Start with the opening notes of the issued Section 09 66 13: confirm that the finish plans show every terrazzo area and its color plate, that the structural slab is recessed for the full bonded system, and that the slab is not one where movement calls for a sand-cushion installation the section does not cover. Then check that the strip layout shows divider strips, control joint strips over every slab joint, and edging at each change of floor finish, that the strip material and color agree with the finish schedule, and that the kept recycled content, finishing, and sample paragraphs leave no gap in what gets built and approved.
Assemble the review package
Gather the floor finish plans and the finish schedule with terrazzo colors, any terrazzo pattern or strip layout plans, the structural slab plans and sections with depressions and slab joints, the floor elevation and threshold details at changes of floor finish, the door schedule for doorway transitions, any stair, base, or wall details that show terrazzo, and the issued Section 09 66 13 with Sections 09 06 00, 03 30 00, 07 92 00, and 01 33 00. Follow one terrazzo area from the finish plan down through the slab recess, the joints below it, and its edges before assuming the others match.
WBDG publishes UFGS 09 66 13: Portland Cement Terrazzo Flooring as a public guide-specification reference (accessed November 16, 2026). Use your project’s issued specification and amendments for the actual comparison; the guide specification does not automatically govern your project. The checklist below is an original suggested review workflow, not a reproduction of the UFGS requirements.
Eight checks to run against the issued set
Use one record per location or system. The CSV contains the same eight prompts plus fields for source revisions, observed evidence, the review owner, the decision, and closure references.
| Check | Sources to compare | Question to resolve |
|---|---|---|
| What the drawings must show | Opening note (areas to receive terrazzo shown on the drawings; color by a plate number) + Divider Strips note (show material, thickness, and plastic strip color on the drawings where they vary by location) + Installation (submit drawings of strip type, size, and layout and floor area colors; SD-02 Installation with a “G”) + Setting Divider Strips (layout indicated; a default grid of uniform panels where divisions are not shown) + floor finish plans and finish schedule | Does every terrazzo area on the finish plan carry a color plate and a strip layout, or will the default field grid decide the pattern, and where strip material, thickness, or color changes between rooms, do the drawings say so, as the note asks? |
| Bonded system, slab recess, and scope | Opening note (bonded terrazzo as an underbed plus topping; sand-cushion installation where structural movement may injure the terrazzo; a separate section for sand-cushion, bases, precast, structural, abrasive, rustic, venetian, or metal-form terrazzo) + Underbed proportions (spread below finished floor; a metric underbed thickness that differs from the note’s) + Underbed Placement (no curing agent or additive on the subfloor that would prevent bonding) + structural slab depressions + Section 03 30 00 curing | Is the structural slab depressed by the full bonded system depth wherever terrazzo meets another finish at the same level, is the slab one the structural engineer expects to move, which would need the sand-cushion method this section does not cover, does Section 03 30 00 avoid a curing compound on the terrazzo areas, and are terrazzo bases, stairs, or precast pieces on the drawings covered by another section? |
| Divider strips | Divider Strips (NTMA Info Guide; a fixed depth; gauge blank; brass, zinc, or plastic in a color from Section 09 06 00; standard one-piece strips by Brown & Sharpe gauge with a metric thickness that does not correspond to that gauge; heavy-top strip brackets) and note (review manufacturer’s literature; show varying material, thickness, and color) + Setting Divider Strips + finish schedule | Has the specifier filled the gauge blank and chosen one strip material, does the finish schedule or Section 09 06 00 give the plastic strip color, is the standard strip thickness stated in one unit that matches the gauge, and do heavy-top strips appear where the drawings expect them? |
| Control joints, expansion joints, and edges | Control Joint Strips (depth, gauge, and neoprene filler thickness blank; brass or zinc; filler color) + Underbed Placement (control joint strips over subfloor expansion joints, full depth of the underbed) + Setting Divider Strips (edging strips at doorways and at edges against other floor finishes; expansion strips over control, construction, and expansion joints; neither strip specified in Part 2) + slab joint plan + Section 07 92 00 | Does a control joint strip sit over every slab joint on the structural plans, including construction joints, has the specifier said which product the edging and expansion strips are, since Part 2 specifies only divider and control joint strips, and do the doorway and threshold details show the edge the section asks for? |
| Color, aggregate, and recycled content | Opening note (color plate from an NTMA “Terrazzo Design/Technical Data” publication and a “Terrazzo Color Palette”, neither listed in References) + Portland Cement, Marble Chips, and Colorants (match the NTMA Info Guide color plate indicated, bracketed to Section 09 06 00) + Marble Chips (domestic origin; ASTM C241/C241M abrasion) + bracketed System Materials (fly ash or 100 percent recycled aggregate; the Change 2 ban on coral, dolomite, and limestone aggregate in the setting bed inside the same bracket; no fly ash standard in References) | Does each terrazzo color point to a plate in the publication References actually list, if the recycled content paragraph is deleted has the specifier moved the setting bed aggregate ban somewhere that survives, and if it is kept, how does a recycled aggregate option sit with a Marble Chips paragraph that requires domestic marble, and which standard governs fly ash? |
