Guide · Specifications and drawings · 23 52 00

Check heating boiler specifications against drawings

Section 23 52 00 covers packaged hot water and steam boilers fired by oil, gas, or both, along with their burners, controls, venting, and water treatment. Its choices between boiler types and between stacks and direct vents change what the mechanical, plumbing, and architectural drawings must show.

Confirm the boiler type, service, and fuel the specification keeps, then compare them with the boiler schedule and the venting the drawings show: a breeching and stack for conventional boilers, or separate intake and exhaust direct vents for condensing boilers. Then trace the gas train or oil system, the combustion safety controls and alarm, the expansion tank and air separator, and the water treatment equipment to the sheets that show them.

Assemble the review package

Gather the boiler and pump schedules, the boiler room plan and sections, the heating water or steam piping schematic, the roof and wall plans showing stacks or vent terminations, the gas piping or fuel oil drawings, the controls drawings and sequence, the plumbing drawings for makeup water and water treatment, and the issued Section 23 52 00 with the fuel and gas piping sections it points to. Review one boiler from fuel supply to flue before assuming the others match.

WBDG publishes UFGS 23 52 00: Heating Boilers as a public guide-specification reference (accessed October 18, 2026). Use your project’s issued specification and amendments for the actual comparison; the guide specification does not automatically govern your project. The checklist below is an original suggested review workflow, not a reproduction of the UFGS requirements.

Eight checks to run against the issued set

Use one record per location or system. The CSV contains the same eight prompts plus fields for source revisions, observed evidence, the review owner, the decision, and closure references.

Eight specification-to-drawing checksSwipe or scroll sideways to read all columns.
CheckSources to compareQuestion to resolve
Boiler type and serviceBoilers and Hot Water Heating Boilers or Steam Heating Boilers articles + boiler scheduleDo the specification and schedule agree on firetube, watertube, cast iron, or condensing, on hot water or steam, and on the capacity indicated?
Burners and fuelFuel Burning Equipment and Burners articles + boiler schedule + fuel drawingsIs each boiler shown burning the fuel the specification keeps (oil, gas, or both), with the draft arrangement it selects?
Breeching and stacksConventional Breeching and Stacks article + roof plan + sectionsFor conventional boilers, are the breeching and stacks drawn, with stack heights indicated and clearance to combustibles shown?
Direct vents for condensing boilersDirect Vents article + roof or wall plansFor condensing boilers, are a separate combustion air intake and exhaust vent drawn for each boiler, sized and located as the section says to indicate?
Combustion safety controlsCombustion Safety Controls and Equipment article + controls drawings + boiler room planAre the controller panels, low-water cutoffs, and the alarm bell shown where indicated, with the shutdown conditions the section lists in the sequence?
Gas fuel trainGas Fuel System article + gas piping drawingsDo the gas drawings show the stop valve, strainer, regulator, pressure gauges, and safety shutoff valve the section lists, with provision for valve leakage testing?
Fuel oil systemFuel Oil Storage System and Automatic Safety Shutoff Valve articles + fuel oil drawingsWhere oil is fired, is the tank drawn to Section 33 56 10, and is the fire shutoff valve shown at the day tank or building entry with its detector over the burner?
Hydronic accessories and water treatmentExpansion Tank, Air Separator, and Boiler Water Treatment articles + piping schematic + plumbing drawingsAre the expansion tank, air separator, and the water treatment equipment the section keeps drawn and connected on the piping and plumbing sheets?

Worked example: condensing boilers drawn with a conventional stack

Illustrative example: the boiler schedule lists condensing hot water boilers, and the issued Section 23 52 00 keeps the direct vents article. The mechanical roof plan shows a single common stack with a rain hood serving all boilers, and no combustion air intake terminations are drawn.

Ask the mechanical engineer to confirm the boiler type and venting, then draw a separate intake and exhaust vent for each boiler or revise the boiler selection and specification. Recheck the condensate drainage and the roof or wall termination locations before closing the item.

Avoid a false conflict

Section 23 52 00 bundles the boiler with burners, pumps, terminal units, and water treatment, and its edits often lag the schedule. Read the edited project section, since a paragraph deleted for one boiler type may still be there.

When requirements disagree, follow the project’s document-control and clarification process. Do not assume that drawings always override specifications, or the reverse. Identify the exact sources and request an authorized decision.

Close the issue across the affected documents

Record the location or tag, drawing and specification references, issue dates, observed difference, and the decision needed. Assign an owner and keep the item open until the response identifies the governing requirement. Check the revised drawings and specification references together; a response email alone may leave the issued package inconsistent.

For the overall process, use the guide to drawing and specification conflicts. Mark an inapplicable checklist row with a reason, and distinguish a verified correction from a question that still needs design information.

Where Groundbook fits

Groundbook’s drawing and specification review helps investigate potential disagreements in the documents you supply. Include the relevant specification sections and drawing references, then verify the cited evidence with the responsible reviewers before acting on a finding.

Questions, answered

FAQs

What should a heating boiler specification review compare?

Compare the boiler type and service, burners and fuel, breeching and stacks or direct vents, combustion safety controls, the gas fuel train, the fuel oil system, and hydronic accessories and water treatment.

Does UFGS 23 52 00 require a fire shutoff valve on the oil supply?

The current UFGS 23 52 00 on WBDG calls for an automatically operated valve on the oil supply to each oil burner that shuts off oil in case of fire near the burner, activated by a detection device over the burner. Your project’s issued specification governs, so confirm what it says after editing.

Does this checklist confirm the boiler plant is code compliant?

No. It checks that the drawings and the specification describe the same boiler plant. It does not confirm code compliance or the design. Boiler selection, venting design, combustion safety, and approval stay with the engineer of record and the authority having jurisdiction.