We’re at NCSEA in San Francisco, Oct 28–29 · Booth 110NCSEA · Booth 110 · Oct 28–29

Guide · Specifications and drawings · 09 64 66

Check wood athletic flooring specifications against gym floor plans, slab elevations, seating, equipment anchors, and game line plans

UFGS Section 09 64 66 Wood Athletic Flooring, a NAVFAC-prepared guide specification issued in August 2016 and changed in August 2018, covers five gymnasium-type hardwood strip flooring systems on concrete slabs: flooring clipped to steel channels on fiberboard or foam underlayment, flooring nailed to rubber-cushioned wood sleepers, flooring on board subflooring over wood nailers set in hot asphalt fill, flooring on two-layer plywood subflooring on rubber pads, and steel-splined continuous flooring laid in asphalt mastic, optionally on cork. A selection guidance table compares the systems by performance, application, and relative cost. It specifies maple, beech, or birch flooring under MFMA grading rules, hardwood, molded-rubber, and steel angle vented bases, each system’s materials, preservative-treated sleepers and nailers, MFMA sealer and finish groups, and game line marking. Part 3 covers slab preparation, anchor plate assemblies for portable sports equipment, installation of each system, sanding, finishing, marking, and protection. Squash and handball court wall construction is outside its scope.

Start with the drawing note of the issued Section 09 64 66, which lists what the drawings must show: the top-of-slab elevation for the floor system, permanent or temporary seating, equipment and obstructions the flooring goes around, structural provisions for sport equipment anchor plates, the edge detail with the wall base, and the location, width, and colour of game lines. Confirm each is drawn, that one of the five systems is kept and scheduled where it goes, and that the slab depression, base type, and finish group all suit that system.

Assemble the review package

Gather the gymnasium, stage, and court floor plans, the finish schedule, the structural slab plans and sections with top-of-slab elevations and depressions, the earthwork and slab-on-grade details with any capillary break, vapor retarder, or waterproofing, the floor system and edge details with the wall base, the telescoping bleacher and seating plans, the athletic equipment plan with floor sockets and anchor plates, electrical floor boxes and under-floor conduit, the game line plan with colours and widths, the mechanical drawings for the gym, and the issued Section 09 64 66 with Sections 03 30 00, 06 10 00, 09 90 00, 09 06 00, 31 31 16.13, and the Division 11 equipment sections. Follow one floor from the slab elevation up through the kept system to the base, lines, and finish before assuming the others match.

WBDG publishes UFGS 09 64 66: Wood Athletic Flooring as a public guide-specification reference (accessed November 18, 2026). Use your project’s issued specification and amendments for the actual comparison; the guide specification does not automatically govern your project. The checklist below is an original suggested review workflow, not a reproduction of the UFGS requirements.

Eight checks to run against the issued set

Use one record per location or system. The CSV contains the same eight prompts plus fields for source revisions, observed evidence, the review owner, the decision, and closure references.

