Guide · Specifications and drawings · 26 36 23

Check automatic transfer switch specifications against drawings

Transfer switches are where normal and emergency power meet, and the electrical one-line, the panel schedules, and Section 26 36 23 all describe them a little differently. Small differences, such as a bypass isolation switch on one document and not another, change the equipment that gets bought.

Trace each transfer switch on the one-line into the specification and the equipment schedule, then compare its poles, rating, and neutral arrangement, whether it has a bypass/isolation switch, its transfer type (open, delayed, or closed transition), any fire pump service controls, its engine-start wiring to the generator, and its remote annunciation. The section’s Automatic Transfer Switch Drawings submittal is the place the contractor must reconcile them.

Assemble the review package

Gather the electrical one-line diagram, the transfer switch and generator schedules, the emergency and standby panel schedules, the electrical room plans with equipment layout, the fire pump and controller drawings, the generator drawings and Section 26 32 15, and the issued Section 26 36 23. Review one switch from its normal and alternate sources to its load before assuming another switch is drawn the same way.

WBDG publishes UFGS 26 36 23: Automatic Transfer Switches and By-Pass/Isolation Switch as a public guide-specification reference (accessed October 17, 2026). Use your project’s issued specification and amendments for the actual comparison; the guide specification does not automatically govern your project. The checklist below is an original suggested review workflow, not a reproduction of the UFGS requirements.

Eight checks to run against the issued set

Use one record per location or system. The CSV contains the same eight prompts plus fields for source revisions, observed evidence, the review owner, the decision, and closure references.

Eight specification-to-drawing checksSwipe or scroll sideways to read all columns.
CheckSources to compareQuestion to resolve
Switch count and tagsOne-line + equipment schedule + room plansDoes every transfer switch on the one-line appear on the schedule and the room plan with the same tag?
Rating, poles, and neutralEquipment schedule + Automatic Transfer Switches article + one-lineDo the ampere rating, number of poles, and neutral arrangement agree across the schedule, one-line, and specification?
Bypass/isolation switchBy-Pass/Isolation Switch article + one-line + room planWhere the specification retains a bypass/isolation switch, is it shown on the one-line and is there room for it in the electrical room layout?
Transfer typeDelayed Transition and Closed-Transition articles + one-line notesDoes the transfer type the specification retains match what the one-line and generator controls describe for each load?
Fire pump serviceControls for Fire Pump Service article + fire pump drawingsIf a transfer switch serves a fire pump outside the pump controller, are the added controls specified and the arrangement shown on the fire pump drawings?
Engine start and exerciserEngine Starting Contacts and Exerciser articles + generator drawingsIs engine-start wiring from each switch to the generator shown, and does only one device control generator exercising?
Remote annunciationRemote Annunciator articles + room plans + generator annunciatorIs the remote annunciator located where the specification and the facility expect it?
Testing and listingFactory Testing, Proof of Listing, and Functional Acceptance Tests articlesDo the submittals and testing match the switch use, including the medical facility testing article where the facility is a health care occupancy?

Worked example: a bypass/isolation switch the room cannot hold

Illustrative example: the issued Section 26 36 23 retains the bypass/isolation switch for the life safety transfer switch. The one-line shows a plain transfer switch, and the electrical room plan draws a cabinet footprint sized for a switch without bypass, with required working clearance against the adjacent switchboard.

Ask the electrical engineer whether bypass isolation is required for that switch, then align the one-line, schedule, and specification, and recheck the room layout and clearances with the larger equipment. Check the other emergency and standby switches for the same omission.

Avoid a false conflict

A transfer switch drawn as one symbol on the one-line can hide several choices the specification makes, such as bypass isolation, transfer type, and fire pump controls. Read the retained articles, not just the section title.

When requirements disagree, follow the project’s document-control and clarification process. Do not assume that drawings always override specifications, or the reverse. Identify the exact sources and request an authorized decision.

Close the issue across the affected documents

Record the location or tag, drawing and specification references, issue dates, observed difference, and the decision needed. Assign an owner and keep the item open until the response identifies the governing requirement. Check the revised drawings and specification references together; a response email alone may leave the issued package inconsistent.

For the overall process, use the guide to drawing and specification conflicts. Mark an inapplicable checklist row with a reason, and distinguish a verified correction from a question that still needs design information.

Where Groundbook fits

Groundbook’s drawing and specification review helps investigate potential disagreements in the documents you supply. Include the relevant specification sections and drawing references, then verify the cited evidence with the responsible reviewers before acting on a finding.

Questions, answered

FAQs

What should an automatic transfer switch review compare?

Compare switch count and tags, rating, poles, and neutral, bypass/isolation switches, transfer type, fire pump service controls, engine start and exerciser wiring, remote annunciation, and testing and listing.

Is UFGS 26 36 23 current?

WBDG lists UFGS 26 36 23 Automatic Transfer Switches and By-Pass/Isolation Switch as Active, revised February 2026 to incorporate change requests.

Does this checklist confirm the emergency power design meets NFPA 70 and NFPA 110?

No. It checks that the drawings and specification describe the same equipment. System design, selective coordination, and approval stay with the electrical engineer and the authority having jurisdiction.

Keep exploring

Continue your review

Check engine-generator specifications against drawings

Compare the generator parameter schedule, fuel, exhaust, cooling, enclosure, and paralleling across drawings and UFGS Section 26 32 15. CSV included.

Explore

NFPA 110 emergency power plan review

Review NFPA 110 emergency power documents across generators, transfer equipment, loads, rooms, and controls. Connect electrical and building interfaces.

Explore

NFPA 70 National Electrical Code plan review

Review electrical drawings against NFPA 70 (NEC) across one-lines, panel schedules, equipment, rooms, and other trades. See checks and AI review limits.

Explore

Check fire pump specifications against drawings

Compare pump sequence, driver, controller, power source, test header, fuel, and pump room layout across drawings and UFGS Section 21 30 00. CSV included.

Explore

Check low-voltage switchgear specifications against drawings

Compare drawout breakers, relays, arc mitigation, arc-resistant construction, racking, and room space across one-lines and UFGS Section 26 23 00.

Explore

Check power system study specifications against drawings

Check that the studies UFGS 26 05 73 requires cover the sources, equipment, devices, and names on the one-line, schedules, and arc flash label details.

Explore

Check UPS specifications against drawings

Compare UPS configuration, bypass, batteries, hydrogen monitoring, REPO, and generator interface across drawings and UFGS Section 26 33 53.

Explore

Drawings vs. specifications

Compare drawing requirements with specifications, schedules, and controls. Find potential equipment, material, and scope inconsistencies with Groundbook AI.