Start with the drawing note of the issued Section 08 32 13: the drawings must show opening sizes and a schedule, the arrangement of fixed and sliding panels, and how frames are anchored, so confirm that every sliding door on the plans has a schedule entry, an elevation with its panel arrangement, and a head, jamb, and sill detail. Then check the life safety plan, because the section says a sliding glass door must not be the only exit from a public use area, and confirm that hardware, glazing, screens, and finish brackets match what the schedule and elevations show.
Assemble the review package
Gather the floor plans and life safety plan, the door schedule or a separate sliding door schedule, the exterior elevations and door type elevations with panel arrangements, the head, jamb, and sill details with anchoring, flashing, and sill pans, the hardware sets and keying schedule, the glazing schedule, the energy compliance documents, the project’s Environmental Severity Classification from UFC 1-200-01, and the issued Section 08 32 13 with Sections 07 92 00, 08 71 00, and 08 81 00. Follow one balcony or patio opening from the plan to the sill detail before assuming the others match.
WBDG publishes UFGS 08 32 13: Aluminum Sliding Glass Doors as a public guide-specification reference (accessed November 18, 2026). Use your project’s issued specification and amendments for the actual comparison; the guide specification does not automatically govern your project. The checklist below is an original suggested review workflow, not a reproduction of the UFGS requirements.
Eight checks to run against the issued set
Use one record per location or system. The CSV contains the same eight prompts plus fields for source revisions, observed evidence, the review owner, the decision, and closure references.
| Check | Sources to compare | Question to resolve |
|---|---|---|
| What the drawings must show | Drawing note (opening sizes and schedule; arrangement of fixed and sliding panels; methods of anchoring frames) + Aluminum Sliding Glass Doors (sizes and arrangements indicated) + Shop Drawing Information (elevations of each door type, sections, anchoring, glazing method, hardware, weatherstripping, finish, screens) + door schedule, elevations, and details | Does every sliding door opening have a schedule entry with its size and type, an elevation showing which panels slide and which are fixed and which way they open, and a detail showing how the frame is anchored to the wall or slab? |
| Use, egress, and the life safety plan | Use note (entrance to a patio, terraced area, or balcony where primary conventional door exits serve the same interior area; never the only exit from public use areas) + floor plans and life safety plan | Does each room with a sliding glass door also have a conventional exit door, does the life safety plan avoid counting a sliding door as the only exit from a lounge, dayroom, or other public use area, and is the door used only at a patio, terrace, or balcony as the note intends? |
| Door type, class, and wind | Aluminum Sliding Glass Doors note (AAMA/WDMA/CSA 101/I.S.2/A440 type and minimum performance class by grade; high wind zones by the standard’s recommendation) + type bracket (residential, commercial, heavy commercial, or other) + thermal barrier requirement + stock sizes note + door schedule and structural design criteria | Does the schedule or a general note state the performance type and class the specifier kept, does it suit the building’s wind exposure where the project is in a high wind zone, and are the door sizes ones the manufacturer’s stock units cover? |
| Hardware, keying, and forced entry | Hardware (latch operation brackets: inside only, keyed outside with thumb-turn, or keyed both sides; screen latch; pulls; auxiliary pin locks) + master keying note (same lock manufacturer and pin tumbler count as the other doors) + Forced Entry Resistant Doors (ASTM F842 for doors designated forced entry resistant) + hardware sets and keying schedule | Do the hardware sets or the schedule give each sliding door the latch operation the bracket keeps, do keyed cylinders come from the same manufacturer as the building’s other locks so they fit the master key system, and does the schedule designate which doors must be forced entry resistant? |
| Glazing, safety, energy, and glass markings | Glazing and note (glass thickness from the standard’s glass table; double glazing to ASTM C1048; condensation resistance factor bracket by AAMA 1503; CPSC 16 CFR 1201 Category II) + glass marking bracket (design and colour indicated, or a stated size) + Extra Stock of markings bracket + glazing schedule and energy compliance documents | Does the glazing schedule show the sliding door units as factory double glazed safety glass, does the energy compliance documentation carry a U-factor and solar heat gain value for these doors, which the section does not state, are glass markings drawn on the elevations if a design is required, and is the extra stock bracket deleted if markings are not used? |
