Start with the opening and Summary notes of the issued Section 09 66 23: confirm that each terrazzo area on the finish plan has a binder suited to the chemicals and temperatures in that room, that none sits on lightweight concrete or replaces quarry tile in a kitchen, and that conductive terrazzo is kept wherever the room’s operations need it and deleted, with its test, everywhere else. Then check that the topping thickness, chip size, and color plate agree, that cove bases, strip layouts, and joints are shown, and that conductive rooms have the strip material, grounding, and testing the section and the project’s safety criteria call for.
Assemble the review package
Gather the floor finish plans and the finish schedule with terrazzo colors and base types, the room data sheets or the list of operations and chemicals for each room, the structural slab plans with the concrete type and slab joints, the wall base and threshold details, the electrical drawings for rooms with conductive floors, the explosives safety or hazard analysis for those rooms, and the issued Section 09 66 23 with Sections 09 06 00, 03 30 00, 07 92 00, 09 30 10, and 01 33 00. Follow one terrazzo area from its room use to its binder, thickness, base, strips, and test before assuming the others match.
WBDG publishes UFGS 09 66 23: Resinous Matrix Terrazzo Flooring as a public guide-specification reference (accessed November 16, 2026). Use your project’s issued specification and amendments for the actual comparison; the guide specification does not automatically govern your project. The checklist below is an original suggested review workflow, not a reproduction of the UFGS requirements.
Eight checks to run against the issued set
Use one record per location or system. The CSV contains the same eight prompts plus fields for source revisions, observed evidence, the review owner, the decision, and closure references.
| Check | Sources to compare | Question to resolve |
|---|---|---|
| What the drawings must show | Opening note (areas to receive terrazzo shown on the drawings; color by an NTMA plate from a “Terrazzo Information Guide” or “NTMA terrazzo catalog”, while References list the Terrazzo Reference Guide) + Summary (colors indicated; areas shown on the detail drawings) + Divider Strips note (strip locations shown, at logical stops and expansion joints) + Strips (contractor drawings of strip type, size, and layout; SD-02 Strips and Control Joint Strips with a “G”) + SD-02 Detail Drawings with a “G” and no paragraph defining them + finish plans | Does every resinous terrazzo area on the finish plan carry a color plate from the publication References list, a strip layout, and its base type, and has the specifier said what the separately listed Detail Drawings submittal must show beyond the strip layout? |
| Epoxy, polyester, or conductive for each room | Summary (epoxy or polyester to NTMA Info Guide paragraphs 2.01; conductive epoxy to 2.01 with an added paragraph; conductive polyester to paragraphs numbered 2.10) + opening note (choose by exposure: polyester where detergents are used but not where strong alkalis spill; epoxy not where oxidizing acids or high temperatures occur; latex mastic and resin emulsions not for strong acids or alkalis) + room data sheets or chemical lists | Has the specifier kept one binder, or a choice the project can live with in every room, does any room on the room data sheets handle the alkalis, oxidizing acids, or hot spills the note warns about, and is the conductive polyester reference a mistyped 2.01? |
| Where a thin-set resinous floor may go | Opening note (may replace portland cement terrazzo where light weight helps; not over lightweight concrete; not in place of quarry tile in kitchens; hard-wear, clean, decorative areas when economically justified) + Preparation of Concrete Subfloor (a substrate cure period before topping; preparation by the resin manufacturer; no moisture test named) + structural slab concrete type + kitchen finish schedule + Section 09 30 10 | Is any resinous terrazzo area on a lightweight concrete slab or a kitchen floor the note gives to quarry tile, does the schedule allow the substrate cure period before topping, and has the specifier asked for the slab moisture testing the resin manufacturer will require? |
| Conductive floors and resistance testing | Summary note (conductive floors where electrostatically sensitive explosives, loose ammunition with electric primers, exposed electro-explosive devices, electrically initiated items, or static-ignitable materials are present) + Divider Strips note (plastic strips with conductive terrazzo; both strip paragraphs still offer brass and zinc) + Testing (unbracketed; a test window after installation; resistance limits by the room’s service voltage; NFPA 99 cited by a hyphenated paragraph number in an older numbering style while References list the 2024 edition; certificates and certified test reports) + SD-06 Certified Test Reports “G” + SD-07 (installer qualifications only) + electrical drawings + explosives safety criteria | Which rooms need conductive terrazzo under the project’s explosives safety criteria, does the finish plan mark them, are their strips plastic, do the electrical drawings give the service voltage the resistance limits depend on, does the test method cited still exist in the NFPA 99 edition listed or should the project’s explosives safety criteria govern, is the certificate submittal listed, and is Testing deleted if no floor is conductive? |
| Topping thickness, chip size, and cove bases | Marble Chips (domestic; size ranges tied to each topping thickness; color plate on the drawings or in Section 09 06 00) + Mixing, Proportioning, and Installation note (topping thickness set by the chip size in the selected plate, named “NTMA-01”; delete the base sentence if no resinous bases) + Mixing, Proportioning, and Installation (bracketed topping thickness; cast-in-place cove base with bracketed heights) + finish schedule base types + wall base and threshold details | Does the bracketed topping thickness match the chip sizes in the color plate the finish schedule names, do the base details show the cove radius and the height the specifier kept, are cove bases deleted where the schedule gives another base, and do thresholds account for a thin-set floor beside thicker finishes? |
