Guide · Specifications and drawings · 03 62 16

Check metallic non-shrink grout specifications against base plate, equipment, and connection details

UFGS Section 03 62 16 Metallic Non-Shrink Grouting, a NAVFAC-prepared guide specification issued in August 2023 after a complete life cycle review, covers expansive grout made with a metallic expansive agent: Type A grout, which expands as an oxidizable metallic aggregate oxidizes, and Type B grout, which expands as aluminum powder releases gas while the grout sets. Its short text lists portland cement, aggregate, water, and the expansive admixture, then a grout placement plan and inspection reports, cleaning of cavities, mixing and placing to the manufacturer’s instructions, pressure injection of blind cavities with venting, acceptance tests for expansion and compressive strength, and protection while the grout cures. Its opening note asks the drawings to indicate the areas where the grout is applied.

Start with the opening note of the issued Section 03 62 16: confirm that the drawings mark every place the metallic grout goes, such as column base plates, equipment bases, rails, and blind connection cavities, with a grout depth and edge detail at each. Then check that the Type A or Type B choice and the admixture paragraph agree, that the section says whether the grout is a packaged product or batched at the site, that blind cavities have injection ports and vents, that the compressive strength and its test age agree with the structural or equipment notes, and that the grout is not used where another grout section or a nonmetallic grout is called for.

Assemble the review package

Gather the structural general notes with grout type and strength, the column base plate and anchor rod details with leveling nuts or shims and grout depth, the equipment pad and skid details for pumps, generators, compressors, and fans with the manufacturer’s installation requirements, crane rail, sole plate, and bearing details, precast or steel connection details with grouted keyways, sleeves, or pockets, the architectural details where a grout edge stays exposed, the design analysis or equipment schedules with vibration or exposure notes, and the issued Section 03 62 16 with Sections 03 30 00, 05 12 00, 05 05 20, the equipment sections, and any other grout section in the project. Follow one base plate and one equipment base from the bearing surface to the grout edge before assuming the others match.

WBDG publishes UFGS 03 62 16: Metallic Non-Shrink Grouting as a public guide-specification reference (accessed November 12, 2026). Use your project’s issued specification and amendments for the actual comparison; the guide specification does not automatically govern your project. The checklist below is an original suggested review workflow, not a reproduction of the UFGS requirements.

Eight checks to run against the issued set

Use one record per location or system. The CSV contains the same eight prompts plus fields for source revisions, observed evidence, the review owner, the decision, and closure references.

