Guide · Specifications and drawings · 27 05 26

Check telecommunications grounding and bonding specifications against T-drawings, riser diagrams, and rack details

UFGS Section 27 05 26 Grounding and Bonding for Communications Systems, a USACE-prepared guide specification first issued in November 2025, covers the building telecommunications bonding infrastructure and its connection to the electrical grounding system. It defines the primary and secondary bonding busbars, the telecommunications bonding conductor and backbone, backbone bonding conductors, equipment, rack, and unit bonding conductors, and the T3, T4, and T6 telecommunications drawings, then specifies conductor and busbar products, exothermic and compression connections, mesh and mesh-isolated bonding networks, labels, installation of each conductor and busbar, cabinet, rack, and cable tray bonding, tower and antenna grounding, identification, and inspection and testing. It works with Sections 26 20 00, 27 10 00, and 33 82 00 and with UFC 3-580-01.

Start with the bonding products note and the T6 definition of the issued Section 27 05 26: the drawings must show bonding components and conductor sizes, and a grounding riser diagram, so confirm that every busbar, conductor, and connection the kept paragraphs require has a location and size on the plans and riser. Then check that the PBB sits in the entrance facility near its panelboard and apart from the electrical service ground, that each telecommunications room has its SBB and backbone, that racks are bonded by an allowed method, and that the resistance brackets match the facility’s criticality.

Assemble the review package

Gather the T3 telecommunications room plans and elevations, the T4 typical details for bonding and labeling, the T6 grounding riser diagram, the electrical grounding plan and one-line diagram with the service ground and the panelboards serving each telecommunications room, the structural steel drawings, any access floor or computer room plans, the tower or antenna site plan and roof plan, the lightning protection drawings, the electronic security and DAS head-end locations, and the issued Section 27 05 26 with Sections 26 20 00, 27 10 00, 33 82 00, 26 41 00, 07 84 00, and UFC 3-580-01. Follow one bonding path from the electrical service ground through the PBB, backbone, and SBB to a rack and its equipment before assuming the others match.

WBDG publishes UFGS 27 05 26: Grounding and Bonding for Communications Systems as a public guide-specification reference (accessed November 16, 2026). Use your project’s issued specification and amendments for the actual comparison; the guide specification does not automatically govern your project. The checklist below is an original suggested review workflow, not a reproduction of the UFGS requirements.

Eight checks to run against the issued set

Use one record per location or system. The CSV contains the same eight prompts plus fields for source revisions, observed evidence, the review owner, the decision, and closure references.