| Divider and control joint strips | Divider Strips (as deep as required; gauge blank; brass, zinc, or plastic in a color from Section 09 06 00) + Control Joint Strips (as deep as required; gauge blank; brass, zinc, or plastic; neoprene filler thickness blank with a mixed unit) + Mixing, Proportioning, and Installation (install strips in locations indicated) + slab joint plan + Section 07 92 00 | Has the specifier filled the gauges and the filler thickness, does a control joint strip sit over every slab joint on the structural plans, and do the strip colors and materials on the finish schedule agree with the section and with the conductive floor note? |
| Primer, resin, grout, sealer, and indoor air quality | Primer (resin manufacturer’s, monolithic bond) + Resin (NTMA Info Guide; mixing and installation instructions) + Fillers + Grout (resin manufacturer’s; CDPH Section 01350 or SCAQMD Rule 1168) + Sealer (penetrating, non-yellowing, slip resistant; flash point by ASTM D56; CDPH Section 01350 or SCAQMD Rule 1113) + Marble Chips recycled content bracket + SD-03 “S” items | Are primer, resin, and grout from one manufacturer’s system, does the slip resistance the sealer must give agree with any floor slip criteria on the finish schedule, and if the recycled content bracket is kept, is the recycled chip supply domestic as the Marble Chips paragraph requires? |
| Installer, samples, cleaning, and protection | Quality Assurance (resin manufacturer’s approval and an experience record, unbracketed; SD-07 “G”) + Summary (samples of each terrazzo color and each strip type; SD-04 lists only the terrazzo samples, without a “G”) + Delivery, Storage, and Handling and Environmental Requirements (temperature ranges before and after installation) + Cleaning and Sealing (removes “cement smears” from a resin floor; maintenance literature under SD-03) + Protection | Does the installer requirement suit the size of the project, are the strip samples listed and the terrazzo samples given an approval path, does the schedule hold the conditioned temperatures the section requires around installation, and has the cleaning wording been edited for a resin floor? |
Worked example: an ammunition maintenance shop with conductive epoxy terrazzo and a break room
Illustrative example: an ammunition maintenance facility schedules conductive epoxy terrazzo in two work bays and standard epoxy terrazzo in the corridor and a break room with a kitchenette. The issued Section 09 66 23 keeps both the epoxy and polyester brackets, keeps brass divider strips, leaves the Testing paragraph as written, and keeps the cove base sentence. The finish plan does not mark which bays are conductive, the electrical drawings show two service voltages in the bays without saying which floor areas they serve, the structural notes call for lightweight concrete on the second-floor break room, and the base schedule shows rubber base in the corridor.
Ask the architect to mark the conductive floor areas and to move the break room off resinous terrazzo or onto a normal-weight slab, as the note directs. Ask the specifier to keep one binder for the work bays, to change the strips to plastic in the conductive bays, to confirm the test method against the project’s explosives safety criteria and the NFPA 99 edition listed, to list the conformance certificates, and to delete the cove base sentence where the schedule gives rubber base. Ask the electrical engineer to show the service voltage for each conductive bay.
Avoid a false conflict
Section 09 66 23 covers thin-set epoxy and polyester terrazzo, conductive or not. Portland cement terrazzo follows Section 09 66 13 and the portland cement terrazzo guide, terrazzo tile follows Section 09 66 16, chemical-resistant resinous flooring without a terrazzo finish follows Section 09 67 23.14, quarry tile follows Section 09 30 10 and the ceramic tile guide, the slab follows Section 03 30 00 and the concrete guide, sealants follow Section 07 92 00, and DoD explosives safety criteria and the electrical design govern conductive floors and grounding, so check those before calling a requirement missing. Some of the section’s own wording needs resolving: the conductive polyester option cites a different NTMA paragraph number from every other option, the notes name color publications References do not list, the conductive note asks for plastic strips the strip paragraphs do not require, Testing cites NFPA 99 by an older paragraph number and is not bracketed for the conductive option, the certificates Testing asks for are not listed, the Detail Drawings submittal is undefined, strip samples are asked for but not listed, and cleaning removes cement smears from a resin floor. Ask the specifier which wording the project intends before treating a difference as a design conflict.
When requirements disagree, follow the project’s document-control and clarification process. Do not assume that drawings always override specifications, or the reverse. Identify the exact sources and request an authorized decision.
Close the issue across the affected documents
Record the location or tag, drawing and specification references, issue dates, observed difference, and the decision needed. Assign an owner and keep the item open until the response identifies the governing requirement. Check the revised drawings and specification references together; a response email alone may leave the issued package inconsistent.
For the overall process, use the guide to drawing and specification conflicts. Mark an inapplicable checklist row with a reason, and distinguish a verified correction from a question that still needs design information.
Where Groundbook fits
Groundbook’s drawing and specification review helps investigate potential disagreements in the documents you supply. Include the relevant specification sections and drawing references, then verify the cited evidence with the responsible reviewers before acting on a finding.