Guide · Specifications and drawings · 31 62 16.16

Check steel H-pile specifications against pile plans, schedules, and cap details

UFGS Section 31 62 16.16 Steel H-Piles, a NAVFAC-prepared guide specification issued in November 2020 with Change 2 in February 2024, covers furnishing, driving, and testing steel H-piles that the contractor designs from the loads the drawings give. Alongside the basis of bid, wave equation, test pile, load test, and monitoring articles it shares with the other driven pile sections, it adds what is particular to steel: the steel grade and its corrosion notes, concrete encasement, pile points and tip reinforcement, welded splices, steel pile caps and tension anchors, impact and vibratory hammers, weld inspection and testing, and touchup painting. Its opening note lists what the drawings must show: the location, size, and cutoff elevation of the project piles, the location, size, cutoff elevation, and identification of test piles, the subsurface soil data logs, and the staging area.

Start with the opening drawing note of the issued Section 31 62 16.16: confirm that the pile plan and schedule give each pile’s location, H-section, and cutoff elevation, that test piles are identified, and that the boring logs and staging area appear in the set. Then check that the steel grade, corrosion protection, pile points, splice and weld requirements, steel cap plates or tension anchors, tolerances, hammer energy, and test program kept in the section agree with the pile cap details, the structural notes, and the geotechnical report, and that the coating and welding requirements the section refers out exist in sections the project actually issues.

Assemble the review package

Gather the foundation or pile plan with pile marks and test piles, the pile schedule with H-section, steel grade, capacities, tip and cutoff elevations, and batter, the pile tip, point, splice, and encasement details, the pile cap plan, schedule, and details showing the pile head, any steel cap plate or tension anchor, and its embedment, the structural general notes with design loads, bending moments, lateral loads, and uplift, the geotechnical report with boring logs, the refusal stratum, groundwater, and corrosivity results, the site plan with the staging area, any waterfront elevations with the mudline and tide levels, the statement of special inspections, any coating schedule for the piles, and the issued Section 31 62 16.16 with Sections 31 00 00, 03 30 00, 01 45 35, the welding section the project uses, and the coating section. Follow one pile from its schedule line through its tip and splice to its cap before assuming the others match.

WBDG publishes UFGS 31 62 16.16: Steel H-Piles as a public guide-specification reference (accessed November 7, 2026). Use your project’s issued specification and amendments for the actual comparison; the guide specification does not automatically govern your project. The checklist below is an original suggested review workflow, not a reproduction of the UFGS requirements.

Eight checks to run against the issued set

Use one record per location or system. The CSV contains the same eight prompts plus fields for source revisions, observed evidence, the review owner, the decision, and closure references.

