Guide · Specifications and drawings · 10 26 00

Check wall and door protection specifications against floor plans, interior elevations, partition types, and the door schedule

UFGS Section 10 26 00 Wall and Door Protection, a USACE-prepared guide specification issued in August 2020, covers corner guards, wall guards (crash rails, bed locators, combination handrail and crash rails, handrails, and chair rails), door, door envelope, door knob, and door frame protectors, and rigid vinyl acrylic wall covering, high impact wall panels, and digital wall covering. It specifies the resilient material and its impact, surface burning, colour, chemical, and fungal properties, aluminum retainers and stainless steel guards, trim and anchors, finishes, adhesives and indoor air quality, and installation on gypsum board, plaster, tile, and masonry. It works with Sections 09 06 00, 09 72 00, 09 29 00, 08 11 13, 08 14 00, and 08 71 00.

Start with the opening note of the issued Section 10 26 00: the drawings must show where crash rails, corner guards, wall covering and panels, and door protectors go, with mounting and anchorage details and dimensions, so confirm that each kept product has a location on the floor plans and a mounting height on the interior elevations. Then check that partitions behind rails have backing, that guards and panels in rated walls and on rated doors keep the rating, and that door protectors and hardware sets do not duplicate or clash.

Assemble the review package

Gather the floor plans with protection tags or a protection legend, the interior elevations of corridors, patient rooms, lobbies, elevator areas, service corridors, and loading docks, the partition types and the life safety plan with rated walls, the door schedule, frame elevations, and hardware sets, the finish schedule and colour legend, the wall covering and panel layouts, the typical mounting details, and the issued Section 10 26 00 with Sections 09 06 00, 09 72 00, 09 29 00, 09 22 00, 06 10 00, 08 11 13, 08 14 00, and 08 71 00. Follow one corridor from its first outside corner to its last door before assuming the others match.

WBDG publishes UFGS 10 26 00: Wall and Door Protection as a public guide-specification reference (accessed November 17, 2026). Use your project’s issued specification and amendments for the actual comparison; the guide specification does not automatically govern your project. The checklist below is an original suggested review workflow, not a reproduction of the UFGS requirements.

Eight checks to run against the issued set

Use one record per location or system. The CSV contains the same eight prompts plus fields for source revisions, observed evidence, the review owner, the decision, and closure references.

