Guide · Specifications and drawings · 31 62 13.13

Check cast-in-place concrete pile specifications for driven steel casings against pile schedules and cap details

UFGS Section 31 62 13.13 Cast-In-Place Concrete Piles, a NAVFAC-prepared guide specification issued in April 2006, when it replaced UFGS-02459 without change, and last changed in February 2024 (Change 3), covers procuring, driving, and testing steel casings that stay in the ground and are filled with concrete. Its casings can be structural steel pipe driven open-end or closed-end, or light-gage closed-end shells that its casing note says must be driven on a mandrel and serve only as a form, in uniform taper, step-taper, constant section, or combination shapes. It is far shorter than the 2020 driven pile sections: the Government, not a contractor’s geotechnical consultant, sets the calculated tip elevations and driving resistances from test pile data; there is no wave equation, dynamic testing, as-driven survey, special inspection, or vibration article; and concrete and reinforcing are sent to Section 03 30 00. Its opening note lists what the drawings must show: pile locations, dimensions, shape, length, and design strength, test pile and load test locations and lengths, and soil data.

Start with the opening drawing note of the issued Section 31 62 13.13: confirm that the foundation plan and pile schedule give each pile its location, casing shape, length, and design strength, with the minimum diameters the tapered and constant section casing articles leave to the drawings, and that test piles, load tests, and soil data are shown. Then check that the casing kept, structural pipe or mandrel-driven shell with an open or closed tip, agrees with the pile details and boring logs, and that the casing inspection, reinforcing cage, concrete placement, splice, cutoff, and test pile requirements agree with the cap details, Section 03 30 00, and the geotechnical report.

Assemble the review package

Gather the foundation or pile plan with pile marks, test piles, and load test piles, the pile schedule with casing type and shape, length or tip elevation, cutoff elevation, design strength or capacity, batter, and any minimum casing wall thickness, the typical pile detail with the tip closure, the casing diameters, the reinforcing cage with its bar sizes and length, and the concrete strength, the splice detail if splices are allowed, the pile cap plan, schedule, and details with pile embedment and dowels into the cap, the structural general notes with design loads, uplift, lateral loads, and any piles standing unsupported above grade, the geotechnical report with boring logs, groundwater, and the bearing stratum, the plan of existing structures near the work, the statement of special inspections, and the issued Section 31 62 13.13 with Sections 03 30 00, 31 00 00, and 01 45 35, and, where the project also uses them, 31 62 23.13 or 31 62 16.13. Follow one pile from its tip closure through its cage to the cap before assuming the others match.

WBDG publishes UFGS 31 62 13.13: Cast-In-Place Concrete Piles as a public guide-specification reference (accessed November 9, 2026). Use your project’s issued specification and amendments for the actual comparison; the guide specification does not automatically govern your project. The checklist below is an original suggested review workflow, not a reproduction of the UFGS requirements.

Eight checks to run against the issued set

Use one record per location or system. The CSV contains the same eight prompts plus fields for source revisions, observed evidence, the review owner, the decision, and closure references.