Eight specification-to-drawing checksSwipe or scroll sideways to read all columns.
CheckSources to compareQuestion to resolve
Pile plan, schedule, and test pilesOpening drawing note (location, size, and cutoff elevation of project piles; location, size, cutoff elevation, and identification of test piles; soil data logs; staging area) + PART 1 structural engineer note + Description article + H-Piles article (shape and sections shown) + foundation plan, pile schedule, and structural general notesDoes every pile mark resolve to an H-section, steel grade, cutoff elevation, capacity, and tip elevation or penetration, are test piles identified with their own size and cutoff elevation, as the note requires, are the boring logs and the staging area in the set, and do the general notes or schedule give the bending moments, lateral loads, and other design requirements the PART 1 note says the structural engineer must provide, since the Description article has the contractor design, furnish, install, and test the piles?
Steel grade and corrosion protectionMaterials and H-Piles articles and their notes (strength, cost, and corrosion; splash zone steels; coatings, cathodic protection, and concrete encasement; encasement below the mudline or coated) + concrete encasement option and Pile Encasements shop drawing + Touchup Painting article + geotechnical corrosivity data + pile elevations with mudline and tide levelsIs one steel grade kept and does it match the schedule, where the report or site shows seawater, a splash zone, or corrosive soil, do the drawings show which protection the design uses and its limits, coating extent, encasement top and bottom, or cathodic protection, does a section the project issues specify that coating, since the Touchup Painting article reuses the paint “as specified” but the section has no coating article of its own, and where encasement sits in continuously submerged low-resistivity water, does it extend below the mudline or carry the insulating coating the note requires?
Pile points and tip reinforcementPile Points article and note + H-Piles article tip options (square and blunt mill tips, tip reinforcements, or cast steel points) + Pile Reinforcing Tips or Steel Points shop drawing + Pile Driving Shoes and Points payment item + boring logs and pile tip detailWhere the logs show dense sand or gravel, cobbles and boulders, or a hard layer or bedrock the piles are driven to refusal on, the conditions the note names, is a point or tip reinforcement kept rather than mill tips, is one option chosen, cast steel points or plate tip reinforcement, with a detail showing its type, and does the section say whether points go on all piles or only on those indicated?
Splices, welding, and weld testingPile Splices material and fabrication articles and notes + Splicing Piles article and note + Welding article (AWS D1.1/D1.1M, Section 05 50 14) + Welding Inspection and Weld Testing articles + Procedure for Insufficient Pile Length submittal + splice detail + statement of special inspections and Section 01 45 35Is splicing excluded where one-piece lengths are available or the pile is designed for a moment connection, as the splice note advises, and where it stays, is the splice detail on the structural drawings, since the splicing note still points to PCI standard drawings, which detail concrete piles, is the field splice frequency blank filled in, does the project issue Section 05 50 14, which the Welding article names and whose note describes custom civil works fabrications, or has the article been edited to the welding section the project uses, is the weld testing share filled in, and does the statement of special inspections list the splice welds?
Steel cap plates, tension anchors, and cap embedmentPile Caps and Pile Tension Anchors articles + attachment article (attach as shown; grind pile tops for structural-shape caps) + Fabrication article’s Division 05 references + concrete pile cap plan, schedule, and details + uplift loads in the general notesSince the section’s Pile Caps article means a steel plate or structural shape on the pile head, not the concrete pile cap, do the concrete cap details show which head condition applies, plain embedment, a steel cap plate, tension anchors, or welded bars, with the cutoff elevation and embedment for each pile type, are tension anchors detailed wherever the schedule has uplift, are unused cap, point, anchor, and shoe paragraphs deleted, and are the Fabrication article’s bracketed references to miscellaneous metal, ladder, railing, and stair sections edited to the one that applies?
Placement tolerances, cutoff, and as-driven surveyPile Placement and Tolerances in Driving article + Survey Data article + Pile Butt Location and Elevation article + Installation article (cutoff grade; excavation, sheeting, and dewatering before driving to a cutoff below grade) + pile cap plan and details + Section 31 00 00Do the cap dimensions leave the clear distance from pile head to cap edge the tolerance article requires for a pile at the limit of its lateral tolerance, do the cutoff elevations on the schedule agree with the cap bottoms and embedment within the article’s vertical tolerance, has the structural engineer seen that the article puts any cap redesign for mislocated piles on the contractor, where a cutoff sits below grade or the mudline, are the excavation, sheeting, and dewatering the Installation article requires shown or specified, and does the schedule hold cap work until the survey is reviewed and the pile group’s safe load verified?
Hammers, leads, jetting, and driving criteriaPile Driving Hammers note (minimum hammer energy by design capacity) + Impact Hammers and Vibratory Hammers articles + Pile Driving Leads note + Jetting Equipment note + Wave Equation Analysis of Pile Drivability article + Order List, Lengths of Production Piles, and Pile Penetration Criteria articles + Production Pile Acceptance Criteria + pile scheduleIs the minimum hammer energy bracket filled in to match the scheduled design capacity, from the note’s table or from wave equation analyses, are vibratory hammers kept only where the pile tests will confirm them, are fixed leads required where the drawings need accurate placement, since the leads note rules out suspended leads there, is jetting kept off piles carrying significant tension, lateral, or skin friction loads, as the jetting note directs, does the order list follow the pile lengths at each plan location, and does the safe design capacity blank match the schedule?
Test piles, load tests, records, and adjacent workTest Piles article and note + Dynamic Pile Analysis, CAPWAP, Static Load Tests, Tensile Load Test, and Lateral Load Test articles + Pile Load Test Frame shop drawing + Heaved Piles and Obstructions articles + Protection of Existing Structures, Vibration Control, Noise Control, Preconstruction Condition Survey, and Instrumentation articles + Section 31 00 00 Pile Cap Excavation article + boring plan and site planAre test piles located on the plans or tied to boring numbers, as the test pile note asks, where the schedule carries tension or lateral piles, are tensile or lateral load tests kept, with their number and the anchor pile choice decided, are heave observations planned where piles sit in clusters, do the drawings show the structures and facilities to be protected, with the project-specific document issued, and do this section’s excavation option and the Pile Cap Excavation article of Section 31 00 00 keep the same sequence?

