Start with the opening drawing note of the issued Section 26 13 13: the drawings must show the single-line diagram with buses, interrupting devices and their capacities, current transformers, and meters; the switchgear location, space, arrangement, and elevations; the grounding plan; cable types, conductor sizes, and top or bottom entry; special service conditions and seismic requirements; the arc flash and available fault current labels; and where arc energy reduction applies. Then check that the room or pad gives front and rear access and space to withdraw breakers, that one control power source is shown, and that every relay on the one-line matches the relay paragraph.
Assemble the review package
Gather the medium-voltage one-line diagram, the switchgear front elevation and room plan or exterior pad plan, the relay and metering diagrams or schedules, the control and elementary diagrams, the grounding plan and details, the duct bank and cable entry plans, the arc flash and available fault current label details, the structural pad or slab detail, the power system study, and the issued Section 26 13 13 with Sections 26 08 00, 26 05 73, 33 71 02, 26 20 00, 25 05 11, and the metering section the project uses. Follow one feeder from its cable entry through its breaker, CTs, relay, and meter before assuming the other sections match.
WBDG publishes UFGS 26 13 13: Metal-Clad Switchgear as a public guide-specification reference (accessed November 18, 2026). Use your project’s issued specification and amendments for the actual comparison; the guide specification does not automatically govern your project. The checklist below is an original suggested review workflow, not a reproduction of the UFGS requirements.
Eight checks to run against the issued set
Use one record per location or system. The CSV contains the same eight prompts plus fields for source revisions, observed evidence, the review owner, the decision, and closure references.
| Check | Sources to compare | Question to resolve |
|---|---|---|
| What the drawings must show | Opening drawing note (single-line with buses, interrupting devices and capacities, CTs, instruments and meters; location, space, arrangement, and elevations; grounding plan; cable type, number, size, and top or bottom entry; altitude, temperature, humidity, fumes, dust, and seismic; arc flash label; available fault current label for service entrance; arc energy reduction locations) + Ratings note (“as indicated” where several lineups are detailed on the drawings) + one-line, room plan, elevations, grounding plan | Does each of the eight items in the note appear somewhere in the set, and where the specifier kept “as indicated” for ratings, does the one-line or a switchgear schedule actually give the value for each lineup? |
| Ratings, system grounding, and breakers | Ratings (voltage rating with grounded, high resistance grounded, ungrounded, or as indicated; short circuit rating; UL listing, with a service entrance option; impulse and power frequency withstand; momentary rating tied to the breaker close and latch rating; item g repeating the system grounding choice with grounded or ungrounded only; main bus continuous current) + Circuit Breakers (continuous current, voltage, BIL, and short-circuit blanks rated on IEEE C37.04 and C37.06; ambient note citing IEEE C37.13, not in References) + one-line and Section 26 05 73 study | Do the voltage, short circuit, and main bus ratings on the one-line match the brackets kept, is the system grounding stated once and the same in items a and g, do the breaker ratings cover the available fault current the power system study reports, and has the specifier replaced or added the standard the ambient note cites? |
| Room layout, access, and future sections | Construction (front and rear accessible; hinged front and rear covers; rear or front and rear aligned as indicated) + Switchgear Drawings (front elevation, section views, footprint, shipping splits, rigging plan; clearance for operation, maintenance, and replacement; future expansion bracket and its note on room size) + Remote Racking bracket + Foundation (front of slab large enough to withdraw breakers or operate two-high breaker lifters) + electrical room plan and architectural plans | Does the room plan show working space at both the front and the rear of the lineup, space in front to draw out a breaker and use a lifter, a delivery path for the largest shipping split, and space for added sections where the future expansion bracket is kept? |
| Arc-resistant construction and labels | Construction note and item h (arc-resistant Type 1 or Type 2 with a B or C suffix tested to IEEE C37.20.7; the note says the selection can affect the installation design) + Arc Flash Warning Label (format as indicated; note: include the label detail on the drawings) + Service Entrance Available Fault Current Label (format as indicated; Division 1 names who performs the fault calculation) + opening note item on arc energy reduction locations + room plan and label details | If arc-resistant gear is kept, does the room design reflect the type and suffix chosen and what the manufacturer requires for that installation, are the arc flash and available fault current label details actually on the drawings, and are the arc energy reduction locations identified? |
| Enclosure, service conditions, and the pad | System Description (service conditions: fungus, altitude, temperature, frequency, ventilation, seismic, humidity, corrosive areas; seismic per UFC 3-310-04 and Sections 13 48 73 and 26 05 48 or as indicated; note: not for Navy projects) + corrosion note (ESC per UFC 1-200-01; stainless steel or galvanized bases and enclosures by ESC) + Enclosure (indoor and outdoor NEMA ICS 6 types, vault handles, sloping roof, infrared viewing windows) + Heaters + Exterior and Interior Location slab brackets (“unless otherwise indicated”) + site plan, pad and slab details | Does the plan say whether each lineup is indoor or outdoor and does the enclosure bracket match, is the site’s environmental severity class carried into the enclosure and base material, is the pad or housekeeping slab detailed or will the section’s default slab govern, and are seismic anchorage details shown where the project requires them? |
