Guide · Specifications and drawings · 07 51 13

Check built-up asphalt roofing specifications against roof plans, sections, and flashing details

UFGS Section 07 51 13 Built-Up Asphalt Roofing, a NAVFAC-prepared guide specification issued in August 2025 as a complete review of the May 2012 edition, covers hot-mopped asphalt and glass felt roofing on new and existing low-slope roofs, finished either with aggregate surfacing or with a granule-surfaced modified bitumen cap sheet. Its opening note leaves the structural deck, insulation, and sheet metal fascias, gravel stops, and flashings to other sections and points to UFC 3-110-03 Roofing. Its articles cover fire classification and wind uplift, solar reflectance, warranties, felts and base sheets, asphalt type by slope, surfacing, flashing membranes, cants, fasteners, curbs, walkpads and pavers, verification of the substrate, kettles and fire watch, ply and flashing application, cut tests, a drain flood test, infrared inspection, and a roof information card.

Start with the surfacing and the slope: confirm that the issued Section 07 51 13 keeps aggregate only where the roof plan is away from jet intakes and airfields and below the wind speed its surfacing note sets, and that each roof slope on the plan falls inside the Asphalt note’s table, which stops short of the steepest slopes the section admits. Then check that the fire and wind listings, the base sheet and its attachment, the ply direction and backnailing, the nailers and cants, the flashing, drains, and curbs, and the walkpads and rooftop items agree with the roof plan, the roof sections, the details, and Sections 06 10 00, 07 22 00, 07 60 00, and 22 00 00.

Assemble the review package

Gather the roof plan with roof areas, slopes, crickets, tapered insulation, drains, overflow drains or scuppers, curbs, penetrations, walkpads, pavers, and rooftop equipment, the roof sections showing the deck and every layer up to the surfacing, the edge, parapet, curb, nailer, cant, expansion joint, area divider, drain, and penetration details, the structural roof framing and deck drawings with the wind design criteria, the site plan showing any airfield or jet engine intakes nearby, the mechanical, plumbing, electrical, lightning protection, and PV drawings for items on the roof, the fall protection anchorage layout, the energy compliance documents with the roof R-value and any cool roof requirement, the FM or UL listing of the proposed assembly, and the issued Section 07 51 13 with Sections 06 10 00, 07 22 00, 07 60 00, and 22 00 00. Follow one roof area from its low drain to its high edge, and one curb, before assuming the others match.

WBDG publishes UFGS 07 51 13: Built-Up Asphalt Roofing as a public guide-specification reference (accessed November 10, 2026). Use your project’s issued specification and amendments for the actual comparison; the guide specification does not automatically govern your project. The checklist below is an original suggested review workflow, not a reproduction of the UFGS requirements.

Eight checks to run against the issued set

Use one record per location or system. The CSV contains the same eight prompts plus fields for source revisions, observed evidence, the review owner, the decision, and closure references.