Eight specification-to-drawing checksSwipe or scroll sideways to read all columns.
CheckSources to compareQuestion to resolve
What the drawings must showOpening drawing note (locations of crash rails and corner guards; locations of wall covering, panels, and door protectors; mounting and anchorage details and dimensions) + Standard Products (drawings show general configuration; bracket accepting items differing in minor details) + Corner Guards and Wall Guards installation (“as indicated” or on all external corners of interior walls, partitions, and columns) + floor plans, interior elevations, and typical detailsDoes each product the specifier kept appear on the plans or in a legend with its extent, does an interior elevation or typical detail give each rail’s mounting height and each guard’s height, and has the specifier chosen “as indicated” rather than the alternative that puts guards on every outside corner the plans do not tag?
Corner guards and their heightsCorner Guards medical facility note (full height) + Resilient Corner Guards (flush or surface mounted; full height or a stated height; end caps for surface mounted; flush guards stop the adjacent finish) + Stainless Steel Corner Guards (gauge bracket and abuse note; types 430 or 304 under ASTM A167) + Stainless Steel Finish (types 302 or 304 under ASTM A167) + elevations and finish scheduleDo the elevations show the same mounting type and height the bracket keeps, are corner guards full height wherever the facility is medical, do flush guards have a recess shown in the wall detail, and has the specifier replaced the ASTM A167 citations, as the WBDG history says Change 1 did, and settled one steel type for stainless guards?
Crash rails, handrails, chair rails, and bed locatorsWall Guards note (wall guards include crash rails, bed locators, handrails, chair rails; delete bed locators unless healthcare) + Crash Rails and Bed Locators, Combination Handrail and Crash Rails, Handrails, and Chair Rails (snap-on covers, retainer thickness with metric and inch-pound values that disagree, maximum anchorage spacing) + installation (a different maximum bracket spacing for wall guards) + accessibility note + corridor and patient room elevationsDo the corridor elevations show which rail type runs where and at what height, are bed locators kept only in patient rooms, is the handrail coordinated with the accessibility requirements the project follows, and has the specifier reconciled the retainer thickness conversions and the two anchorage spacings for the same rail?
Backing, blocking, and substratesWall guard anchorage (anchored to wall at a maximum spacing) + Stainless Steel Guards installation (plaster or tile: z-shape anchors wired to metal studs or bolted to concrete or masonry; glazed tile or masonry: bolts or adjustable anchors with grouted backs; gypsum board: contact adhesive; sound-deadening back coating “where shown”) + no backing or blocking article in the section + partition types and Sections 09 22 00, 09 29 00, 06 10 00Do the partition types or a typical detail show backing or blocking behind every crash rail, handrail, and combination rail run, is the substrate behind each stainless guard identified so the right anchorage bracket applies, and are the locations needing sound-deadening coating actually shown?
Fire-rated walls and surface burningFire Resistance Rating paragraph and SD-06 (titled as a rating but asking for ASTM E84 flame spread and smoke developed values and ASTM D635 self-extinguishing behaviour) + Resilient Corner Guards (flush guards in fire-rated walls maintain the wall rating; integral insulating materials; paintable exposed metal) + Wall Covering and Panels + life safety plan and partition typesDoes the life safety plan identify which walls receiving flush corner guards or panels are rated, does the detail show how the flush guard keeps that rating, does the interior finish classification required for each corridor and exit match the flame spread the section asks for, and will the SD-06 test report show surface burning results rather than an hourly rating?
Door protectors and the door scheduleDoor Protectors (door, door envelope, knob, and frame protection; resilient thickness bracket with a metric and inch-pound mismatch, or stainless steel; coordinate fit and colour with door and frame suppliers) + Fire Resistance Rating (protectors on fire-rated doors and frames listed and tested on a similar assembly) + Door Protectors installation (after frames, before doors are hung; NFPA 80 for fire doors) + door schedule, frame elevations, hardware setsDoes the door schedule or a door protection legend show which doors and frames receive protectors, are those on fire-rated openings tested on the same door and frame type, and do the hardware sets for the same doors also list protection plates, so the protector, the plate, and the hardware do not overlap or leave a gap?
Wall covering and high impact panelsWall Covering and Panels thickness note (recommended thickness by location: lobbies and elevator areas, service corridors, loading docks; composite panel over existing substrates) + panel size bracket + Rigid Vinyl Acrylic Wall Covering, High Impact Wall Panels, and Digital Wall Covering (image from Section 09 06 00 or as indicated) + Trim, Fasteners and Anchors (as indicated) + Section 09 72 00 + finish schedule and panel layoutsDo the finish schedule and elevations show each protective wall covering or panel with a height, edge trim, and the thickness chosen for that location, is each image or graphic identified where digital wall covering is kept, and does the layout match a panel size the bracket allows without an unplanned joint?
Impact rating, colour, submittals, and warrantyStandard Products impact note + Minimum Impact Resistance (Izod value stated per square inch with a metric unit that is not energy per width; alternative bracket uses ASTM F476, a door assembly security test) + Integral Color and Color (Section 09 06 00 or as indicated) + Submittals (shop drawings, product data, samples, O&M under Section 01 78 23) + indoor air quality certifications + Warranty (fixed term before the bracketed choices)Has the specifier kept one impact test and stated its value in units the manufacturer’s data will report, does the colour reference point to one source, will the shop drawings show elevations, clearances, and anchorage for each item, and has the warranty sentence been reduced to one term?

Worked example: a clinic corridor with patient rooms and a rated stair

Illustrative example: a two-story outpatient clinic has a central corridor with exam and patient rooms, a soiled utility room, an elevator lobby, and a rated exit stair. The issued Section 10 26 00 keeps resilient corner guards with the stated-height bracket, combination handrail and crash rails, bed locators, door and frame protectors, and rigid vinyl acrylic wall covering in the elevator lobby. The floor plans tag corner guards at only some outside corners while the installation paragraph keeps the “all external corners” bracket, the corridor elevations show the combination rail without a height, the partition types show no backing, the door schedule lists frame protectors on the rated stair door, and the hardware set for the same door lists an armor plate.