| Control power and protective relays | Circuit Breakers (control voltage bracket: DC, AC, an external source, or an integral fused control transformer; capacitor trip with AC control power) + two bracketed paragraphs both titled Control Power Supply (control power transformer in a draw-out compartment; dedicated battery system with rack, ground-fault detector, and charger) + Protective Relays (IEEE C37.90; device functions 51/50 and 51/50N or others; note: show each relay system on the one-line) + Request for Settings or Required Settings + control diagrams and one-line | Do the control diagrams show one control power source, does the room plan locate the battery rack and charger where the battery paragraph is kept, does every relay on the one-line carry a device function the relay paragraph specifies, and does Division 1 name who furnishes the final settings? |
| Metering, instrument transformers, and the utility | Instruments, Instrument Control Switches, Electronic Watthour Meter (refers to Section 26 27 14.00 20 or 26 27 13.10 30 and then specifies a meter in full) and its CT selection note, Electro-mechanical Watthour Meters, Digital Metering, Submetering (ASHRAE 90.1) + Auxiliary Sections (utility metering compartment that complies with utility company or base utility requirements; metering section or hinged panel) + Instrument Transformers (CT positions on bus and cable side; drawout potential transformers with primary fuses) + one-line and metering diagram | Does the one-line show each CT and potential transformer with its ratio and the relays and meters it serves, is a utility metering compartment shown where the utility or base requires one, and has the specifier kept either the reference to the metering section or the full meter paragraph, not both? |
| Cables, grounding, tests, and submittals | Cable Terminations (IEEE 48 Class 1; cold-shrink or heat-shrink kits) + opening note item on cable type, size, and entry + Grounding (resistance bracket; rods and connections per Section 33 71 02; equipment grounding conductor below grade) + Grounding Resistor bracket (finish colour matched to “the associated transformer”; a transformer neutral cable) + Design Tests and installation (IEEE C37.20.2A, an amendment, and IEEE C37.20.3, metal-enclosed interrupter switchgear, “as applicable”) + acceptance tests under NETA ATS and Section 26 08 00 + Product Data and Switchgear Drawings (curves for “the main secondary breaker and largest secondary feeder device”) | Does the grounding plan show the ground rods and the connection to the switchgear ground bus, do cable entry and termination type agree with the duct bank plan, does the one-line show which transformer a kept grounding resistor serves, and will the product data name the medium-voltage breakers and relays whose curves the settings depend on? |
Worked example: a central plant lineup with arc-resistant gear and a battery
Illustrative example: a new central utility plant receives two medium-voltage feeders into a double-ended metal-clad switchgear lineup indoors. The issued Section 26 13 13 keeps arc-resistant construction, remote racking, the future expansion bracket, the battery Control Power Supply paragraph, and the utility metering compartment. The room plan places the lineup against a back wall with no rear aisle, shows no battery rack or charger, and has no space at the end of the lineup for added sections. The one-line labels the relays only as “multifunction relay” without device functions, the control diagrams show control power from a fused control transformer, the arc flash and available fault current label details are missing, and the grounding plan does not show the connection to the switchgear ground bus.
Ask the electrical engineer to move the lineup off the wall or confirm a front-and-rear accessible product is not required, add the battery rack and charger to the room plan or keep the control transformer paragraph and delete the battery one, and either shorten the future expansion bracket or enlarge the room. Ask the engineer to add device functions to every relay on the one-line, add the two label details, and show the ground bus connection on the grounding plan. Ask the specifier to resolve the IEEE C37.20.2A and C37.13 citations and the duplicate meter wording before the switchgear submittal is reviewed.
Avoid a false conflict
Section 26 13 13 covers medium-voltage metal-clad switchgear and its relays, meters, control power, and acceptance tests. Low-voltage switchgear follows Section 26 23 00, switchboards follow Section 26 24 13, pad-mounted transformers follow Section 26 12 19, duct banks, cable, and ground rods follow Section 33 71 02, interior distribution follows Section 26 20 00, testing follows Section 26 08 00, the study follows Section 26 05 73, and metering follows the metering section the project uses, while NFPA 70, IEEE C2, and the codes the project follows govern working space, labelling, and service equipment, so check those before calling a requirement missing. Some of the section’s own wording needs resolving: it cites IEEE C37.20.2A, an amendment on control and secondary circuits, without the base metal-clad standard in References, and also cites the metal-enclosed interrupter standard “as applicable”; the breaker ambient note cites IEEE C37.13, which References do not list; two paragraphs share the title Control Power Supply; the system grounding choice appears twice with different options; the watthour meter paragraph both refers to another section and specifies a meter; the curve submittal names “secondary” breakers; and the grounding resistor refers to an unnamed transformer. Ask the specifier which wording the project intends before treating a difference as a design conflict.
When requirements disagree, follow the project’s document-control and clarification process. Do not assume that drawings always override specifications, or the reverse. Identify the exact sources and request an authorized decision.
Close the issue across the affected documents
Record the location or tag, drawing and specification references, issue dates, observed difference, and the decision needed. Assign an owner and keep the item open until the response identifies the governing requirement. Check the revised drawings and specification references together; a response email alone may leave the issued package inconsistent.
For the overall process, use the guide to drawing and specification conflicts. Mark an inapplicable checklist row with a reason, and distinguish a verified correction from a question that still needs design information.
Where Groundbook fits
Groundbook’s drawing and specification review helps investigate potential disagreements in the documents you supply. Include the relevant specification sections and drawing references, then verify the cited evidence with the responsible reviewers before acting on a finding.