Start with the drawing note of the issued Section 06 18 00: confirm that the drawings show every glulam member with its cross-section and dimensions, the bending stress and grading for each member, the design loads, a layout with floor elevations and appearance grades, hanger details, and the metal shapes and hardware for each connection. Then check who designs the members, that species, grading rules, appearance grade, treatment, and hardware coating suit the exposure shown on the sections, and that the section’s LVL request, unbracketed western grading rule, fire-retardant paragraph tied to preservative standards, and glulam reinforcement wording are resolved.
Assemble the review package
Gather the structural general notes with design loads and the NDS edition, the roof and floor framing plans with glulam member marks, the member schedule with sizes, combinations or stress values, camber, and appearance grade, the connection details at bearings, column bases, beam-to-girder and purlin hangers, and arches, the architectural reflected ceiling plans, sections, and elevations showing exposed glulam, the wall sections and canopy or overhang details where members reach the exterior, the finish legend, the life safety plans if fire-retardant treatment is relied on, the project’s climate zone and Environmental Severity Classification from UFC 1-200-01, and the issued Section 06 18 00 with Sections 06 10 00, 05 12 00 or the metal fabrications section, the painting section, and the special inspection section. Follow one member from its bearing to its connections, finish, and exposure before assuming the others match.
WBDG publishes UFGS 06 18 00: Glued-Laminated Construction as a public guide-specification reference (accessed November 15, 2026). Use your project’s issued specification and amendments for the actual comparison; the guide specification does not automatically govern your project. The checklist below is an original suggested review workflow, not a reproduction of the UFGS requirements.
Eight checks to run against the issued set
Use one record per location or system. The CSV contains the same eight prompts plus fields for source revisions, observed evidence, the review owner, the decision, and closure references.
| Check | Sources to compare | Question to resolve |
|---|---|---|
| What the drawings must show | Drawing note (details of every laminated member with cross-sections and dimensions; Fb and modulus of elasticity for laminated veneer lumber and Fb and grading for glulam, to the ANSI/AWC NDS; floor, roof, wind, and concentrated loads including partitions and suspended equipment; layout with floor elevations and appearance grades; hanger details; metal shapes and hardware for connections) + System Description (field measurements before fabrication drawings) + framing plans, member schedule, and connection details | Does the member schedule give each glulam member its size, combination or stress values, and appearance grade, do the general notes give the loads the note lists, including equipment hung from the members, are hangers and connection hardware detailed for each condition, and has the specifier either removed the laminated veneer lumber values from the note or pointed them at the section that specifies LVL? |
| Who designs the members | Lumber note (designer determines species and grade) + Lumber option (combination determined by the design requirements and designated on the shop drawings with AITC combination symbols) + Certifications (signed and sealed documentation by a licensed “[Engineer][Architect]” verifying design load compliance with ASCE 7-22 and ICC IBC) + SD-02 Fabrication Drawings (no “G”) and Installation Drawings (“G”) + structural general notes | Do the general notes say whether the engineer of record has sized the members and chosen the combinations or left them to the laminator, has the specifier kept only the Lumber option that matches, is the design-load compliance document required from an engineer where member design is delegated, and does the Government review the fabrication drawings that carry that design? |
| Species, grading rules, and manufacture standards | Qualifications (AITC or APA licensed manufacturer; quality mark and certificate of conformance on every member; manufacture to [AITC 119], APA E30, ASTM D3737, ANSI A190.1, and WWPA G-5, the western grading rule unbracketed) + General (AITC 113, ANSI 117, ANSI A190.1, AWC NDS, [AITC 119]) + Lumber brackets (hardwood to AITC 119; Douglas fir or larch to WWPA G-5; Southern Pine to SPIB 1003; other options) + moisture content before bonding + member schedule | Has the specifier kept one species option that matches the member schedule and the stress values the engineer used, and bracketed WWPA G-5 in the Qualifications paragraph so it does not apply to Southern Pine or hardwood members, and are the hardwood standards deleted where softwood glulam is drawn? |
| Appearance grade and exposed surfaces | Appearance grade bracket (Premium, Architectural, Industrial, or Framing to ANSI A190.1) and note (Industrial for concealed or appearance-insensitive work; Framing only in concealed construction) + drawing note (appearance grades identified on the layout) + SD-04 Exposed-to-View Surfaces with “G” and Surfaces paragraph (samples) + reflected ceiling plans, sections, and elevations | Does the layout or schedule assign an appearance grade to each member, matching where the architectural sheets leave members exposed, has the specifier replaced the single bracket with a grade per area if the project mixes exposed and concealed glulam, and do the samples cover each exposed grade and finish? |
| Treatment, exposure, and moisture | Exposure note (glulam generally not exposed to weather in humid climate zones or severe Environmental Severity Classifications; detail members to prevent direct rainfall) + drawing note (preservative treatment for wet use, per AITC 109 or APA S580, “found in other sections”) + Preservative and Fire-Retardant Treatment (fire-retardant treatment only, pressure impregnated “in accordance with” AITC 109 and APA S580, titled preservative treatment standards; flame spread to UL 723 and ASTM E84; penetration against QPL-19140; kiln drying after treatment) and note (include only where a flame spread rating is required; interior use only) + Adhesive (exterior, waterproof) + wall sections, canopy, and overhang details | Do the wall sections, canopies, and overhangs keep glulam out of the weather or add flashing and caps where members extend outside, if any member is in wet service, which section specifies its preservative treatment, is the fire-retardant paragraph deleted unless the life safety plans rely on a flame spread rating, and has the specifier pointed it at fire-retardant treatment standards rather than preservative ones? |