Eight specification-to-drawing checksSwipe or scroll sideways to read all columns.
CheckSources to compareQuestion to resolve
Drawing items and casing diametersOpening drawing note (locations, dimensions, shape, length, and design strength of piles; test pile and load test locations and lengths; soil data) + Casings note (minimum wall thickness for structural casings; minimum diameters on the drawings) + Uniform Taper, Step-Taper, Constant Section, and Combination Type articles (diameters “as indicated”) + Pile Lengths and Quantity note and Table 1 + foundation plan, pile schedule, and typical pile detailDoes every pile mark resolve to a schedule line with its casing shape, length or tip elevation, cutoff elevation, and design strength, do the drawings give the minimum nominal diameters that the taper, step-taper, and constant section articles say are “as indicated”, at the tip and at the upper point the tapered articles name, where a structural casing is used, is its minimum wall thickness filled into the bracket or shown on the schedule, as the casing note directs, and if the lump sum Pile Lengths and Quantity paragraph is kept, do Table 1 or the drawings give the number, size, capacity, and length of piles it bases the bid on?
Casing type, mandrel, and tip closureCasings article and note (open-end and closed-end structural casings, usually steel pipe; closed-end light-gage shells that are a form only and must be driven with a mandrel; closed-end casings in general, open-end where soil displacement must be avoided or soils are dense, clayey, or very coarse) + bracketed one-type-throughout sentence + Constant Section article (ASTM A252 pipe in lieu of a constant-section casing) + Piles and pile cap shop drawing (casing details, closures, splices) + certificates note (mill certificates only where the casing is structural) + boring logs and pile tip detailWhich casing does the design rely on, a structural pipe that carries load with the concrete or a light-gage shell that is only a form, and do the schedule, the tip detail, and the certificate items say the same thing, if shells are allowed, has the specifier added mandrel requirements, since the casing note says shells must be mandrel-driven but no article or equipment paragraph mentions a mandrel, is the open-end option kept only for ASTM A252 pipe where the logs or nearby structures call for it, as the note advises, and is the one-type-throughout bracket kept where the cap and test pile design assume a single casing, since the combination article lets pipe and shell sections be mixed?
Heave, cleanout, and casing inspection before concretingPreparation article and note (no concrete until casings within a radius or heave range are driven and inspected; inside cleaned; free water removed; each casing inspected for integrity, distortion, and loss of area) + Tolerance in Driving article (heave check and redrive) + Section 03 30 00 Curing and Protection paragraph (pile driving vibration) + Section 31 62 23.13 Driving Procedure (wait before driving near freshly concreted casings) + installation sequenceIs the radius blank in the Preparation article filled in, and does the installation sequence hold concrete until every casing within it is driven, checked for heave, and inspected, how will the inside of a long or tapered casing be inspected along its length and who records it, where open-end casings are kept, has the specifier edited the article, since its note says all soil, water, and foreign material must come out of an open-end casing while the article text lets some free water remain in any casing, and because this section, unlike Section 31 62 23.13, has no rule against driving next to freshly concreted piles, does a sequence note or Section 03 30 00’s protection from pile driving vibration cover it?
Reinforcing cage and dowels into the capReinforcement product article and note (bar size always indicated; length indicated if less than full pile length; Section 03 30 00) + bracketed Reinforcement execution article (unsupported sections, uplift or tension piles, piles in high bending not resisted by batter piles, and between pile top and cap or slab; preassembled unit secured before concreting) + Piles and pile cap shop drawing (placement of steel; bracketed reinforcement calculations) + typical pile detail, cap details, and general notes with uplift and lateral loadsIs the bracketed Reinforcement article kept wherever the general notes show uplift, lateral load, or bending, or a pile stands unsupported above grade, in water, or through very soft soil, does the pile detail give the bar size and, where the cage stops short, its length, as the note requires, are uplift piles reinforced over the length the bracket chosen calls for, do the cage bars or dowels project into the cap with the embedment the cap details show, and if the bracketed reinforcement calculations stay in the shop drawing item, is it clear who designs the cage, since the section has no design responsibility paragraph?
Concrete mix and placement in the casingConcrete product article and note (Section 03 30 00; optional strength, slump, and aggregate size bracket when no pile mix is specified there) + Concrete execution article (continuous placement by funnel or hopper) + Section 03 30 00 Placing Concrete article and its note sending underwater placement to Section 03 31 30 Marine Concrete + Concrete Testing article + structural general notes and pile detailDoes the pile concrete strength on the drawings match either Section 03 30 00 or the bracketed sentence in this section, not both with different values, is the aggregate size compatible with the cage spacing and the smallest casing diameter, since the article places concrete only by funnel or hopper in one continuous operation, has the designer said how concrete reaches the bottom of a long or reinforced casing without segregating or hanging up on the cage, and where water cannot be removed from an open-end casing, is underwater placement specified under Section 03 31 30, as the Section 03 30 00 note directs, rather than left to the funnel sentence?
Hammers, driving schedule, tolerances, and jettingPile Hammers article and note + Driving Helmets (Caps) and Cushion (Capblocks) article + Driving Casing article (calculated tip elevation and the driving resistance schedule the Government prepares from test pile data) + Tolerance in Driving article and note + Jetting or Predrilling of Casings article and note + Pile Records article + pile cap plan and boring logsSince the Pile Hammers note asks the designer to insert a driving energy chosen from a wave equation analysis but the article has no blank for it and the section has no wave equation article, has the specifier added the energy or the analysis the design expects, has the capblock paragraph been clarified, since it allows a solid hardwood block and then bars “wood blocks”, where the timber pile section bars “small wood blocks”, do the cap dimensions absorb the butt location tolerance kept, which its note says may be increased only if the design allows, is jetting or predrilling kept off uplift piles, friction piles in fine-grained soils, piles next to existing structures, and untested clusters, as the note advises, and is it clear when the Government will issue the driving resistance schedule?
Splices, welding, and cutoffSplicing of Load Bearing Casings article and note (splices only when approved; bracketed limit per casing; vertical, lateral, and flexural capacity; full penetration groove weld under AWS D1.1) + Welding article (AWS D1.1/D1.1M for shop and field welding, welder qualification, and weld inspection) + Cut-Off article + Pile Lengths and Quantity adjustments sentence + Piles and pile cap shop drawing + splice detail, cap details, and statement of special inspectionsWhere the design needs splices, is there a splice detail, and has the structural engineer limited splices on uplift piles with structural casings, as the note advises, if the project also issues Section 31 62 23.13 or the steel pipe pile section, are the splice requirements reconciled, since Section 31 62 23.13 asks a splice to develop a smaller share of the casing’s flexural capacity than this section does, does the statement of special inspections cover the splice welds, since this section names AWS D1.1 for weld inspection but has no inspection or testing article of its own, and do the cutoff elevations on the schedule match the cap bottoms and pile embedment?
Test piles, load tests, concrete testing, and recordsSD-06 Test Pile Data and Load Tests (Government-listed calculated tip elevations; no ordering before the list) + Test Piles article and its two notes (the second repeats the jetting note) + bracketed Load Tests article and note (ASTM D1143 compression test; anchor piles; three acceptance options; EFD branch approval) + Concrete Testing article and note table + Pile Records article + boring location plan and pile planAre test piles located on the plans or tied to boring numbers, as the note asks, at spots where they can stay in the work, is one load test acceptance option chosen and the test load filled in, where the schedule shows uplift or lateral piles, has a tension or lateral load test been added, since the section offers only the ASTM D1143 compression test, has the specifier replaced the note’s anchor pile approval by EFD Code 411, 402, or 405 with the office that reviews for the project, is the specimen frequency set from a checked table, since this section’s table repeats one lot size and gives a count out of step with its neighbours, and, with no as-driven survey article, does another section or the drawings require a butt location survey before cap concrete?