Eight specification-to-drawing checksSwipe or scroll sideways to read all columns.
CheckSources to compareQuestion to resolve
What the drawings must showBonding Products note (indicate bonding components and conductor sizes on drawings) + T3, T4, and T6 drawing definitions (room plans and elevations with bonding layout; typical bonding and labeling details; grounding riser diagrams) + Record Documentation (T3, T4, and T6 with grounding riser) + Identification note (labeling scheme detailed in the design drawings) + Busbar location note + T-drawings and electrical grounding planDoes the design set include a T6 grounding riser that shows the TBC, TBB, BBC, SBCs, and every PBB and SBB with conductor sizes, do the T3 room plans locate each busbar and its panelboard, and does a T4 detail give the labeling scheme the Telecommunications Manager must approve, rather than leaving all of it to the contractor’s record drawings?
PBB, TBC, and the electrical service groundPrimary Bonding Busbar (in the entrance facility, near the panelboard serving it; mounting height bracket; separate from the electrical service ground busbar) + Bonds to the PBB (panelboard ACEG, primary protector, OSP cable shields, structural metal, metallic pathways, cable tray, TBC to the service ground under NFPA 70 Section 250.94, TEBC, ESS equipment) + TBC paragraph (two sizing brackets) + Qualifications note (licensed electrician for the ACEG bond) + Examination (ground resistance bracket) + electrical grounding planIs the PBB drawn in the entrance facility beside its panelboard and shown as a separate busbar from the service grounding busbar, does the electrical grounding plan show the TBC route to an accessible service grounding connection, has one TBC sizing bracket been chosen, and does the ground resistance bracket match the facility’s criticality and the electrical section’s requirement?
Backbone, SBBs, and the exemption notesTBB, BBC, and SBC paragraphs and sizing table note + TBB and BBC exemption notes (single PBB “or” continuous structural steel “and” an ACEG bus in the room) + Secondary Bonding Busbar (one in every other telecommunications space; “Mount the PBB” height bracket) + Bonds to the SBB + BBC installation (between TBBs on the top floor and intermediate floors; heading “Bonding Backbone Conductor”) + structural drawings and riserHas the designer decided, with the conditions read as all required or any one, whether the TBB or BBC can be omitted in favour of continuous structural steel, is a continuity test of that steel specified and scheduled, does each SBB on the riser have a TBB or SBC, and has the specifier changed the SBB paragraph so its mounting height applies to the SBB rather than the PBB?
Conductor sizes, routing, and connectionsBonding Conductors (ASTM B1 and B8; two-hole compression lugs) + sizing brackets for TBC, TBB, BBC, ACEG, structural metal (insulation brackets per Section 26 20 00 and pathway fire rating) + lightning note (“choose the second bracketed options” without naming them) + installation (no ferrous conduit unless NFPA 70 requires, bonded at both ends if used; one fixed conduit trade size outside telecommunications spaces; stacking bracket; bend radius; splices only in telecommunications spaces) + Firestopping (Section 07 84 00) + riser and plansDo the conductor sizes on the riser follow the sizing rule kept for each conductor, is the bracket choice for lightning-protected buildings identified and made, will the single conduit size the section fixes outside telecommunications spaces hold the largest backbone conductor shown, are stacked lugs allowed only on renovations, and are penetrations of rated walls by bonding conductors firestopped?
Racks, cabinets, and equipmentTEBC (continuous; separate per rack or shared to the farthest RBB bracket; separation from other cables and ferrous material) + RBC and RBB paragraphs and Figure 8 notes (ANSI/TIA-607 Example A not allowed; Examples B or C only) + UBC (manufacturer bonding points; size bracket) + Cabinets and Racks (no serial bonding; door and panel jumpers; bolted rack bonding hardware) + Telecommunications Cabling (OSP sheath, backbone shields, secondary protector brackets) + T3 rack elevations and T4 detailsDoes the T4 rack bonding detail show Example B or C rather than the excluded Example A, has the specifier chosen one TEBC arrangement, does every rack and cabinet have its own conductor to the RBB, TEBC, PBB, or SBB, and are cable shields bonded where the cables enter or break out as the kept cabling brackets require?
Mesh bonding networks and computer roomsMesh-BN and Mesh-IBN notes (equipotential plane; grid spacing and frequency guidance with metric and inch-pound values that disagree; IEEE Std 142 not in References; mesh-IBN for restricted areas such as computer rooms; mesh-IBN access floor note says mesh-BN) + Access Floor, Wire Mesh, and Grid Tape paragraphs (grid tape metric thickness that does not match the inch-pound value) + mesh installation (multiple bonds to the PBB or SBB for mesh-BN; a single bond for mesh-IBN) + access floor and computer room plansIs a mesh-BN or mesh-IBN kept only where the computer room or equipment room needs one, do the plans show its extent, spacing, and pedestal bonding, does the riser show the mesh-IBN tied to the bonding system at a single point and a mesh-BN at several, and has the specifier corrected the spacing and tape thickness conversions before the contractor relies on them?
Towers, antennas, and lightning protectionTowers and Antennas note and paragraph (ATIS 0600334; ANSI/TIA-607 Annex B) + Ring Electrode (two burial depths, unclear which applies to the electrode and which to the conductors; bond tower base, dish frame, nearby fences, and the PBB or SBB) + Roof-Mounted Towers (roof ring with NFPA 780 conductors; connect to the lightning protection perimeter conductors) + Waveguides and Coaxial Cable (entry and interior shield bonds; surge arrester) + site plan, roof plan, and lightning protection drawingsDo the site and roof plans show the ring electrode, the fence bonds, the conductor to the equipment room busbar, and the cable entry plate for every tower or antenna, does the lightning protection drawing show the roof ring tied to its perimeter conductors, and has the specifier stated which burial depth applies to the ring and which to the bonding conductors?
Qualifications, labels, and bonding testsQualifications (licensed electrician for the ACEG bond; BICSI installers; two different minimum counts of prior installations in one paragraph) + Examination item c (“report of prior installations” used for a site conditions report) + Labels and Identification (ANSI/TIA-606; brass “DO NOT DISCONNECT” tags; yellow busbar labels with no product paragraph) + Inspection + Grounding and Bonding System Test (structural steel continuity, fall-of-potential ground test, two-point bonding resistance, ground loop current, stray DC voltage) + Cable Tray Jumper note and Cable Tray Connections (resistance limits that differ from each other and from the system test)Has the specifier made the prior-installation counts and the examination report name consistent, chosen one resistance limit that every cable tray joint and bonding segment can be tested against, kept the resistance brackets that match the facility’s criticality, and added a label product that delivers the yellow busbar labels the identification article requires?

