Guide · Specifications and drawings · 31 21 13

Check radon mitigation specifications against the floor plans, vent riser routes, roof penetrations, and enclosure details

UFGS Section 31 21 13 Radon Mitigation, a NAVFAC-prepared guide specification last revised in November 2018, covers radon mitigation systems built into existing buildings and, by its opening note, new ones: active soil depressurization and other methods using PVC suction points and vent piping, in-line fans, discharge points, system failure monitors, and gypsum board enclosures that conceal the piping in occupied spaces. It also sets worker protection, radon exposure records, and a respiratory protection program, contractor and testing laboratory credentials under NRPP, NRSB, or state licensure, building descriptions, suction and pressure field extension measurements after activation, an inspection by a qualified mitigation professional, and short-term and long-term post-mitigation radon testing with redesign until results meet the target the specifier selects.

Start with the Contract Documents definition and the installation paragraphs of the issued Section 31 21 13: they rely on approved design drawings for each building, so confirm that the drawings show every suction point, vent route, fan, discharge point, failure annunciator, power source, and enclosure, or that the section clearly makes the contractor responsible for that design and asks for it as a submittal. Then check that the building descriptions match the existing plans and roof, that the route and penetration restrictions agree with the drawings, and that the post-mitigation testing, redesign, and payment paragraphs can actually be administered.

Assemble the review package

Gather the floor plans for each building with room uses, the slab, foundation, and crawl space sections, the roof plan and exterior elevations, the reflected ceiling plans showing suspended ceilings, any pre-mitigation radon results and sub-slab diagnostic data, the mitigation drawings with suction points, vent risers, fans, discharge points, annunciators, and enclosures, the electrical drawings for the fan circuits, the historic preservation review if the building is listed, and the issued Section 31 21 13 with Sections 01 35 26, 01 20 00, 01 78 23, 07 84 00, and 09 29 00 and 09 90 00 where the project specifies renovation work separately. Follow one suction point from the slab penetration through the riser, fan, and roof discharge to its annunciator and circuit before assuming the others match.

WBDG publishes UFGS 31 21 13: Radon Mitigation as a public guide-specification reference (accessed November 17, 2026). Use your project’s issued specification and amendments for the actual comparison; the guide specification does not automatically govern your project. The checklist below is an original suggested review workflow, not a reproduction of the UFGS requirements.

Eight checks to run against the issued set

Use one record per location or system. The CSV contains the same eight prompts plus fields for source revisions, observed evidence, the review owner, the decision, and closure references.