Worked example: step-tapered shells with no diameters, a cage the section deleted, and no dowels into the caps

Illustrative example: a one-story vehicle maintenance building on a coastal plain is founded on cast-in-place concrete piles under two- and three-pile caps and a grade beam. The pile schedule calls for step-tapered light-gage shells but gives each pile only a length and a capacity, with no tip or upper diameter, and the issued Section 31 62 13.13 keeps every casing type and combination without the one-type-throughout bracket. The mandrel that the casing note requires for shells appears nowhere in the section. The general notes give uplift at the canopy columns and the typical pile detail shows a short cage in every pile, while the section deletes the bracketed Reinforcement article. The concrete strength in the general notes differs from the one filled into the section’s bracketed concrete sentence, the Preparation article’s radius is left blank, and the cap details show no dowels from the piles into the caps.

Ask the structural engineer to add the minimum tip and upper diameters to the schedule, to say whether the shells are forms only or the design relies on a structural casing, and to detail the cage for the uplift piles over the length the design needs, with dowels into the caps and their embedment. Ask the specifier to keep the one-type-throughout bracket or name the casings allowed, to add mandrel requirements for the shells, to restore the Reinforcement article, to keep one concrete strength in one document, and to fill in the radius so no casing is concreted before its neighbours are driven and inspected. Ask the geotechnical engineer whether the uplift piles need a tension load test, which the section does not offer, and when the driving resistance schedule from the test piles will be issued, since production casings cannot be ordered before it.