Worked example: mill tips over a cobble layer and a coating no section specifies

Illustrative example: a new small-boat maintenance shop on a waterfront site is supported on steel H-piles driven through hydraulic fill and soft clay to weathered rock, with concrete pile caps and grade beams. The boring logs record cobbles and boulders in the fill and refusal on the rock, but the issued Section 31 62 16.16 keeps square and blunt mill tips and no point detail exists. The pile schedule names a corrosion-resistant grade while the section keeps a different one, the pile elevation notes a coating over the upper length of the piles that no issued section specifies, the section keeps “Make splices as indicated” with no splice detail, and its Welding article still names Section 05 50 14, which the project does not issue. A two-pile cap at a column next to the property line leaves almost no edge distance beyond the piles.

Ask the structural engineer to keep one steel grade in the section and the schedule, to choose cast steel points or tip reinforcement and add the detail, since the logs show the cobble and rock conditions the pile point note describes, and to add the splice detail or keep “Splicing of piles is not permitted” if one-piece lengths are available. Ask the specifier to point the Welding article to the welding section the project issues and to specify the coating system and its limits in a section the touchup article can rely on. Ask the structural engineer to show the pile head in the cap, plain embedment, a cap plate, or tension anchors, with its embedment, to delete the unused steel cap and anchor paragraphs, and to widen the two-pile cap or move the piles so the clear distance to the cap edge survives the placement tolerance.

Avoid a false conflict

Section 31 62 16.16 covers steel H-piles, their points, splices, steel cap plates, and tension anchors, and their driving and testing. Its Pile Caps article means steel plates or structural shapes on the pile head: the concrete pile cap, grade beams, and any concrete encasement follow Section 03 30 00 and the concrete guide, excavation and backfill follow Section 31 00 00, splice welding follows AWS D1.1 through the section the Welding article names (Section 05 50 14 in the guide text, whose note frames it for custom civil works fabrications; Sections 05 05 23.16 Structural Welding and 05 12 00 Structural Steel are also Active), and the coating system belongs to whichever section the project uses for it, since this section carries only touchup painting; check those before calling a requirement missing. Steel pipe piles, with their seam testing, cutting shoes, concrete infill, and fusion-bonded epoxy option, are UFGS 31 62 16.13, concrete-filled steel piles are 31 62 23.13, and precast prestressed concrete piles, which can carry H-pile extensions as composite piles, are 31 62 13.20 and the precast concrete pile guide, all Active on WBDG. Pile capacity, driving stresses, hammer selection, terminal driving criteria, and load test interpretation are decisions for the structural and geotechnical engineers and the contractor’s geotechnical consultant. Its Safe Design Capacity paragraph points to UFC 3-220-01, listed as the digital version while the legacy WBDG record still shows the 2012 edition with Change 3 of July 2025; confirm the version your task order invokes. The current guide section cites AWS D1.1, SSPC PA 1, ASTM A36, A148, A572, A588, A690, D1143, D3689, D3966, D4945, E94, E164, E165, E329, and E709; confirm the editions your project invokes.

When requirements disagree, follow the project’s document-control and clarification process. Do not assume that drawings always override specifications, or the reverse. Identify the exact sources and request an authorized decision.

Close the issue across the affected documents

Record the location or tag, drawing and specification references, issue dates, observed difference, and the decision needed. Assign an owner and keep the item open until the response identifies the governing requirement. Check the revised drawings and specification references together; a response email alone may leave the issued package inconsistent.

For the overall process, use the guide to drawing and specification conflicts. Mark an inapplicable checklist row with a reason, and distinguish a verified correction from a question that still needs design information.

Where Groundbook fits

Groundbook’s drawing and specification review helps investigate potential disagreements in the documents you supply. Include the relevant specification sections and drawing references, then verify the cited evidence with the responsible reviewers before acting on a finding.

Questions, answered

FAQs

What should a steel H-pile specification review compare?