Eight specification-to-drawing checksSwipe or scroll sideways to read all columns.
CheckSources to compareQuestion to resolve
Surfacing: aggregate or granule-surfaced cap sheetOpening surfacing note (cap sheet where aggregate could be drawn into jet intakes or blown onto people and property) + System Description bracket + Surfacing Material note (no coral in humid or higher ESC locations; no aggregate at airfields or above the basic wind speed it names) + cap sheet ESC note + UFC 1-200-01 environmental severity classification + site plan and structural wind criteria + roof planIs one system kept in the System Description bracket, aggregate-surfaced felts or felts with a granule-surfaced cap sheet, and does it agree with the roof plan, the roof sections, and the surfacing article kept, and where the building is near an airfield or jet intakes, or the structural drawings give a basic wind speed at or above the one the note names, has aggregate been deleted, and has the surfacing been checked against the climate zone and environmental severity class the notes name?
Slope and asphalt typeOpening note (slope range the section covers) + Asphalt note and slope table (asphalt type by slope and climate; Type IV in hot locations above a stated slope) + the same table repeated in the article body + Asphalt bracket (ASTM D312 type) + roof plan slopes, crickets, and tapered insulation layout + Section 07 22 00Does each roof slope on the plan and the tapered insulation layout fall within the Asphalt note’s table, which stops short of the steepest slopes the opening note admits, so that a steeper roof has no asphalt type at all, has the specifier used the inch-pound slope column, since the metric column and the sentence after the table disagree with it, is the asphalt bracket edited to the type the slopes and climate call for, and has the copy of the table printed below the note been deleted from the issued article?
Fire classification and wind upliftFire Resistance article (Class A by ASTM E108, FM 4470, or UL 790; fire-classified or Class I deck listing) and its note (Class B option only where Class A cannot be reached, with justification) + Wind Uplift Resistance article and note (rated assembly, design wind speed bracket, licensed engineer’s calculations for non-rated systems, calculated values delineated in the specification and on the drawings) + Submittals (Wind Uplift Calculations under SD-03 and SD-05) + structural wind criteria + deck drawings + FM or UL listingDo the roof drawings and the specification both state the calculated uplift values, as the wind note asks, with corner and perimeter zones, does the listed FM or UL assembly match the deck, base sheet, insulation, and attachment shown on the roof sections, has the design wind speed bracket been filled in to agree with the structural drawings, and where a wood deck or other condition cannot reach Class A, has the designer written in the Class B option and its justification, since the note refers to a Class B option the article does not contain?
Base sheet, attachment, and ply directionFelt Materials note (venting base sheet with perforations only directly on concrete decks; base sheets under insulation in the insulation section) + Base Sheet Application notes (mechanical fastening on uninsulated nailable decks; venting base sheet on wet fill and new poured concrete; direction by slope) + Ply Felts note + cap sheet article’s base sheet attachment submittal (pattern in field, corners, and perimeter) + Section 07 22 00 + roof sections and deck typeIs the base sheet kept, deleted, or moved to Section 07 22 00 to match where the roof sections place it, is a venting base sheet specified over wet fill, lightweight insulating concrete, gypsum fill, and new poured concrete, is the attachment pattern for field, corners, and perimeter listed as a submittal, since it appears only as a sentence in the cap sheet article, and since the Base Sheet and Ply Felts notes give different slopes for running sheets parallel to the slope, has the specifier set one rule that matches the roof plan?
Backnailing, nailers, and cantsBacknailing of Ply Felts note and brackets (nailing strips matching insulation thickness, nailer spacing; insulated or uninsulated nailable deck option) + Backnailing of Cap Sheet note + Verification of Conditions (wood nailers at eaves, gables, openings, and walls; nailers for base flashing height; cants) + Cant Strips article and note (perlite or wood fiber; wood cants at unsupported flashings) + Section 06 10 00 waterborne preservative note + roof sections and edge, curb, and expansion joint detailsSince the backnailing note sets two different slopes at which backnailing starts and names Type I asphalt, which the Asphalt article does not offer, has the specifier said which roof areas are backnailed, do the roof sections show nailing strips matching the insulation thickness at the spacing kept, with one inch-pound value for it, since the two brackets give different ones, are nailers drawn at every edge, opening, and wall, treated with the waterborne preservative Section 06 10 00 must specify, and are wood cants detailed where the flashing is not supported by a wall?
Substrate verification, venting, and decksVerification of Conditions article (placed in PART 2: drains, curbs, cants, and penetrations in place; surface planeness; slope to drain; edge and underside venting for wet fill; wood deck covering and plywood joint taping; insulation roofed the same day; concrete cured and tested by ASTM D4263; precast joints stripped) + Test for Surface Dryness + structural deck drawings + Section 07 22 00Do the deck drawings identify each deck type, concrete, precast, steel with lightweight fill, wood, or plywood, so that the right items of Verification of Conditions are kept, is edge or underside venting kept and detailed where the deck carries wet fill such as lightweight cellular concrete, are precast deck joints and weld plates detailed for grouting and stripping, kept once rather than in both the bracketed and the plain sentence, and has the specifier corrected “No viable moisture” and moved the article into PART 3, where it belongs?
Flashing, drains, curbs, edges, and the membrane linerBase Flashing Membrane and Membrane Flashing articles (modified bitumen base flashing, top edge fastened, membrane liner over exposed nailers and under sheet metal) + Strip Flashing + Membrane Flashing at Roof Drain note (drains in Section 22 00 00, drain flashings in Section 07 60 00) + retrofit drains to ANSI/SPRI RD-1 + Pre-fabricated Curbs article + edge systems to ANSI/SPRI/FM 4435/ES-1 + Roof Drain Test note (consult the structural engineer) + Membrane Liner article + detailsDo the parapet, curb, and edge details show the base flashing height the Verification of Conditions nailer item sets, the fastened top edge, the membrane liner under the coping and counterflashing, and edge metal matching Section 07 60 00, does each drain detail on the plumbing and roof drawings agree with the flashing and clamping ring described, are existing drains on a reroof checked against ANSI/SPRI RD-1, and before the drain flood test is kept, has the structural engineer confirmed the roof can carry the ponded water around each drain?
Traffic, rooftop items, fire watch, and warrantyWalkpads note and article + Roof Walkways (asphalt planks; no installation paragraph) + Elevated Metal Walkways and Platforms (installation paragraph; no product article) + Paver Blocks + Set-On Accessories + Lightning Protection + PV Systems (NRCA guidelines not in References) + Fall Protection Systems blank + kettles kept off the roof and Fire Watch, with NRCA 4002 and the MRCA R&NW manual not in References + Protection Against Moisture Absorption (water cutoffs written for modified bitumen) + Warranty (term fixed in text) + roof planDoes the roof plan show walkpads at every access point and service path the walkpad note calls for, with pavers under equipment supports, has the specifier either added an installation paragraph for the asphalt plank walkways or deleted them, and named the product and section for any elevated metal walkway, is the fall protection blank filled in to match the anchorage layout, are the references the fire watch and PV paragraphs rely on added to the References article, and has the water cutoff paragraph been rewritten for a built-up roof and the warranty term set to the one the note’s criteria give?

