Construction documents · Kansas

AI plan review in Kansas

For a Kansas project in State Fire Marshal scope, use the code footprint as the organizing reference. Review whether the plans and schedules support that stated analysis, then reconcile any local review conditions.

Your codes, connected to your drawings

Bring your own code PDFs

Groundbook can review your drawings against the state and local code PDFs you upload. Add the adopted code books and amendments that apply to your project, then review potential issues with links to the supporting sources.

  1. Add your references

    Upload the applicable code PDFs alongside the drawing set. Include the edition, local amendments, and project requirements.

  2. Choose each file’s role

    Set code PDFs to Code and Use as reference. Mark the drawings you want reviewed as Check this file.

  3. Review the findings

    Follow the linked drawing and reference, check applicability, and have the responsible professional verify the issue.

How to use local code references
Groundbook project files with four California Title 24 code PDFs set to Code and Use as reference, and a drawing set marked Check this file.
California code PDFs shown as an example. Upload the references that apply to your project.Try with your code PDFs

State and local references

Code references for Kansas

Examples of references you can bring into Groundbook. Confirm the adopted edition, effective date, and project scope with the reviewing authority, then upload the applicable PDFs.

Code names link to official agency or publisher resources. Reviewed September 9, 2026. The reference set comes from the files you supply.

Kansas reference guide

Establish who reviews what

Check code-footprint applicability

The Kansas State Fire Marshal requires a code footprint for specified building categories involving new construction, renovation, or occupancy changes. Check the listed categories rather than assuming every private project follows this route.

Kansas State Fire Marshal: code footprints

Identify coordinated review authority

The same guidance describes coordination with local fire and building officials through memorandums of understanding. Confirm who receives the plans and which local permit requirements remain applicable.

Kansas State Fire Marshal: code footprints

Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.

Prepare a useful review

What to bring for Kansas

Use this preparation list for Groundbook alongside the official permit checklist.

The project’s code footprint

Supply the current footprint, building and occupancy data, code references, and any approval or review comments.

Plans supporting the analysis

Include egress and rated-assembly drawings, door and hardware schedules, fire-protection scope, and site-access plans. Ask reviewers to compare them with the footprint.

State and local checklist

Bring the applicable KSFM guidance and local checklist. Identify separate system submissions and which reviewer owns each decision.

A current drawing register

Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.

Use the drawing-register template

Before you start

Kansas plan review FAQs

What should Groundbook check against a Kansas code footprint?

Ask it to compare the supplied footprint with the drawings and schedules: occupancy and area data, exits, rated construction, and related system scope. Qualified reviewers must verify the analysis and decide whether the footprint applies to the project.

Which documents should I supply for a Kansas AI plan review?

Supply the current drawing set and schedules, relevant specifications and reports, the applicable code and amendment PDFs, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. Groundbook reviews the supplied evidence; do not assume every local requirement is already available.

Does Groundbook approve a permit or certify compliance?

No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.

Official source directory

Keep the reference trail

Browse all states and San Francisco

Review the set before you submit

Bring your drawings and the references that govern the project.

Product screenshot