Eight specification-to-drawing checksSwipe or scroll sideways to read all columns.
CheckSources to compareQuestion to resolve
Where the grout goesOpening note (areas of application indicated on the drawings; surface preparation in other sections) + structural general notes on grout + base plate, equipment base, rail, bearing, and connection details + specification table of contents for other grout sectionsDo the drawings mark each location where metallic non-shrink grout is used, rather than a general note calling for non-shrink grout everywhere, is a grout depth or range given at each base plate and equipment base so the placing method can be chosen, and where the general notes or another section call for nonmetallic or epoxy grout at some locations, is the boundary between the grouts drawn?
Type A or Type B, and the admixture to matchExpansive Admixtures brackets (oxidizable metallic aggregate or aluminum powder) and note (first paragraph for Type A) + Expansive Grout brackets (Type A with an oxidation-promoting ingredient per the manufacturer; Type B with aluminum powder and a percentage limit by weight that does not say of what) and notes (Type A expansion continues until the aggregate is oxidized or the grout is sealed off from oxygen; Type B expansion continues until the gas is spent or the grout stiffens) + details showing confinement and exposed edgesDo the two bracketed pairs keep the same type, has the specifier stated what the Type B percentage limit applies to, and do the details show the grout confined in the way each type’s expansion assumes, with forms or shoulders at the edges, rather than left as a broad unconfined surface?
Job-mixed components or a packaged groutPortland Cement (one type; worded as “portland cement grout”) + Aggregates (ASTM C33/C33M samples; gradation “as directed”) + Water + Expansive Admixtures samples + Expansive Grout and Mixing (manufacturer’s instructions; “both cementitious grout and epoxy grout”) + Field Quality Control (testing to ASTM C1107/C1107M, titled for packaged dry grout) + SD-04 and SD-07 itemsHas the specifier said whether the contractor batches the grout from cement, aggregate, and admixture at the site or uses a packaged product, since the materials read as one and the mixing and testing as the other, is the aggregate gradation stated rather than left to direction, and has the mention of epoxy grout been removed or an epoxy grout specified where the drawings call for it?
Placement plan and inspection reportsGrout Placement Plan and Inspection Reports (examples of reports per ACI 214R, 211.5R, 311.4R, and the ACI Manual of Concrete Practice; methods of application and manufacturer’s instructions a bracketed number of days before “expansive concrete operations”; cavity preparation, mixing, placement, curing, and discoloration) + SD-01 and SD-06 Grout Placement and Inspection Reports + construction scheduleIs the plan due a stated time before grouting, since the paragraph ties it to expansive concrete operations the section does not cover, does the plan cover each grout location the drawings show, including blind cavities, and is the reports submittal under SD-01 and SD-06 the same item as the plan the paragraph describes?
Cavity preparation and bearing surfacesPreparation article (cleaning foreign matter, laitance, dirt, grease, and oil per the manufacturer; contact surfaces cleaned a set time before grouting) and note (verify that “the section cited below” is included, with no section cited) + Section 03 30 00 surface finish at grouted areas + base plate details (leveling nuts, shims, or leveling plates) + equipment manufacturer’s installation requirementsDo the details show the concrete surface under the grout roughened and the edge shoulders formed as the grout and equipment manufacturers expect, are shims or leveling nuts shown and their removal or retention stated, and since the Preparation note asks the editor to confirm a section it never names, has the specifier named the section that prepares the bearing surfaces?
Placing, blind cavities, and pressure injectionPlacing Grout (manufacturer’s instructions; no grout that has begun to set or has passed its working time) + blind cavity paragraph (pressure injection under controlled venting; vent blocked for a final pressure; lower pressure where damage may result) + Mixing (mechanical mixers close to the work) + precast and steel connection details with grouted sleeves, keyways, and pocketsDo the details for each blind cavity, such as grouted sleeves, pockets, and keyways, show an injection port and a vent at the high point, can the cavity and its forms take the injection pressure the section allows, or does the detail note a lower pressure, and is the travel distance under wide base plates short enough for the grout to flow within its working time?
Acceptance tests and strengthField Quality Control (testing and reports to ASTM C1107/C1107M; expansion limits at a stated age; compressive strength with a default value and a bracket but no test age) + SD-06 Expansion and Compressive Strength + structural general notes and equipment requirementsDoes the compressive strength in the issued section agree with the grout strength in the structural notes and the equipment manufacturer’s requirements, has the specifier added the test age, since the strength line has none, and is a testing frequency or a number of specimens per grout location stated, since the section states neither?
Protection, curing, and exposed groutProtection article (premature drying; cold and hot temperatures; manufacturer’s cold and hot weather protection) + reports paragraph (methods of preventing discoloration) + Type A note (expansion by oxidation of metallic aggregate) + architectural details and finish schedules at exposed base plates and equipment padsWhere a grout edge stays exposed to view or weather, such as column bases in finished spaces or equipment pads outdoors, has the designer accepted metallic grout there, given the discoloration the reports paragraph addresses, or called for a nonmetallic grout, is a curing method stated for each location, and does the construction schedule protect outdoor grout in cold or hot weather?

Worked example: a generator base, exposed column bases, and a precast stair pocket with no vent

Illustrative example: a fire station addition at an installation has steel columns on grouted base plates in the apparatus bay, a new emergency generator on a skid over a concrete pad outdoors, and a precast stair whose landing bears in grouted pockets on a cast-in-place wall. The structural general notes call for “non-shrink grout” everywhere and give a compressive strength higher than the value the issued Section 03 62 16 keeps, which states no test age. The issued section keeps both the Type A admixture and the Type B grout paragraph, keeps the mixing sentence on epoxy grout, and leaves the aggregate gradation as directed. The generator manufacturer requires an epoxy grout under the skid. The base plate details give no grout depth, and the stair pocket detail shows no injection port or vent.

Ask the structural engineer to state which grout goes at each location, to give grout depths and edge shoulders on the base plate and generator details, to add an injection port and vent at the stair pocket, and to reconcile the grout strength with the specification. Ask the specifier to keep one grout type in both bracketed pairs, to state whether the grout is packaged or batched at the site, to add a test age and test frequency, to specify the epoxy grout the generator needs in its own section or remove the epoxy mention, and to confirm with the architect whether metallic grout may stay exposed at the apparatus bay columns.

Avoid a false conflict

Section 03 62 16 covers expansive grout made with a metallic expansive agent. The concrete and its surface finish follow Section 03 30 00 and the concrete guide, column base plates and anchor rods follow Section 05 12 00 and the structural steel guide, post-installed anchors follow Section 05 05 20 and the post-installed anchor guide, grout for bonded post-tensioning tendons follows Section 03 23 00 and the post-tensioning tendon guide, precast connections follow Section 03 45 33 and the precast structural concrete guide, and equipment manufacturers often name their own grout, so check those before calling a requirement missing. Some of the section’s own wording needs resolving: its mixing paragraph covers an epoxy grout it does not specify, its Preparation note refers to a section it never cites, its placement plan is timed to expansive concrete operations, its materials read as a site-batched grout while its mixing and testing follow a packaged grout, its Type B limit does not say what the percentage is of, and its compressive strength has no test age. Ask the specifier which wording the project intends before treating a difference as a design conflict.

