In New Jersey, identify the applicable UCC subcodes and the enforcing agency’s review scope. For existing buildings, document the rehabilitation work category rather than automatically treating the whole project as new construction.
Groundbook can review your drawings against the state and local code PDFs you upload. Add the adopted code books and amendments that apply to your project, then review potential issues with links to the supporting sources.
Add your references
Upload the applicable code PDFs alongside the drawing set. Include the edition, local amendments, and project requirements.
Choose each file’s role
Set code PDFs to Code and Use as reference. Mark the drawings you want reviewed as Check this file.
Review the findings
Follow the linked drawing and reference, check applicability, and have the responsible professional verify the issue.
California code PDFs shown as an example. Upload the references that apply to your project.Try with your code PDFs
State and local references
Code references for New Jersey
Examples of references you can bring into Groundbook. Confirm the adopted edition, effective date, and project scope with the reviewing authority, then upload the applicable PDFs.
For existing-building work, include the relevant N.J.A.C. 5:23-6 provisions and identify the project’s work category.
Code names link to official agency or publisher resources. Reviewed September 9, 2026. The reference set comes from the files you supply.
New Jersey reference guide
Establish who reviews what
Build the subcode reference list
New Jersey DCA’s current-code directory lists the adopted construction subcodes and the Rehabilitation Subcode separately. Select the applicable references and effective provisions for the actual work.
DCA’s Bureau of Construction Project Review handles specified projects and reviews where the local officials lack the required enforcement-license class. Establish the appropriate agency before assembling the submission checklist.
Sources reviewed September 9, 2026. Confirm current requirements and project applicability with the reviewing authority.
Prepare a useful review
What to bring for New Jersey
Use this preparation list for Groundbook alongside the official permit checklist.
UCC code and work matrix
List the building, trade, and rehabilitation subcodes relevant to the project. Identify work categories, editions, and any transition determination.
Enforcing-agency confirmation
Provide the responsible local or state office, building classification, and applicable plan-review checklist.
Existing/proposed coordination
Supply existing and proposed drawings, demolition limits, schedules, and system interfaces. Ask reviewers to check whether the documents consistently reflect the selected rehabilitation scope.
A current drawing register
Identify which files are being checked, which are references, and which revisions are superseded. Include reviewer comments and responses where they explain an unresolved decision.
Will every New Jersey project be reviewed entirely by the municipal office?
Confirm the agency and required enforcement class. DCA identifies projects requiring Bureau of Construction Project Review involvement, including circumstances where local officials lack the necessary license class.
Which documents should I supply for a New Jersey AI plan review?
Supply the current drawing set and schedules, relevant specifications and reports, the applicable code and amendment PDFs, and the reviewing authority’s checklist. Identify the edition, project scope, and permit stage. Groundbook reviews the supplied evidence; do not assume every local requirement is already available.
Does Groundbook approve a permit or certify compliance?
No. Groundbook surfaces potential conflicts and omissions with links to source documents for professional verification. It does not issue permits, certify compliance, provide permit-expediting services, or replace the authority having jurisdiction.