares the drawing set with the specification sections and reference documents you upload, such as your issued Section 26 12 19, Sections 33 71 02 and 26 08 00, UFC 3-550-01, and licensed standards you hold, and returns potential conflicts with links to the source pages. It has no built-in code library and does not size transformers, calculate fault current, arc flash energy, efficiency, or ground resistance, certify compliance, or approve submittals or tests. Each finding is a question for the electrical engineer, the specifier, or the contracting officer.

Bring your next set into focus

Set up a review or talk through your project with our team.

Check your pad-mounted transformers against the spec

Trusted by hundreds of professionals