| Certificates and glue-line testing | Certifications (product or laboratory report from a certification body under ISO 17065 or an inspection agency under ISO 17020; manufacturer and grade; glue-line shear and durability results and “compliance with the requirements of ASTM D3737”, titled a practice for establishing allowable properties; tests on the production lot; certification to ANSI A190.1 and ANSI 117) + Adhesive (ASTM D2559 and ANSI 405) + SD-07 items + quality marks | Has the specifier tied the glue-line test results to the standard the project intends for bond quality, are the certificates required before delivery for the lot actually shipped, and do the SD-07 items, which carry no “G”, match the importance the project places on them? |
| Connections, hardware, and anchor bolts | Timber Hardware brackets (carbon steel shapes, plates, and bars; hot-rolled sheet; stainless bars, shapes, plate, and sheet, Type 304 or 316) + anchor bolts and washers (metric and inch-pound washer standards run together) + galvanizing for exterior locations with a coating class bracket, primer elsewhere + Installation Drawings (anchorage devices embedded in other construction) + Construction (APA EWS T300, titled glulam connection details, for member spacing, placement, and installation methods) + connection and base details | Do the connection details name a steel or stainless material and a coating that match the kept brackets and the exposure, is the galvanizing class filled in, are anchor bolts at column bases shown on the foundation plan with the embedded items on the installation drawings, and do the details keep connections from trapping water or restraining shrinkage across the depth of deep members? |
| Finishes, delivery, erection, and protection | Finishes brackets (stain and sealer; clear varnish; end sealer with or without a penetrating sealer; unfinished; stain and varnish to a color) + Delivery, Handling, and Storage (AITC 111 and APA EWS R540; original wrapping; nonmarring slings; supports off the ground) + Installation Drawings (members, sequence, and the “location, size, and type of reinforcement”) + Construction (padded slings, bracing until stable, minimal cutting, end sealer on cuts) + Protection (temporary waterproof cover until enclosure; gradual heating) + finish legend and painting section | Does the finish legend choose one factory finish that the painting section does not repeat or contradict, has the specifier removed the reinforcement wording from the installation drawing paragraph unless reinforced glulam is intended, do the installation drawings show erection bracing and sequence, and does the schedule keep members covered until the building is closed in? |
Worked example: an exposed glulam roof over a chapel entry canopy with no appearance grade on the schedule
Illustrative example: a chapel at a coastal installation in a humid climate zone has exposed glulam beams and purlins over the nave that continue outside to form an entry canopy. The issued Section 06 18 00 keeps every Lumber option, keeps the fire-retardant paragraph, keeps Architectural grade for all members, and keeps all six finish brackets. The member schedule gives sizes but no combination or appearance grade, the canopy section shows the beam ends exposed with no cap or flashing, the connection details show carbon steel knife plates with no coating, and the life safety plans rely on no flame spread rating for the glulam.
Ask the structural engineer to add combinations or stress values to the member schedule, to state whether the laminator designs any members, and to choose a stainless or galvanized connection material for the canopy. Ask the architect to stop the glulam at the enclosure or detail caps and flashing at the canopy, to assign appearance grades by area, and to choose one finish. Ask the specifier to keep one species option, bracket the western grading rule, delete the fire-retardant paragraph, specify preservative treatment for any member left in wet service, and resolve the LVL note, the ASTM D3737 test sentence, and the reinforcement wording.
Avoid a false conflict
Section 06 18 00 covers glulam members, their hardware, finish, and erection. Light framing, nailers, and the glulam paragraph within light construction follow Section 06 10 00 and the rough carpentry guide, cross-laminated timber follows its own section and the mass timber pages, steel connections beyond timber hardware follow the structural steel or metal fabrications section, field painting follows the painting section, and the AWC NDS and the adopted building code govern design, so check those before calling a requirement missing. Some of the section’s own wording needs resolving: the drawing note asks for LVL values that no paragraph specifies, the Qualifications paragraph requires the western grading rule without a bracket, the treatment paragraph is titled for preservative treatment but specifies fire-retardant treatment to preservative standards, the certificate paragraph ties glue-line tests to an allowable-properties practice, and the installation drawing paragraph asks for reinforcement the section does not specify. Ask the specifier which wording the project intends before treating a difference as a design conflict.
When requirements disagree, follow the project’s document-control and clarification process. Do not assume that drawings always override specifications, or the reverse. Identify the exact sources and request an authorized decision.
Close the issue across the affected documents
Record the location or tag, drawing and specification references, issue dates, observed difference, and the decision needed. Assign an owner and keep the item open until the response identifies the governing requirement. Check the revised drawings and specification references together; a response email alone may leave the issued package inconsistent.
For the overall process, use the guide to drawing and specification conflicts. Mark an inapplicable checklist row with a reason, and distinguish a verified correction from a question that still needs design information.
Where Groundbook fits
Groundbook’s drawing and specification review helps investigate potential disagreements in the documents you supply. Include the relevant specification sections and drawing references, then verify the cited evidence with the responsible reviewers before acting on a finding.