Guide · Specifications and drawings · 26 32 15

Check engine-generator specifications against drawings

Section 26 32 15 refers to an Engine-Generator Parameter Schedule that the designer has to provide, either on the drawings or in the specification. Many generator conflicts start when that schedule, the one-line, and the mechanical drawings each describe a different set.

Find the parameter schedule first and confirm there is one per generator type, then compare its rating and application with the one-line and load summary, and trace fuel storage, the day tank, exhaust, air intake, cooling, and the enclosure to the mechanical, civil, and architectural drawings. Where the set is installed indoors, check that the section’s auxiliary systems drawing requirement is matched by drawings of exhaust, intake, and cooling.

Assemble the review package

Gather the electrical one-line, load summary, and generator schedule, the parameter schedule (on the drawings or in the specification), the site plan for an outdoor set, the generator room plan and sections for an indoor set, the mechanical drawings for exhaust, combustion air, and cooling, the fuel tank and piping drawings, the structural pad or base details, and the issued Section 26 32 15 with Section 26 36 23. Review one generator from fuel to load before assuming a second set matches.

WBDG publishes UFGS 26 32 15: Engine-Generator Set Stationary 15-2500 kW, with Auxiliaries as a public guide-specification reference (accessed October 17, 2026). Use your project’s issued specification and amendments for the actual comparison; the guide specification does not automatically govern your project. The checklist below is an original suggested review workflow, not a reproduction of the UFGS requirements.

Eight checks to run against the issued set

Use one record per location or system. The CSV contains the same eight prompts plus fields for source revisions, observed evidence, the review owner, the decision, and closure references.

Eight specification-to-drawing checksSwipe or scroll sideways to read all columns.
CheckSources to compareQuestion to resolve
Parameter scheduleEngine-Generator Parameter Schedule article + drawings or specificationIs there a parameter schedule for each generator type, filled in rather than left as bracketed choices?
Rating and applicationParameter schedule + Power Ratings article + one-line and load summaryDo the rating and its application (emergency, standby, or prime) match the one-line, the load summary, and the transfer switches?
Fuel storage and day tankFuel System and Day Tank articles + fuel piping drawings + civil plansAre the main tank, day tank, fill, and fuel piping drawn where the specification places them, with capacities stated in one place?
Exhaust and air intakeExhaust System and Air Intake Equipment articles + mechanical plansIs the exhaust route drawn to a safe discharge and the combustion and cooling air path drawn for an indoor set?
Cooling systemCooling System article + mechanical plansDoes the radiator or heat exchanger type match the room arrangement and the mechanical drawings?
Enclosure and soundEngine-Generator Set Enclosure and Sound Limitations articles + site planFor an outdoor set, does the enclosure type and any sound requirement agree with the site plan and the project’s noise criteria?
Parallel operationParallel Operation and Load Sharing articles + one-lineIf the specification retains paralleling, does the one-line show the paralleling gear and multiple sets?
Mounting, vibration, and seismicVibration Isolation and Seismic Requirements articles + structural detailsAre the pad, isolators, and anchorage drawn consistent with the requirements the section retains?

Worked example: a prime-rated schedule on a standby one-line

Illustrative example: the parameter schedule in the specification lists a prime rating for the generator, while the one-line and load summary describe a standby set serving emergency and optional standby loads. The mechanical drawings show a day tank but no main fuel storage, and the specification retains the integral main fuel tank article.

Ask the electrical engineer to confirm the rating and application, then correct the parameter schedule or the one-line, and coordinate the fuel storage arrangement between the specification and the mechanical drawings. Recheck the transfer switch schedule for the same assumptions before closing the item.

Avoid a false conflict

Generator specifications carry many bracketed options. An option left in the issued section is a requirement, so a parameter schedule that still shows choices is itself a finding.

When requirements disagree, follow the project’s document-control and clarification process. Do not assume that drawings always override specifications, or the reverse. Identify the exact sources and request an authorized decision.

Close the issue across the affected documents

Record the location or tag, drawing and specification references, issue dates, observed difference, and the decision needed. Assign an owner and keep the item open until the response identifies the governing requirement. Check the revised drawings and specification references together; a response email alone may leave the issued package inconsistent.

For the overall process, use the guide to drawing and specification conflicts. Mark an inapplicable checklist row with a reason, and distinguish a verified correction from a question that still needs design information.

Where Groundbook fits

Groundbook’s drawing and specification review helps investigate potential disagreements in the documents you supply. Include the relevant specification sections and drawing references, then verify the cited evidence with the responsible reviewers before acting on a finding.

Questions, answered

FAQs

What should an engine-generator specification review compare?

Compare the parameter schedule, rating and application, fuel storage and day tank, exhaust and air intake, cooling, enclosure and sound, parallel operation, and mounting, vibration, and seismic requirements.

Is UFGS 26 32 15 current?

WBDG lists UFGS 26 32 15 Engine-Generator Set Stationary 15-2500 kW, with Auxiliaries as Active, revised February 2026. It superseded earlier generator sections, so older project manuals may use a different number.

Does this checklist size the generator?

No. It checks that the drawings and specification describe the same generator installation. Load calculations, sizing, and approval stay with the electrical engineer and the authority having jurisdiction.

Keep exploring

Continue your review

Check automatic transfer switch specifications against drawings

Compare ATS count, ratings, bypass isolation, transfer type, fire pump service, and annunciation across one-lines and UFGS Section 26 36 23. CSV included.

Explore

NFPA 110 emergency power plan review

Review NFPA 110 emergency power documents across generators, transfer equipment, loads, rooms, and controls. Connect electrical and building interfaces.

Explore

NFPA 37 stationary engine and gas turbine plan review

Review generator, fire pump engine, and gas turbine drawings against NFPA 37: rooms, fuel, exhaust, and enclosures. See document checks and AI limits.

Explore

Electrical drawing review checklist

Review electrical one-lines, panel schedules, equipment loads, circuit references, and lighting controls. Includes a worked example and a free CSV.

Explore

Check fuel storage tank specifications against drawings

Compare tank type, venting, level alarms, gauging, leak detection, grounding, and installation across drawings and UFGS Section 33 56 10.

Explore

Check switchboard specifications against drawings

Compare switchboard ratings, protective devices, drawout breakers, trip units, metering, alignment, and labels across one-lines and UFGS Section 26 24 13.

Explore

Check interior electrical distribution specifications against drawings

Compare panel schedules, feeders, conductors, raceways, grounding, and fire pump and emergency circuits across electrical drawings and UFGS 26 20 00.

Explore

Drawings vs. specifications

Compare drawing requirements with specifications, schedules, and controls. Find potential equipment, material, and scope inconsistencies with Groundbook AI.