See the published structural revision finding. The illustrative scenario above is separate from that published finding.

Avoid a false conflict

Section 31 62 13.13 covers steel casings left in place and filled with concrete: their driving, splicing, cutoff, inspection, reinforcing, and concreting, and their test piles and load tests. The concrete, reinforcing steel, and concrete testing it relies on follow Section 03 30 00 and the concrete guide, whose placing note sends underwater placement to Section 03 31 30 Marine Concrete; pile cap excavation follows Section 31 00 00 and special inspection follows Section 01 45 35, all Active on WBDG; check those before calling a requirement missing. Section 31 62 23.13 Concrete-Filled Steel Piles, an Active USACE section reissued without revision in February 2021 under a new title, covers the same pile with the same four casing shapes and adds a unit price basis, ready-mix plant certification, an excavation sequence, a wait before driving next to freshly concreted casings, and a seismic special inspection paragraph; its Constant Section article ends in a truncated sentence. Driven steel pipe piles with optional concrete infill are UFGS 31 62 16.13 and the steel pipe pile guide, which relies on this section for the infill, and augered cast-in-place piles, drilled with no casing driven, are 31 63 16 and the augered pile guide, so a schedule that mixes pile types should say which section governs each. Pile capacity, casing type and thickness, driving stresses, hammer selection, driving resistance, and load test interpretation are decisions for the structural and geotechnical engineers. The current guide section cites AWS D1.1/D1.1M, ASTM A252, and ASTM D1143/D1143M; confirm the editions your project invokes.

When requirements disagree, follow the project’s document-control and clarification process. Do not assume that drawings always override specifications, or the reverse. Identify the exact sources and request an authorized decision.

Close the issue across the affected documents

Record the location or tag, drawing and specification references, issue dates, observed difference, and the decision needed. Assign an owner and keep the item open until the response identifies the governing requirement. Check the revised drawings and specification references together; a response email alone may leave the issued package inconsistent.

For the overall process, use the guide to drawing and specification conflicts. Mark an inapplicable checklist row with a reason, and distinguish a verified correction from a question that still needs design information.

Where Groundbook fits

Groundbook’s drawing and specification review helps investigate potential disagreements in the documents you supply. Include the relevant specification sections and drawing references, then verify the cited evidence with the responsible reviewers before acting on a finding.

Questions, answered

FAQs

What should a cast-in-place concrete pile specification review compare?

Compare the drawing items and casing diameters, the casing type, mandrel, and tip closure, heave, cleanout, and casing inspection before concreting, the reinforcing cage and dowels into the cap, the concrete mix and its placement in the casing, hammers, the driving schedule, tolerances, and jetting, splices, welding, and cutoff, and test piles, load tests, concrete testing, and records.

What must cast-in-place concrete pile drawings show under UFGS 31 62 13.13?

The current UFGS 31 62 13.13 Cast-In-Place Concrete Piles on WBDG asks the drawings to show pile locations, dimensions, shape, length, and design strength, the locations and lengths of test piles and load tests, and soil data where required. Its casing articles leave the minimum nominal diameters to the drawings, its reinforcement note asks that the bar size always be indicated, with the length where the cage is shorter than the pile, and its test pile note asks for test pile locations or boring numbers. UFGS numbers are DoD guide specification numbers, not universal MasterFormat titles, and your project’s issued specification governs.

Should the casing be structural steel pipe or a mandrel-driven shell?

That is a design decision for the structural and geotechnical engineers. UFGS 31 62 13.13 allows open-end or closed-end structural casings, usually steel pipe, whose minimum thickness the designer specifies, and closed-end light-gage shells, whose thickness the contractor chooses because the shell is only a form, driven with a mandrel. Its note prefers closed-end casings unless soil displacement must be avoided or the soils are dense, clayey, or very coarse. A review checks that the schedule, tip detail, certificates, and casing articles describe the same casing.