When requirements disagree, follow the project’s document-control and clarification process. Do not assume that drawings always override specifications, or the reverse. Identify the exact sources and request an authorized decision.

Close the issue across the affected documents

Record the location or tag, drawing and specification references, issue dates, observed difference, and the decision needed. Assign an owner and keep the item open until the response identifies the governing requirement. Check the revised drawings and specification references together; a response email alone may leave the issued package inconsistent.

For the overall process, use the guide to drawing and specification conflicts. Mark an inapplicable checklist row with a reason, and distinguish a verified correction from a question that still needs design information.

Where Groundbook fits

Groundbook’s drawing and specification review helps investigate potential disagreements in the documents you supply. Include the relevant specification sections and drawing references, then verify the cited evidence with the responsible reviewers before acting on a finding.

Questions, answered

FAQs

What should a metallic non-shrink grout specification review compare?

Compare where the grout goes, the Type A or Type B choice and the admixture to match, job-mixed components or a packaged grout, the placement plan and inspection reports, cavity preparation and bearing surfaces, placing, blind cavities, and pressure injection, acceptance tests and strength, and protection, curing, and exposed grout.

What must the drawings show under UFGS 03 62 16?

The current UFGS 03 62 16 Metallic Non-Shrink Grouting on WBDG asks the designer to indicate the areas where the grout is applied on the drawings. The section itself sets no grout depth, edge shape, or injection port location, so the base plate, equipment base, and connection details need to give them. UFGS numbers are DoD guide specification numbers, not universal MasterFormat titles, and your project’s issued specification governs.

What is the difference between Type A and Type B metallic grout?

In UFGS 03 62 16, Type A grout expands as an oxidizable metallic aggregate oxidizes, and its note says the expansion continues until the aggregate is used up or the grout is sealed off from oxygen. Type B grout expands as aluminum powder releases gas during and after mixing, until the reaction is spent or the grout has stiffened. The section offers one paragraph for each, and the admixture paragraph must be edited to the same type.

Can Groundbook check grout details against Section 03 62 16?

Groundbook compares the drawing set with the specification sections and reference documents you upload, such as your issued Section 03 62 16, the structural steel and concrete sections, equipment installation manuals, and licensed standards you hold, and returns potential conflicts with links to the source pages. It has no built-in code library and does not select grouts, calculate bearing or strength, certify compliance, or approve submittals. Each finding is a question for the structural engineer, the specifier, or the contracting officer.

Keep exploring

Continue your review

Check stressed tendon specifications against tendon profiles, anchorage details, and structural notes

Compare tendon type, strand, ducts and sheathing, profiles, anchorages, stressing, grout class, and pocket patching with UFGS 03 23 00.

Explore

Check structural steel specifications against drawings

Trace steel grades, connections, coatings, delegated-design references, and inspections across specifications and drawings with an editable checklist.

Explore

Check post-installed anchor specifications against drawing callouts

Compare anchor types, base material, evaluation reports, bond strength tables, installer training, and special inspection with UFGS 05 05 20.

Explore

Check concrete specifications against drawings

Compare concrete mix references, slab finishes, joints, embeds, and curing requirements across specifications and drawings. Includes an editable checklist.

Explore

Check precast structural concrete specifications against framing drawings

Compare precast framing layout, delegated member design, topping, bearing and connections, openings, fire rating, and PCI certification with UFGS 03 45 33.

Explore

Equipment schedule coordination checklist

Trace equipment tags, duties, power, controls, and support requirements across plans and schedules with a practical coordination checklist and example.

Explore

Structural drawing review checklist

Review structural notes, framing plans, schedules, details, and support interfaces with a practical checklist, worked example, and free editable CSV.

Explore

ACI 301 review: how the project specification and drawings complete ACI’s reference specification

Review a project that cites ACI 301-20: edition, mandatory and optional checklist choices, specialty concrete sections, finishes, tolerances, and testing.

Explore

Drawings vs. specifications

Compare drawing requirements with specifications, schedules, and controls. Find potential equipment, material, and scope inconsistencies with Groundbook AI.

Explore

Bring your next set into focus

Set up a review or talk through your project with our team.

Check grout specs against your base plate and equipment details

Trusted by hundreds of professionals