Ask the specifier to choose the “as indicated” installation bracket and the full-height corner guard option for the clinic, and to reconcile the rail anchorage spacing and the stainless steel references. Ask the architect to dimension the rail height on the corridor elevations, add backing to the partition types behind every rail run, and confirm that the frame protector on the stair door is tested on that door and frame type. Ask the hardware consultant and the architect to decide whether the armor plate or a door protector covers the door face, and show one.

Avoid a false conflict

Section 10 26 00 covers corner guards, wall guards, door protectors, and protective wall covering and panels. Wallcoverings and their own corner guards follow Section 09 72 00 and the wallcovering guide, gypsum board and framing follow Sections 09 29 00 and 09 22 00, wood blocking follows Section 06 10 00, doors and frames follow Sections 08 11 13 and 08 14 00, protection plates and hardware follow Section 08 71 00 and the door hardware guide, metal railings follow Section 05 52 00, and colours follow Section 09 06 00, while the building code, NFPA 80, NFPA 101, and the accessibility standard the project follows govern rated openings, interior finishes, and handrails, so check those before calling a requirement missing. Some of the section’s own wording needs resolving: ASTM A167 is still cited after the WBDG history says it was replaced, the stainless steel types differ between two paragraphs, the impact units and test choice are unclear, metric and inch-pound thicknesses disagree, rails have two anchorage spacings, the “Fire Resistance Rating” paragraph describes surface burning, and the warranty term is printed twice. Ask the specifier which wording the project intends before treating a difference as a design conflict.

When requirements disagree, follow the project’s document-control and clarification process. Do not assume that drawings always override specifications, or the reverse. Identify the exact sources and request an authorized decision.

Close the issue across the affected documents

Record the location or tag, drawing and specification references, issue dates, observed difference, and the decision needed. Assign an owner and keep the item open until the response identifies the governing requirement. Check the revised drawings and specification references together; a response email alone may leave the issued package inconsistent.

For the overall process, use the guide to drawing and specification conflicts. Mark an inapplicable checklist row with a reason, and distinguish a verified correction from a question that still needs design information.

Where Groundbook fits

Groundbook’s drawing and specification review helps investigate potential disagreements in the documents you supply. Include the relevant specification sections and drawing references, then verify the cited evidence with the responsible reviewers before acting on a finding.

Questions, answered

FAQs

What should a wall and door protection specification review compare?

Compare what the drawings must show, corner guards and their heights, crash rails, handrails, chair rails, and bed locators, backing and substrates, fire-rated walls and surface burning, door protectors and the door schedule, protective wall covering and panels, and the impact rating, colour, submittals, and warranty.

What drawings does UFGS 10 26 00 expect?

The current UFGS 10 26 00 Wall and Door Protection on WBDG says the project drawings must show the locations of crash rails and corner guards, the locations of wall covering, panels, and door protectors, and mounting and anchorage details and dimensions, with basic profiles that are not proprietary. UFGS numbers are DoD guide specification numbers, not universal MasterFormat titles, and your project’s issued specification governs.

How is this different from the wallcovering and door hardware pages?

UFGS 09 72 00 covers decorative and protective wallcoverings and includes its own corner guards and wainscot caps, which it deletes where Section 10 26 00 supplies them. UFGS 08 71 00 covers hardware sets, including any protection plates. UFGS 10 26 00 covers impact-resistant corner guards, rails, door and frame protectors, and rigid wall panels, so on one project check that the finish schedule, the hardware sets, and the protection layout assign each corner, wall run, and door face to one section.

Can Groundbook check interior elevations against Section 10 26 00?

Groundbook compares the drawing set with the specification sections and reference documents you upload, such as your issued Section 10 26 00, Sections 09 06 00, 09 72 00, and 08 71 00, the door schedule, and licensed standards you hold, and returns potential conflicts with links to the source pages. It has no built-in code library and does not design protection layouts, calculate anchorage, rate assemblies, certify compliance, or approve submittals. Each finding is a question for the architect, the interior designer, the specifier, or the contracting officer.

Bring your next set into focus

Set up a review or talk through your project with our team.

Check your corner guards, rails, and door protectors against the spec

Trusted by hundreds of professionals