Eight specification-to-drawing checksSwipe or scroll sideways to read all columns.
CheckSources to compareQuestion to resolve
Who designs the system and what the drawings showContract Documents definition (diagnostic testing, design, construction, and monitoring; this specification and the drawings listed in it) + Installation and Enclosures Installation (as indicated in the approved design drawings) + Short Term and Long Term testing (modifications reflected in the “Contractor’s design documents (drawings and design narrative)”) + Submittals (no item for design drawings, a narrative, or diagnostic results) + mitigation drawingsDo the drawings show the suction points, vent routes, fans, discharge points, annunciators, and enclosures for each building, or, if the contractor designs the systems, does the section add a submittal for the design drawings, narrative, and diagnostic results that the installation paragraphs call approved and the test paragraphs expect to be updated?
New construction or existing buildingOpening note (new buildings, existing buildings, and enclosures) + new construction note (EPA radon zones; passive systems in the original design with provisions for later fans; a separate new-construction section “seems unnecessary” because materials sit in “Division 02 and Division 15”, retired division numbers) + Summary and Performance Requirements (target concentration bracket; unit of measure note) + Building Descriptions + slab and foundation sectionsFor new construction, are the sub-slab aggregate, soil-gas retarder, suction pipe, riser, and fan provision drawn and specified in the current earthwork, membrane, and plumbing or mechanical sections the note means, and for an existing building, does the section describe the actual buildings and use the unit of measure suited to the location?
Building descriptions and route restrictionsBuilding Descriptions note (construction of floors and walls in contact with soil, slab and aggregate thickness, number of floors, roof type and covering, suspended ceilings, occupancy during work, penetration restrictions, items embedded in the slab, routing restrictions) + sample paragraph + Furnishings brackets + historic property note + floor plans, roof plan, and elevationsDoes each building description agree with the plans, sections, and roof plan, are the roof and elevation restrictions also drawn so riser routes respect them, are embedded conduits, grounding grids, or reinforcement in the slab identified before suction holes are cored, and is the historic preservation review complete where the building is listed?
Suction points, piping, and dischargeSystem Piping (route clear of operations; enclose in occupied spaces; listed unoccupied spaces and a blank; no enclosure above suspended ceilings) + Components (PVC DWV pipe; in-line fans; sealants; crawl space soil-gas retarder thickness in mils only; mock downspout bracket) + System Outlet Location (ANSI/AARST SGM-MFLB and EPA 402-R-93-078; rain cap bracket for freezing climates) + Back Drafting + Mechanical Work (ICC IMC, SMACNA 1378) + floor and roof plansDo the plans show each riser’s route and its discharge point relative to roof openings, air intakes, and windows as the cited standards require, is the rain cap bracket kept or deleted for the climate, does every riser in an occupied space have an enclosure, has the specifier added a metric value to the crawl space membrane bracket, and are chimneys and fuel-burning appliances near each system identified for the back drafting requirement?
Fans, power, failure monitor, and labelsElectrical Work (NFPA 70; wire in EMT or surface metal raceway; power source distance that “should” be available and the length carried in the bid, both bracketed) + System Failure Warning Monitor (blockage, fan failure, and leakage; annunciator in an occupied space) + System Identification (labels on piping, enclosures, fans, conduit, and breakers; Public Works Office phone; NAVFAC note covering only “or as specified by the Contracting Officer”) + electrical plans and panel schedulesDo the electrical drawings show a circuit and a nearby power source for each fan, consistent with the length carried in the bid, does each system have an annunciator located in an occupied space, are the label wording and phone number filled in, and does the NAVFAC bracket around the label wording do what its note intends?
Enclosures and adjoining workRadon Mitigation Systems Enclosures (first bracket with concrete, stud, gypsum board, sealant, paint, and hardware standards; second bracket pointing to the project’s own renovation sections) + gloss note + Enclosures Installation + Radon Mitigation System Inspection (verifies “the presence of fire stops”, which no paragraph specifies) + wall and ceiling details, finish schedule, and fire-rated assembly plansIs one enclosure bracket kept to match whether the project has its own gypsum board and painting sections, do the details show enclosure framing, board, and finish matching adjacent surfaces, and where a riser passes a rated floor, wall, or roof, does the section or Section 07 84 00 specify the firestopping that the inspection checks for?
Worker protection and qualificationsWorker Health and Safety (29 CFR 1910.1096; OPNAV M-5090.1 and EM 385-1-1 brackets; protection plan contents; exposure records; medical certification; notification) + Respiratory Protection Program (fit testing; NIOSH-approved respirators; selection by the “Contractor’s Designated IH”, a role never defined) + Contractor Qualifications and Experience (NRPP, NRSB, or state credential; state listing bracket; experience brackets) + Testing Laboratory + On-Site Supervision + Preconstruction Conference (Section 01 35 26)Has the specifier defined the Designated IH with a qualification and a submittal, chosen the OPNAV or EM 385-1-1 bracket for the agency, filled the state listing bracket where the state licenses mitigation contractors, and set experience brackets that suit the systems on the drawings?
Activation measurements, testing, and paymentPost Mitigation Functional Evaluation (suction and PFE measurements for ASD systems; airflow and pressure for other methods; no paragraph for the pre-mitigation diagnostic testing the definitions and Diagnostic Testing Equipment describe) + Radon Detector Location Log (EPA 402-R-92-014 Device Placement Log) + Short Term and Long Term testing (detector placement, timing, and laboratory reporting; redesign and retest; collection by the Contractor or the Contracting Officer bracket) + payment item citing a paragraph “POST MITIGATION TESTING - SCHEDULE OF PRICES DATA” that does not exist + unit price noteDoes the bid schedule carry the unit price items the note asks for, has the specifier replaced the payment reference with the actual bid item, is pre-mitigation diagnostic testing specified if the contractor designs the systems, and do the floor plans used for the detector log show every enclosed space the testing paragraphs count?

Worked example: sub-slab depressurization for an existing administration building

Illustrative example: an existing two-story administration building on a slab with a partial crawl space tested above the installation’s radon action level, and the project adds sub-slab depressurization. The issued Section 31 21 13 keeps both enclosure brackets, the rain cap prohibition, the crawl space membrane bracket, and the long-term payment item that cites a missing schedule of prices paragraph. The drawings show three suction points on the first floor plan but no riser routes, no fan or annunciator locations, and no roof discharge; the building description says roof penetrations are not permitted while a roof plan note calls for a vent through the roof; and no submittal asks the contractor for design drawings.