Worked example: a three-story operations building with a computer room and a rooftop antenna

Illustrative example: a three-story operations building has an entrance facility on the first floor, a telecommunications room on each floor, a computer room with an access floor, and a rooftop antenna mast. The issued Section 27 05 26 keeps the TBB, BBC, mesh-IBN, and tower paragraphs, both TBC sizing brackets, and the stacked-conductor allowance. The T6 riser shows the PBB and SBBs without conductor sizes, the electrical grounding plan shows the PBB bolted to the service grounding busbar, the T4 rack detail shows racks daisy-chained to one TEBC with no rack busbars, and the roof plan shows the mast without a roof ring or a bond to the lightning protection system.

Ask the telecommunications designer to add conductor sizes to the riser, to show the PBB as a separate busbar with a TBC to the service ground, and to redraw the rack detail with an RBB in each rack using an allowed bonding method. Ask the specifier to choose one TBC sizing bracket, to delete the stacking allowance for new construction, to correct the SBB mounting sentence, and to resolve the cable tray and system test resistance limits. Ask the electrical and lightning designers to add the roof ring and its connection to the lightning protection perimeter conductors.

Avoid a false conflict

Section 27 05 26 covers the telecommunications bonding infrastructure from the TBC to rack-mounted equipment. Power grounding follows Section 26 20 00 and the interior distribution guide, lightning protection follows Section 26 41 00 and its guide, cabling and pathways follow Section 27 10 00 and the structured cabling guide, outside plant follows Section 33 82 00, firestopping follows Section 07 84 00, and NFPA 70, NFPA 780, ANSI/TIA-607, and UFC 3-580-01 govern the design, so check those before calling a requirement missing. Some of the section’s own wording needs resolving: the SBB paragraph sets the PBB mounting height, EMI is defined as electromagnetic impulse, the cable tray and system test resistance limits differ, the mesh spacing and grid tape conversions do not agree, IEEE Std 142, a later ANSI/TIA-607 edition, and the Defense Health Agency manual are cited without being listed, the prior-installation counts and report names conflict, the BBC heading reverses its name, the exemption notes mix “or” and “and”, and the ring electrode depths are ambiguous. Ask the specifier which wording the project intends before treating a difference as a design conflict.

When requirements disagree, follow the project’s document-control and clarification process. Do not assume that drawings always override specifications, or the reverse. Identify the exact sources and request an authorized decision.

Close the issue across the affected documents

Record the location or tag, drawing and specification references, issue dates, observed difference, and the decision needed. Assign an owner and keep the item open until the response identifies the governing requirement. Check the revised drawings and specification references together; a response email alone may leave the issued package inconsistent.

For the overall process, use the guide to drawing and specification conflicts. Mark an inapplicable checklist row with a reason, and distinguish a verified correction from a question that still needs design information.

Where Groundbook fits

Groundbook’s drawing and specification review helps investigate potential disagreements in the documents you supply. Include the relevant specification sections and drawing references, then verify the cited evidence with the responsible reviewers before acting on a finding.

Questions, answered

FAQs

What should a telecommunications grounding and bonding specification review compare?