| Screens and weatherstripping | Screens note (delete if screens are not indicated on the drawings) + Screens (horizontal sliding aluminum screens; aluminum or glass fiber mesh brackets; insect-proofing at interlocking stiles) + Weatherstripping (four sides of each sliding panel and interlocking stiles and jambs) + Shop Drawing Information screen bracket + elevations and door schedule | Do the elevations or schedule show screens on the doors that get them, and has the specifier deleted the screen paragraph and every screen reference where no screens are drawn, or kept it where they are? |
| Finish, environment, and dissimilar materials | Finish notes (A31 or A32 for ESC C1 and C2; A41 or A42 for C3 through C5 and heavy wear; heavier anodic coating in C4 and C5) + Finish brackets (thickness bracket pairs A41 with a lower thickness than the C4 and C5 note asks for; no thickness for A31 or A32) + Samples Information (colour chart of factory colour coatings; Finish offers anodized only) + Protection of Aluminum from Dissimilar Materials + project ESC and details | Does the finish the specifier kept match the project’s environmental severity classification, has the thickness bracket been reconciled with the note for C4 and C5 sites, and do the sill and jamb details show isolation where aluminum meets concrete, masonry, treated wood, or dissimilar metals? |
| Installation, sealants, flashing, and submittals | Installation (per approved shop drawings; anchored plumb and level; perimeter caulking by AAMA 800 and the manufacturer) + Caulking and Sealing (Section 07 92 00) + Temporary Protective Covering note (delete for existing buildings) + Submittals notes (cite paragraphs “Manufacturer’s Catalog Data” and “Drawings” that do not exist) + head, jamb, and sill details | Do the details show the sill pan, flashing, and perimeter sealant joint the section leaves to the drawings and Section 07 92 00, is any field water test the project needs specified elsewhere, since this section has none, and has the specifier cleaned up the submittal notes so the shop drawing and product data items are clear? |
Worked example: balcony doors in an unaccompanied housing building
Illustrative example: a four-story unaccompanied housing building near the coast has a sliding glass door from each room to a balcony and a pair of sliding doors from the ground-floor dayroom to a patio. The issued Section 08 32 13 keeps the residential type bracket, the keyed outside cylinder option, screens, the A31 clear anodized finish, and the glass marking bracket. The project’s environmental severity classification is C4, the dayroom has no other exit door on the life safety plan, the door schedule lists the sliding doors without a type or class, the elevations show no screens, and the hardware sets specify cylinders from a different manufacturer than the building’s other locks.
Ask the architect to add a conventional exit door to the dayroom or revise the life safety plan, state the door type and class in the schedule, and show or delete the screens. Ask the specifier to choose the finish the C4 note recommends and reconcile its thickness bracket, and ask the hardware consultant to match the cylinder manufacturer and keyway to the master key system or drop the keyed option.
Avoid a false conflict
Section 08 32 13 covers aluminum sliding glass door units, their hardware, factory glazing, screens, finish, and installation. Swinging aluminum doors follow Section 08 11 16, storefront entrances follow Section 08 41 13, aluminum windows, including horizontal sliding windows, follow Section 08 51 13, glazing outside these factory units follows Section 08 81 00, door hardware sets and keying follow Section 08 71 00, and sealants follow Section 07 92 00, while the building code, the energy code, and the antiterrorism criteria the project follows govern egress, thermal performance, and blast resistance, none of which the section states, so check those before calling a requirement missing. Some of the section’s own wording needs resolving: the submittal notes cite two paragraphs that do not exist, the samples paragraph asks for factory colour coatings the finish paragraph does not offer, and the finish thickness bracket does not match the note for the most severe environments. Ask the specifier which wording the project intends before treating a difference as a design conflict.
When requirements disagree, follow the project’s document-control and clarification process. Do not assume that drawings always override specifications, or the reverse. Identify the exact sources and request an authorized decision.
Close the issue across the affected documents
Record the location or tag, drawing and specification references, issue dates, observed difference, and the decision needed. Assign an owner and keep the item open until the response identifies the governing requirement. Check the revised drawings and specification references together; a response email alone may leave the issued package inconsistent.
For the overall process, use the guide to drawing and specification conflicts. Mark an inapplicable checklist row with a reason, and distinguish a verified correction from a question that still needs design information.
Where Groundbook fits
Groundbook’s drawing and specification review helps investigate potential disagreements in the documents you supply. Include the relevant specification sections and drawing references, then verify the cited evidence with the responsible reviewers before acting on a finding.