| Grinding, grouting, and finish | Finishing (bracketed NTMA Info Guide option or a bracketed grinding procedure with an exposed aggregate share, conformance to approved samples, and a finished topping thickness) + Rough Grinding (wet method; floor flatness tolerance), Grouting (matching cement and pigment; cure), and Fine Grinding (remove grout; exposed chip share; terrazzo samples) all unbracketed + floor elevation and threshold details | Which Finishing bracket has the specifier kept, and has the repeated procedure in the three unbracketed subparagraphs been reconciled with it, and does the flatness tolerance suit the thresholds, floor drains, and adjacent finishes the drawings show? |
| Curing, cleaning, sealing, and indoor air quality | Curing Material (liquid membrane, wet sand, polyethylene sheeting, or water; ASTM C309; ASTM C171; CDPH Section 01350 or SCAQMD Rule 1113; SD-03 “S”) + Sheet Materials (repeats ASTM C171) + Curing (moist, no traffic) + Terrazzo Cleaner + Sealer (penetrating, non-yellowing, slip resistant; flash point by NTMA; pH bracket for NAVFAC Southwest only; SD-03 “S”) + Cleaning and Sealing (SD-10) + Environmental Requirements + Protection | Does the schedule keep the terrazzo areas free of traffic through curing and protected until other trades finish, is the sealer pH bracket kept only on a NAVFAC Southwest project, and does the slip resistance the sealer must give agree with any floor finish slip criteria on the finish schedule? |
| Samples, approvals, and warranty | SD-04 Samples (terrazzo flooring, divider strips, control joint strips, colorants; none with a “G”) + Fine Grinding (terrazzo samples of each color requested there) + Divider Strips and Control Joint Strips (strip samples requested in Part 2) + Finishing (conform to approved samples) + SD-02 Installation “G” + Warranty (manufacturer’s standard guarantees or warranties) | If the finished floor must match approved samples, has the specifier given the terrazzo sample a “G” or another approval path, moved the sample request out of Fine Grinding so it is made before the floor is placed, and asked for a field mockup if the color plate alone will not settle the appearance? |
Worked example: a lobby and corridor terrazzo floor over a slab with construction joints
Illustrative example: an administration building schedules portland cement terrazzo in the main lobby and the ground-floor corridors in two colors, with zinc divider strips and a border along the corridor walls. The issued Section 09 66 13 deletes the recycled content paragraph, keeps both Finishing brackets, leaves the divider strip gauge blank, and does not add a “G” to the samples. The structural plan shows a slab depression only in the lobby, the corridor slab is flush with the adjacent carpeted offices, the slab joint plan shows construction joints across the corridors, the finish plan shows no strip layout in the corridors, and the door details at the offices show no edge at the change from terrazzo to carpet.
Ask the structural engineer to extend the depression to the corridors or the architect to raise the corridor floor and detail the transitions. Ask the specifier to restore the setting bed aggregate ban outside the deleted recycled content paragraph, to keep one Finishing bracket, to fill the strip gauge, to name the edging and expansion strip products, and to give the terrazzo samples an approval path. Ask the architect to show the corridor strip layout with control joint strips over the slab construction joints and an edging strip at each office door.
Avoid a false conflict
Section 09 66 13 covers bonded portland cement terrazzo on a concrete subfloor. Sand-cushion terrazzo, terrazzo bases, stairs, precast pieces, and specialty terrazzo need their own sections, epoxy and polyester terrazzo follow Section 09 66 23 and the resinous terrazzo guide, terrazzo tile follows Section 09 66 16, the concrete slab, its depressions, joints, and curing follow Section 03 30 00 and the concrete guide, sealants follow Section 07 92 00, and colors can follow Section 09 06 00 and the finish schedule checklist, so check those before calling a requirement missing. Some of the section’s own wording needs resolving: the setting bed aggregate ban sits inside an optional paragraph, the recycled aggregate option sits beside a domestic marble requirement and the fly ash option has no standard, the opening note names a color publication References do not list, edging and expansion strips are placed but never specified, the standard strip thickness and its gauge do not correspond, the Finishing brackets repeat unbracketed subparagraphs, the terrazzo sample request sits in Fine Grinding without a “G”, and the opening note and Underbed proportions give different metric underbed thicknesses. Ask the specifier which wording the project intends before treating a difference as a design conflict.
When requirements disagree, follow the project’s document-control and clarification process. Do not assume that drawings always override specifications, or the reverse. Identify the exact sources and request an authorized decision.
Close the issue across the affected documents
Record the location or tag, drawing and specification references, issue dates, observed difference, and the decision needed. Assign an owner and keep the item open until the response identifies the governing requirement. Check the revised drawings and specification references together; a response email alone may leave the issued package inconsistent.
For the overall process, use the guide to drawing and specification conflicts. Mark an inapplicable checklist row with a reason, and distinguish a verified correction from a question that still needs design information.
Where Groundbook fits
Groundbook’s drawing and specification review helps investigate potential disagreements in the documents you supply. Include the relevant specification sections and drawing references, then verify the cited evidence with the responsible reviewers before acting on a finding.