How does UFGS 31 62 13.13 relate to 31 62 23.13 and the steel pipe pile section?

UFGS 31 62 23.13 Concrete-Filled Steel Piles is the USACE section for the same pile, formerly titled Cast-In-Place Concrete Piles, Steel Casing, with the same casing shapes, a unit price basis, a wait before driving near freshly concreted casings, and a smaller splice capacity share; this guide covers both, so check which one your project issued. UFGS 31 62 16.13 Steel Pipe Piles treats the pipe as the pile, with concrete infill as an option that relies on 31 62 13.13, and has its own guide.

Can Groundbook check cast-in-place pile drawings against Section 31 62 13.13?

Groundbook compares the drawing set with the reference documents you upload, such as your issued Section 31 62 13.13, the geotechnical report, the related concrete and earthwork sections, and licensed codes or standards you hold, and links each potential disagreement to both sources. It has no built-in code library and does not calculate pile capacity, casing thickness, driving stresses, or wave equation results, interpret load tests, certify compliance, or design the piles. Each finding is a question for the structural engineer, the geotechnical engineer, or the contracting officer.

Keep exploring

Continue your review

Check steel pipe pile specifications against pile schedules, tip and infill details, and cap details

Compare pipe grade and seams, cutting shoes, concrete infill, epoxy coating, splices, cap plates, tolerances, and load tests with UFGS 31 62 16.13.

Explore

Check augered cast-in-place pile specifications against pile plans, schedules, and cap details

Compare ACIP pile tips and cutoffs, grout, cages, grout volume records, integrity and load tests, and pile cap embedment with UFGS 31 63 16.

Explore

Check precast prestressed concrete pile specifications against pile plans, schedules, and cap details

Compare pile schedule, strand pattern, splices, build-ups, cutoff and cap embedment, test piles, driving criteria, and tolerances with UFGS 31 62 13.20.

Explore

Check steel H-pile specifications against pile plans, schedules, and cap details

Compare H-pile grade, corrosion protection, pile points, welded splices, cap embedment, tolerances, hammers, and load tests with UFGS 31 62 16.16.

Explore

Check drilled concrete pier and shaft specifications against shaft schedules and foundation details

Compare drilled shaft diameters, bottom elevations, rock sockets, casing, dry or wet placement, cages, tests, and anchor bolts with UFGS 31 63 29.

Explore

Check timber pile specifications against pile location plans, schedules, and cap details

Compare timber pile circumference, species, preservative treatment, straightness, splices, shoes, cutoff, driving stresses, and load tests with UFGS 31 62 19.

Explore

Check concrete specifications against drawings

Compare concrete mix references, slab finishes, joints, embeds, and curing requirements across specifications and drawings. Includes an editable checklist.

Explore

Concrete and reinforcement drawing review checklist

Review mixes, bar marks, cover, splices, openings, embeds, and joints across placing drawings and contract documents. 12 prompts and a free editable CSV.

Explore

Check earthwork specifications against drawings

Compare fill classification, subgrade compaction, trench backfill, and finish grading across the civil drawings and earthwork specification.

Explore

AWS D1.1 structural welding review: weld symbols, joint details, and inspection callouts

Review structural steel weld symbols, joint details, and inspection notes against AWS D1.1/D1.1M:2025, the steel spec, and AISC 360. Checks and AI limits.

Explore

Check special inspection specifications against the drawings

Compare the statement and schedule of special inspections, seismic systems, inspector qualifications, and fabricator shops with UFGS 01 45 35.

Explore

Pile cap and flat slab reinforcement

A structural review of a pile-supported concrete building finds foundation beams with no bars, columns off their pile caps and punching links in thin slabs.

Explore

Drawings vs. specifications

Compare drawing requirements with specifications, schedules, and controls. Find potential equipment, material, and scope inconsistencies with Groundbook AI.

Explore

Bring your next set into focus

Set up a review or talk through your project with our team.

Check your pile schedule, casing, and cap details against Section 31 62 13.13