Eight specification-to-drawing checksSwipe or scroll sideways to read all columns.
CheckSources to compareQuestion to resolve
Which of the five systems, and whereOpening notes (five gymnasium-type systems; selection by the Selection Guidance Table on recommended applications, local availability, or cost) + Hardwood Strip Flooring Systems note (designer indicates the location of the selected subfloor systems on the finish schedule, the schedule at the end of the section, or the drawings) + the five bracketed systems + Installation note (select the type and delete the others) + Schedule (prints only unit conversions) + UFGS 09 64 29 + finish schedule and floor plansHas the specifier kept one system per floor and deleted the others with their materials, samples, and installation paragraphs, does the finish schedule or a floor plan tag show which system goes in each gymnasium, stage, or court, and is each wood floor assigned to this section or to Section 09 64 29, not both?
Slab elevation, depression, and moisture protectionDrawing note item 1 (elevation of top of slab) + Condition of Subfloors note (slab depressed for the system used; depressions shown on the drawings) + leveling course of latex fill and straightedge tolerance on every slab + Preparation of Concrete Slab (curing agents bracket for adhesive-set systems) + Installation note (on or above grade; below grade needs waterproofing in Division 7; porous fill and capillary water barrier under the slab “specified in Division 2”; membrane waterproofing where hydrostatic pressure is probable) + Vaporproofing for Slabs on Grade + asphalt fill note (no added vapor barrier) + steel-splined felt membrane + Section 03 30 00Does the top-of-slab elevation on the structural drawings equal finished floor less the height of the kept system, is the floor on or above grade or has waterproofing been added, does the current earthwork or concrete section actually place the capillary break the note assigns to an old Division 2, and which vapor control goes under the kept system?
Species, thickness, and finish groupStrip Flooring notes (thicker flooring for hard and frequent service and sanding; maple for hard service or major athletics, beech and birch for less critical service) + Strip Flooring (second or better grade under MFMA GRHM; thickness and face width brackets; edge-grain flooring for steel-splined systems; certified wood; IAQ bracket) + Sealing and Finishing (MFMA AFSFSCL Group II or III; two notes that put multipurpose floors in different groups) + Finishing (a Group II coat count that differs from the note) + finish schedule and room useIs hard maple kept for a gymnasium, does the thickness suit the owner’s resanding plan and the sleeper or channel spacing tied to it, and has the specifier chosen the finish group by the room’s actual use and reconciled the two finish notes and the coat counts?
System components and seatingFlooring Clipped to Steel Channels (premilled grooves, channels parallel to the short side, anchored to the slab) + Wood Sleepers with Rubber Cushions (spacing tied to flooring thickness; wood screeds between sleepers where fixed or temporary seats are indicated) + Board Subflooring, Wood Nailers, and Asphalt Fill (shimmed, anchored nailers levelled with an instrument; hot asphalt fill; diagonal boards; felt) + Plywood Subflooring with Rubber Pads (hardboard shims where seats are indicated) + Steel-Splined (felt and mastic; cork bracket) + Sleepers and Nailers (preservative treatment to AWPA C1 or C2, listed with 2003 dates) + Section 06 10 00 + bleacher and seating plansDoes the floor system detail match the kept system’s components and spacing, do the plans show where telescoping bleachers or fixed seats sit so the screeds or shims go under them, and has the specifier confirmed the preservative standard for the sleepers and nailers, given the reference dates printed in the section?
Anchor plates, floor plates, and outletsDrawing note items 3 and 4 (equipment and obstructions; structural provisions for anchor-plate assemblies) + Anchor Plate Assemblies note (specify with each equipment item in Division 11; for future equipment detail them on the drawings and specify materials in Part 2 of this section, which has no such paragraph; the floor manufacturer does not normally supply them) + Anchor Plate Assemblies (installed where indicated; flooring cut neatly) + channel clips at floor plates + SD-02 (layout of anchor plates, floor outlets, and under-floor conduit) + equipment plan, slab details, electrical floor boxesDoes every volleyball, net, or gymnastics socket on the equipment plan have an anchor plate in a Division 11 section or, for future equipment, a detail and a materials paragraph somewhere, are the structural provisions drawn in the slab, and do floor boxes and conduit runs avoid the channels, sleepers, or nailers?
Edge detail, air space, and vented baseDrawing note item 5 (edge detail with kind and size of wall base) + each system’s continuous air space at walls and obstructions + Hardwood, Molded-Rubber, and Steel Angle Base (vented; not fastened to the flooring; notes: not a standard product of any manufacturer and must be detailed on the drawings) + laying direction by system (right angles to channels, sleepers, or nailers; steel-splined parallel to the room width) + Installation note (expansion governed by local weather and the temperature and humidity maintained) + base schedule, door and threshold detailsDoes the edge detail show the perimeter air space and the one base type kept, with its vents, size, and wall fastening, are doorways and transitions to adjacent floors detailed so the air space stays open and covered, and does the floor plan show a laying direction that matches the kept system?
Game lines, sanding, and finishingDrawing note item 6 (location, width, and colour of game lines) + Sanding (coarse to fine grades; final disc sanding) + Finishing note and bracket (finish specified elsewhere in Division 9, or here with game lines laid out after burnishing and before the final coat; MFMA SSCLFMGF) + Marking (game lines, fields, and patterns where indicated; colours indicated) + Game Line Marking Materials (as recommended by the finish manufacturer) + Section 09 90 00 + game line planDoes a game line plan show every court with its line widths, colours, any logos or patterns, and which lines are continuous where courts overlap, and does this section or Section 09 90 00, but not both, own the seal, finish, and game lines?
Environment, materials, submittals, and protectionEnvironmental Conditions (fixed temperature and humidity ranges before and during installation; sanding delayed when humidity is high) + termite note (perimeter protection by Section 31 31 16.13 for new work; AWPA C2 or the manufacturer’s method for existing buildings) + Plywood Subflooring (metric sheet size that disagrees with the inch size and with the plywood installation paragraph) + SD-02, SD-04 samples, SD-08, and SD-10 + certified wood and composite wood brackets + Protection (porous building paper, then removal of “kraft paper”) + mechanical drawingsCan the gym’s permanent HVAC hold the conditions the section requires before and during installation, is termite protection assigned to Section 31 31 16.13 on new work, has the specifier corrected the plywood metric size and kept samples only for the chosen system, and does the protection paragraph name one covering?