Compare the pile plan, schedule, and test piles, the steel grade and corrosion protection, pile points and tip reinforcement, splices, welding, and weld testing, steel cap plates, tension anchors, and cap embedment, placement tolerances, cutoff, and the as-driven survey, hammers, leads, jetting, and driving criteria, and test piles, load tests, records, and adjacent work.

When does UFGS 31 62 16.16 call for pile points?

Its pile point note says points may be required when piles are driven in dense sand, gravel, or cobble and boulder zones, or to refusal on a hard layer or bedrock. The section offers cast steel points or plate tip reinforcements as bracketed options beside square and blunt mill tips and asks for points of the type or details shown, so the tip detail on the drawings has to match the option kept. UFGS numbers are DoD guide specification numbers, not universal MasterFormat titles, and your project’s issued specification governs.

Does UFGS 31 62 16.16 specify the coating on steel H-piles?

Not by itself. The current section has a Touchup Painting article that repairs field welds, splices, and abraded areas with the same paint and number of coats “as specified”, and its material notes discuss coatings, cathodic protection, and concrete encasement for seawater exposure, but it has no article that names the coating system or its limits. Check that the drawings show the protected length and that another issued section, or an edited paragraph in this one, specifies the coating.

How is this different from the precast concrete pile and steel pipe pile sections?

The precast concrete pile guide follows UFGS 31 62 13.20, where strands, concrete exposure, cover, build-ups, and dowels into the cap are the drawing questions. UFGS 31 62 16.16 is for H-sections, where the steel grade, corrosion protection, pile points, welded splices, and steel cap plates and tension anchors are. Steel pipe piles follow UFGS 31 62 16.13, which adds pipe seam testing, open or closed cutting shoes, concrete infill, and a fusion-bonded epoxy option, so check which section your project issued for each pile type on the schedule.

Can Groundbook check H-pile drawings against Section 31 62 16.16?

Groundbook compares the drawing set with the reference documents you upload, such as your issued Section 31 62 16.16, the geotechnical report, the related earthwork, concrete, welding, and coating sections, and licensed codes or standards you hold, and links each potential disagreement to both sources. It has no built-in code library and does not calculate pile capacity, driving stresses, hammer energy, or wave equation results, interpret load tests, certify compliance, or design the piles. Each finding is a question for the structural engineer, the geotechnical engineer, or the contracting officer.

Keep exploring

Continue your review

Check precast prestressed concrete pile specifications against pile plans, schedules, and cap details

Compare pile schedule, strand pattern, splices, build-ups, cutoff and cap embedment, test piles, driving criteria, and tolerances with UFGS 31 62 13.20.

Explore

Check structural steel specifications against drawings

Trace steel grades, connections, coatings, delegated-design references, and inspections across specifications and drawings with an editable checklist.

Explore

AWS D1.1 structural welding review: weld symbols, joint details, and inspection callouts

Review structural steel weld symbols, joint details, and inspection notes against AWS D1.1/D1.1M:2025, the steel spec, and AISC 360. Checks and AI limits.

Explore

Check earthwork specifications against drawings

Compare fill classification, subgrade compaction, trench backfill, and finish grading across the civil drawings and earthwork specification.

Explore

Check concrete specifications against drawings

Compare concrete mix references, slab finishes, joints, embeds, and curing requirements across specifications and drawings. Includes an editable checklist.

Explore

UFC 3-220-01 Geotechnical Engineering review: from the geotechnical report to the foundation drawings

Check DoD foundation drawings against the reissued UFC 3-220-01 and the geotechnical report: investigation, liquefaction, groundwater, and foundations.

Explore

Check special inspection specifications against the drawings

Compare the statement and schedule of special inspections, seismic systems, inspector qualifications, and fabricator shops with UFGS 01 45 35.

Explore

Structural drawing review checklist

Review structural notes, framing plans, schedules, details, and support interfaces with a practical checklist, worked example, and free editable CSV.

Explore

Pile cap and flat slab reinforcement

A structural review of a pile-supported concrete building finds foundation beams with no bars, columns off their pile caps and punching links in thin slabs.

Explore

Drawings vs. specifications

Compare drawing requirements with specifications, schedules, and controls. Find potential equipment, material, and scope inconsistencies with Groundbook AI.

Explore

Bring your next set into focus

Set up a review or talk through your project with our team.

Check your H-pile plan and cap details against Section 31 62 16.16

Trusted by hundreds of professionals