Worked example: gravel near a flight line, a slope off the table, and walkways nobody installs

Illustrative example: a new two-story maintenance hangar annex sits beside an aircraft parking apron, with a steel deck under tapered polyisocyanurate insulation and a lower wing on a steeper sloped wood deck over an existing shop. The issued Section 07 51 13 keeps the aggregate-surfaced system, the steep wing’s slope on the roof plan is steeper than any row of the Asphalt note’s table, and the asphalt bracket keeps every type. The roof sections show a base sheet over the insulation, while Section 07 22 00 also specifies one. The Fire Resistance article still requires Class A over the wood deck with no justification on file, the walkpad article and the asphalt plank walkways are both kept but the roof plan shows no walkways, and the fire watch paragraph points to NRCA 4002, which the References article does not list.

Ask the architect and the roof consultant to switch the annex to the granule-surfaced cap sheet, as the opening note directs where aggregate could be drawn into jet intakes, and to confirm with the structural engineer that the basic wind speed does not rule out aggregate elsewhere. Ask the specifier to select the asphalt type for the steep wing from the manufacturer’s requirements or move that wing to a steep-slope or other low-slope system, since the table gives no type for it, to keep the base sheet in one section, and to decide whether the wood deck can reach Class A or to add a justified Class B option. Ask the architect to draw walkpads at the hatch and each rooftop unit and to keep one walkway product with an installation paragraph, and ask the specifier to add NRCA 4002 and the MRCA manual to the References article or delete them.

See the published rooftop equipment support finding. The illustrative scenario above is separate from that published finding.

Avoid a false conflict

Section 07 51 13 covers the hot-mopped built-up membrane, its modified bitumen base flashing and cap sheet, and its aggregate surfacing. Its opening note leaves the structural deck, insulation, and sheet metal fascias, gravel stops, and flashings to other sections: insulation, cover boards, and base sheets under insulation follow Section 07 22 00 and the roof insulation guide, counterflashing, edge metal, and drain flashings follow Section 07 60 00, wood nailers and their preservative treatment follow Section 06 10 00, and roof drains follow Section 22 00 00, so check those before calling a requirement missing. Modified bitumen sheet roofing is UFGS 07 52 00, EPDM is 07 53 23, TPO is 07 54 23, and below-grade built-up membranes are 07 12 00; see those guides. The section’s quality control note asks for a registered roof consultant, engineer, or architect experienced in roofing on the design team for larger or mission-critical roofs, and its notes point to UFC 3-110-03 Roofing, UFC 1-200-01, and ASHRAE 90.1. Wind uplift, fire classification, the roof’s capacity for ponded water and equipment, and energy performance are decisions for the architect, the structural engineer, and the roof consultant, and the warranty is settled between the owner and the manufacturer. The current guide section cites ASCE 7-22, FM 4470, UL 790, ASTM E108, ASTM D312, D2178, D4601, D4897, D6162, D6163, D6164, D1863, D3617, D4263, and C1153, ANSI/SPRI RD-1, and ANSI/SPRI/FM 4435/ES-1; confirm the editions your project invokes.

When requirements disagree, follow the project’s document-control and clarification process. Do not assume that drawings always override specifications, or the reverse. Identify the exact sources and request an authorized decision.

Close the issue across the affected documents

Record the location or tag, drawing and specification references, issue dates, observed difference, and the decision needed. Assign an owner and keep the item open until the response identifies the governing requirement. Check the revised drawings and specification references together; a response email alone may leave the issued package inconsistent.

For the overall process, use the guide to drawing and specification conflicts. Mark an inapplicable checklist row with a reason, and distinguish a verified correction from a question that still needs design information.

Where Groundbook fits

Groundbook’s drawing and specification review helps investigate potential disagreements in the documents you supply. Include the relevant specification sections and drawing references, then verify the cited evidence with the responsible reviewers before acting on a finding.

Questions, answered

FAQs

What should a built-up asphalt roofing specification review compare?

Compare the surfacing choice, the roof slopes and the asphalt type, the fire classification and wind uplift listing, the base sheet, its attachment, and the ply direction, backnailing, nailers, and cants, substrate verification and venting, flashing, drains, curbs, edges, and the membrane liner, and walkpads, rooftop items, hot work, and the warranty.

When should a built-up roof use a cap sheet instead of gravel?