Worked example: a gymnasium with bleachers, volleyball sockets, and two finish notes

Illustrative example: a base gymnasium has a basketball court with two cross courts, telescoping bleachers on one side, and volleyball sockets. The issued Section 09 64 66 keeps both the rubber-cushioned sleeper system and the plywood-on-pads system, both finish notes, and the plywood paragraph as printed. The finish schedule says only “wood athletic floor”, the structural drawings show one slab depression that matches neither system height, the bleacher plan is not referenced in the floor details, the equipment plan shows volleyball sockets but no Division 11 section or anchor plate detail, the base detail shows a molded-rubber base with no vents, and the game line plan gives colours but no line widths.

Ask the specifier to keep one system, delete the other with its materials and samples, choose one finish group for a sports-only floor and reconcile the coat counts, and correct the plywood metric size. Ask the structural engineer and architect to set the slab depression to the kept system height. Ask the architect to show screeds or shims under the bleachers, detail the volleyball anchor plates with their Division 11 section, show base vents, and add line widths to the game line plan.

Avoid a false conflict

Section 09 64 66 covers five wood sport-floor systems on concrete slabs, their bases, finish, and game lines. Other wood strip floors and handball and squash court floors and walls follow Section 09 64 29 and the wood strip flooring guide, resilient sport floors follow Section 09 65 66, nailers and treated wood draw on Section 06 10 00 and the rough carpentry guide, the slab follows Section 03 30 00 and the concrete guide, finishes may follow Section 09 90 00 and the painting guide, termite protection follows Section 31 31 16.13, sport equipment and its anchors follow Division 11, and the mechanical design governs humidity, so check those before calling a requirement missing. Some of the section’s own wording needs resolving: the plywood metric size is wrong, two finish notes disagree on multipurpose floors and on Group II coats, the protection paragraph names two papers, the anchor plate note points to a Part 2 paragraph that does not exist, and the porous fill is assigned to an old Division 2. Ask the specifier which wording the project intends before treating a difference as a design conflict.

When requirements disagree, follow the project’s document-control and clarification process. Do not assume that drawings always override specifications, or the reverse. Identify the exact sources and request an authorized decision.

Close the issue across the affected documents

Record the location or tag, drawing and specification references, issue dates, observed difference, and the decision needed. Assign an owner and keep the item open until the response identifies the governing requirement. Check the revised drawings and specification references together; a response email alone may leave the issued package inconsistent.

For the overall process, use the guide to drawing and specification conflicts. Mark an inapplicable checklist row with a reason, and distinguish a verified correction from a question that still needs design information.

Where Groundbook fits

Groundbook’s drawing and specification review helps investigate potential disagreements in the documents you supply. Include the relevant specification sections and drawing references, then verify the cited evidence with the responsible reviewers before acting on a finding.

Questions, answered

FAQs

What should a wood athletic flooring specification review compare?

Compare which of the five systems is kept and where, slab elevation, depression, and moisture protection, species, thickness, and finish group, system components and seating, anchor plates and floor outlets, the edge detail, air space, and vented base, game lines, sanding, and finishing, and environment, materials, submittals, and protection.

What does UFGS 09 64 66 say the drawings must show?

The current UFGS 09 64 66 Wood Athletic Flooring on WBDG asks the drawings to show the elevation of the top of the slab under the floor system, permanent or temporary seats, equipment and other permanent obstructions, structural provisions for sport equipment anchor plates, the edge detail with the kind and size of wall base, and the location, width, and colour of game lines. UFGS numbers are DoD guide specification numbers, not universal MasterFormat titles, and your project’s issued specification governs.

How is this different from the wood strip and plank flooring page?

UFGS 09 64 29 covers wood strip and plank flooring in general, with species and grading, humidity control, sleeper or channel floors, and handball and squash court floors and walls. UFGS 09 64 66 covers five named gymnasium floor systems chosen from a selection table, with equipment anchor plates, seating supports, vented bases that must be detailed, MFMA finish groups, and game line marking, and leaves court walls out. On one project, check that each wood floor is keyed to one of the two sections.

Can Groundbook check a gymnasium floor against Section 09 64 66?

Groundbook compares the drawing set with the specification sections and reference documents you upload, such as your issued Section 09 64 66, Sections 03 30 00, 06 10 00, and 09 90 00, the equipment and bleacher plans, the flooring manufacturer’s data, and licensed standards you hold, and returns potential conflicts with links to the source pages. It has no built-in code library and does not select floor systems, calculate slab depressions or expansion, design equipment anchors, certify compliance, or approve submittals. Each finding is a question for the architect, the specifier, the structural engineer, or the contracting officer.

Bring your next set into focus

Set up a review or talk through your project with our team.

Check your gym floor system, anchors, and game lines against the spec

Trusted by hundreds of professionals