Compare what the drawings must show, the PBB, TBC, and electrical service ground, the backbone, SBBs, and exemption notes, conductor sizes, routing, and connections, racks, cabinets, and equipment, mesh bonding networks and computer rooms, towers, antennas, and lightning protection, and qualifications, labels, and bonding tests.

What drawings does UFGS 27 05 26 expect?

The current UFGS 27 05 26 Grounding and Bonding for Communications Systems on WBDG asks the designer to indicate bonding components and conductor sizes on the drawings and defines T3 room plans and elevations, T4 typical details for labeling and bonding, and T6 grounding riser diagrams, with labeling schemes detailed in the design drawings. UFGS numbers are DoD guide specification numbers, not universal MasterFormat titles, and your project’s issued specification governs.

How is this different from the structured cabling and lightning protection pages?

UFGS 27 10 00 covers the telecommunications cabling, spaces, and pathways and has one interface with grounding, and UFGS 26 41 00 covers the lightning protection system. UFGS 27 05 26 covers the bonding busbars, bonding conductors, rack and mesh bonding, tower grounding, and the bonding tests that connect telecommunications equipment to the building grounding electrode system. On one project, check that the riser, the lightning drawings, and the electrical grounding plan describe the same connections.

Can Groundbook check a grounding riser against Section 27 05 26?

Groundbook compares the drawing set with the specification sections and reference documents you upload, such as your issued Section 27 05 26, Sections 26 20 00 and 27 10 00, UFC 3-580-01, and licensed standards you hold, and returns potential conflicts with links to the source pages. It has no built-in code library and does not design bonding systems, size conductors, calculate or measure resistance, certify compliance, or approve submittals or tests. Each finding is a question for the telecommunications designer, the electrical engineer, the specifier, or the contracting officer.

Keep exploring

Continue your review

Check structured cabling specifications against drawings

Compare telecommunications room assignment, pathway sizing, labeling scheme, and distributor hierarchy across drawings and specifications.

Explore

Check lightning protection specifications against drawings

Compare system type, air terminals, down conductors, ground rods, test wells, fence bonding, and testing across roof plans and UFGS Section 26 41 00.

Explore

Check interior electrical distribution specifications against drawings

Compare panel schedules, feeders, conductors, raceways, grounding, and fire pump and emergency circuits across electrical drawings and UFGS 26 20 00.

Explore

Check access flooring specifications against drawings

Compare access flooring grid, finished floor height, and load rating by area across specifications and drawings. Includes an editable checklist.

Explore

Check electronic security system specifications against drawings

Compare intrusion detection, access control, and video surveillance subsystem assignment and door-hardware interface across specifications and drawings.

Explore

Check first responder distributed antenna system specifications against drawings

Compare emergency responder radio coverage, signal strength, power backup, and monitoring across specifications and drawings.

Explore

Check firestopping specifications against drawings

Compare penetration type, listed system selection, annular space, and fire-rated joint treatment across MEP and architectural drawings. Editable CSV included.

Explore

Electrical drawing review checklist

Review electrical one-lines, panel schedules, equipment loads, circuit references, and lighting controls. Includes a worked example and a free CSV.

Explore

Low-voltage, security, and AV review checklist

Review technology systems, pathways, head-end rooms, access control, life-safety interlocks, and AV against the electrical and hardware documents. Free CSV.

Explore

NFPA 70 National Electrical Code plan review

Review electrical drawings against NFPA 70 (NEC) across one-lines, panel schedules, equipment, rooms, and other trades. See checks and AI review limits.

Explore

UFC 3-520-01 Interior Electrical Systems review, including fire protection power

Review DoD interior electrical drawings against the reissued UFC 3-520-01: fire protection power, panel schedules, surge protection, and grounding.

Explore

Drawings vs. specifications

Compare drawing requirements with specifications, schedules, and controls. Find potential equipment, material, and scope inconsistencies with Groundbook AI.

Explore

Bring your next set into focus

Set up a review or talk through your project with our team.

Check your telecom grounding and bonding against the spec

Trusted by hundreds of professionals