The current UFGS 07 51 13 Built-Up Asphalt Roofing on WBDG generally prefers aggregate or a granule-surfaced modified bitumen cap sheet over a smooth surface, and its notes call for the cap sheet where aggregate could be drawn into jet aircraft intakes or blown onto people and property. Its surfacing note also rules out aggregate at airfields and above a stated basic wind speed, and rules out coral in humid or higher environmental severity locations. UFGS numbers are DoD guide specification numbers, not universal MasterFormat titles, and your project’s issued specification governs.

How do I pick the asphalt type for a built-up roof?

The section’s Asphalt note pairs the ASTM D312 asphalt type with roof slope and climate in a short table. Check every slope on the roof plan and the tapered insulation layout against it, use the inch-pound slope column, since the metric column does not match it, and note that the table stops short of the steepest slopes the section’s opening note admits, so a steeper roof needs the manufacturer’s requirement or a different system.

What must built-up roofing drawings show for wind uplift?

The section’s wind note asks for the calculated uplift values to be stated in the roof specification and on the drawings, and its article asks for an FM-tested rated assembly installed for the wind loads indicated or calculated under ASCE 7-22, with a licensed engineer’s calculations for any non-rated system. Check that the listed assembly matches the deck, insulation, base sheet, and attachment on the roof sections; the wind design itself belongs to the structural engineer and the roof consultant.

Can Groundbook check built-up roofing drawings against Section 07 51 13?

Groundbook compares the drawing set with the reference documents you upload, such as your issued Section 07 51 13, the roof insulation, flashing, carpentry, and plumbing sections, the FM or UL listing, the structural wind criteria, and licensed codes or standards you hold, and links each potential disagreement to both sources. It has no built-in code library and does not calculate wind uplift or roof loads, certify fire or wind ratings, design the roof, or decide warranty questions. Each finding is a question for the architect, the roof consultant, or the structural engineer.

Keep exploring

Continue your review

Check modified bitumen roofing specifications against roof plans and details

Compare SBS and APP plies, torch limits at wood curbs and nailers, base sheet, flashing, drains, walkpads, and wind and fire listings with UFGS 07 52 00.

Explore

Check EPDM roofing specifications against roof plans and details

Compare EPDM attachment method, ballast and pavers, seam tape, perimeter fastening, flashing, drain sumps, wind zones, and insulation with UFGS 07 53 23.

Explore

Check roofing membrane specifications against drawings

Compare TPO roofing membrane scope, substrate, flashing, drainage, and warranty requirements across roof plans and specifications.

Explore

Check roof insulation specifications against roof plans and details

Compare roof insulation R-value, tapered layout, thermal barrier, wind attachment zones, vapor retarder, and nailers with UFGS 07 22 00.

Explore

Check flashing and sheet metal specifications against roof and wall details

Compare sheet metal choices, gutters and downspouts, copings, counterflashing and reglets, expansion joints, and roof edge wind uplift with UFGS 07 60 00.

Explore

Check sprayed polyurethane foam roofing specifications against roof plans, deck slopes, and termination details

Compare SPF deck and slope, foam thickness, fire and wind listing, coating type and thickness, curbs, walkways, and air intakes with UFGS 07 57 13.

Explore

UFC 3-110-03 Roofing review of DoD roof plans, details, and specifications

Review DoD roof drawings and specs against the reissued UFC 3-110-03: NRCA and MBMA basis, decks, cover boards, drainage, PV, and recover.

Explore

ASCE 7 design load criteria plan review

Review drawings against ASCE 7: design criteria notes, risk category, wind, snow, and seismic data, and loads for delegated design. With a published finding.

Explore

SDI steel deck review: deck type, thickness, finish, attachment, side laps, diaphragms, and composite slabs

Review roof and floor deck against ANSI/SDI SD-2022: deck type, gauge, finish, attachment, side laps, diaphragm schedule, and composite slabs. With AI limits.

Explore

ASHRAE 90.1 energy standard plan review

Review commercial drawings against ASHRAE 90.1: edition, compliance path, envelope, HVAC, controls, lighting, and power documents. See checks and AI limits.

Explore

Roofing and waterproofing review checklist

Trace slope, drainage, overflow, edges, penetrations, and transitions through a roof and below-grade package. 12 prompts and a free editable CSV.

Explore

Check built-up bituminous waterproofing specifications against foundation, footing, and penetration details

Compare built-up waterproofing plies, asphalt type, keyed footing flashing, sleeves, drains, reglets, protection board, and flood tests with UFGS 07 12 00.

Explore

Drawings vs. specifications

Compare drawing requirements with specifications, schedules, and controls. Find potential equipment, material, and scope inconsistencies with Groundbook AI.

Explore

Bring your next set into focus

Set up a review or talk through your project with our team.

Check built-up asphalt roofing against your roof drawings

Trusted by hundreds of professionals