Ask the designer to decide whether the drawings or the contractor will lay out the systems, and to either draw the risers, fans, annunciators, and discharge points or add a design submittal with diagnostic testing. Ask the specifier to reconcile the roof penetration restriction with the vent route, to keep one enclosure bracket, to add a metric value to the crawl space membrane bracket, and to tie the long-term payment to a real bid item. Ask the facility’s safety office who serves as the Designated IH before the preconstruction conference.

Avoid a false conflict

Section 31 21 13 covers radon mitigation systems, their enclosures, worker protection, and post-mitigation testing. Firestopping follows Section 07 84 00, gypsum board and painting follow Sections 09 29 00 and 09 90 00 where the project has them, safety follows Section 01 35 26 and EM 385-1-1, bid items follow Section 01 20 00 or the activity’s instructions to bidders, and the adopted building and mechanical codes, any state radon licensing law, ANSI/AARST SGM-MFLB and MA-MFLB, and the EPA protocols govern the work, so check those before calling a requirement missing. Some of the section’s own wording needs resolving: the payment item cites a schedule of prices paragraph that is not in the section, the new construction note uses retired division numbers and doubts that a new-construction section is needed, the Designated IH is never defined, the definitions and test paragraphs point to diagnostic testing and contractor design documents that no paragraph or submittal covers, the crawl space membrane is in mils only, and the inspection checks fire stops that nothing specifies. Ask the specifier which wording the project intends before treating a difference as a design conflict.

When requirements disagree, follow the project’s document-control and clarification process. Do not assume that drawings always override specifications, or the reverse. Identify the exact sources and request an authorized decision.

Close the issue across the affected documents

Record the location or tag, drawing and specification references, issue dates, observed difference, and the decision needed. Assign an owner and keep the item open until the response identifies the governing requirement. Check the revised drawings and specification references together; a response email alone may leave the issued package inconsistent.

For the overall process, use the guide to drawing and specification conflicts. Mark an inapplicable checklist row with a reason, and distinguish a verified correction from a question that still needs design information.

Where Groundbook fits

Groundbook’s drawing and specification review helps investigate potential disagreements in the documents you supply. Include the relevant specification sections and drawing references, then verify the cited evidence with the responsible reviewers before acting on a finding.

Questions, answered

FAQs

What should a radon mitigation specification review compare?

Compare who designs the system and what the drawings show, whether the work is new construction or an existing building, the building descriptions and route restrictions, suction points, piping, and discharge, fans, power, failure monitors, and labels, enclosures and adjoining work, worker protection and qualifications, and activation measurements, testing, and payment.

Does UFGS 31 21 13 apply to new buildings?

The current UFGS 31 21 13 Radon Mitigation on WBDG says it covers radon mitigation systems in new and existing buildings, but its new construction note says passive systems should be built into the original design and that a separate new-construction section seems unnecessary because the materials are specified elsewhere and the installation is shown on the drawings. Most of its Part 1 to Part 3 text is written for mitigating existing buildings. UFGS numbers are DoD guide specification numbers, not universal MasterFormat titles, and your project’s issued specification governs.

How is this different from the radon rules in state building codes?

Some state codes, such as Maine’s and Nebraska’s, require radon-resistant construction in certain new buildings, and the code pages cover that permit check. UFGS 31 21 13 is a contract specification for building and testing mitigation systems on DoD projects: it sets the components, enclosures, labels, worker protection, credentials, and the post-mitigation test and redesign cycle. On one project, check that any code requirement, the drawings, and the section describe the same system.

Can Groundbook check radon mitigation drawings against Section 31 21 13?

Groundbook compares the drawing set with the specification sections and reference documents you upload, such as your issued Section 31 21 13, Sections 07 84 00 and 09 29 00, the ANSI/AARST standards you hold, and the EPA protocols, and returns potential conflicts with links to the source pages. It has no built-in code library and does not design mitigation systems, measure or calculate radon levels or pressure field extension, certify compliance, or approve submittals or test results. Each finding is a question for the qualified mitigation professional, the designer, the specifier, or the contracting officer.

Bring your next set into focus

Set up a review or talk through your project with our team.

Check your radon mitigation layout against the spec

Trusted by hundreds of professionals